Forwards Insp Repts 50-327/88-15 & 50-328/88-15 on 880208-12.No Violations or Deviations Noted
ML20151B353
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/28/1988
From: Mccoy F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20151B357 List:
References
NUDOCS 8804080185
Download: ML20151B353 (2)


See also: IR 05000327/1988015

Text

F

., j .

1 +

,

.

,

8. tu d

b4bg

>

t

Docket Nos. 50-327, 50-328

License No:. DPR-77, DPR-79

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-15 AND 50-328/88-15

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by K. Jenison on February 8-12, 1988. The inspection included a review of

activities authorized for your Sequoyah facility, and was conducted to

determine if the programs and corrective actions implemented were effective

in assuring adverse conditions, including generic issues, were dispositioned

adequately. At the conclusion of the inspection, the findings were discussed  ;

with those members of your staff identified in the enclosed inspection report. ,

Areas examined during the inspection are identified in the report. Within  ;

these areas, the inspection consisted of selective examinations of procedures  !

and representative records, interviews with personnel, and observation of i

'

activities in progress.

Within the scope of the inspection, no violations or deviations were I

identified.

The enclosed Inspection Report documents commitments (see summary paragraph)

made by a licensee representative and discussed in the exit interview, These

commitments concern the evaluation and correction of Conditions Adverse to

Quality. If your understanding of these commitments differs from the report

statements, please inform this office promptly.

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

l

l

l

8804080185 880328

PDR ADOCK 05000327 \

Q DCD II

s

t 1E /*

,

' -

..' -

.

.

.

,. -

Tennessee Valley Authority 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Frank R. McCoy

Startup Manager

TVA Projects Division

Enclosure:

NRC Inspection Report

cc w/ encl:

H. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

J. A. Kirkebo, Director,

Nuclear Engineering

R. L. Gridley, Director

Nuclear Safety and Licensing

M. R. Harding Site Licensing

Manager

TVA Representative, Rockville Office

bec w/ enc 1:

S. D. Ebneter, OSP

S. D. Richardson, OSP ,

G. G. Zech, OSP l

B. D. Liaw, OSP '

W. S. Little, OSP/RII

F. R. McCoy, OSP/RII

R. E. Carroll, OSP/RII l

J. B. Brady, OSP/RII

J. Rutberg, OGC i

NRC Resident Inspector i

DRS Technical Assistant

NRC Document Control Desk

State of Tennessee

RII, ,

,

GHu :ser

03/://88