March 31, 1988 Docket No. 50-344
, DISTRIBUTION F Docket F11e-WJones NRC & Local ^PDRs EButcher GMHolahan ACRS(10)
Mr. David W. Cockfield JLee GPA/PA Vice President, Nuclear TChan ARM /LFMB Portland General Electric Company OGC-WF PD5 Plant File 121 S.W. Salmon Street DHagan Portland, Oregon 97204 EJordan JPartlow
Dear Mr. Ceckfield:
TBarnhart(4)
SUBJECT:
ISSUANCE OF AMENDHENT NO. IM TO FACILITY OPERATING LICENSE NO. NPF-1, TROJAN NUCLEAR PLANT (TAC N0. 66741)
The Comission has issued the enclosed Amendment No. S? to Facility Operating License No. NPF-1 for the Trojan Nuclear Plant.
The amendment consists of changes to the Technical Specifications in response to your application (LCA 153) dated November 13, 1987.
The amendment revisas Trojan Technical Specification Section 3/4.10. "Special Test Exceptions" by extending the surveillance time period for verifying control rod insertability during control rod worth and shutdown margin tests.
from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
1 A copy of the related Safety Evaluation is also enclosed. The notice of issuance w*ll be included in the Comission's next regular bi-weekly _ Federal Register notice.
Sincerely, original signed by Terence Chan Terence L. Chan, Project Manager Project Directorate V i
Division of Reactor Projects - III, IV, V and Special Projects
Enclosures:
1.
Amendment No.
to NPF-1 2.
Safaty Evaluation cc w/ enclosures:
See next page (Y
of p A
y
,h5 08>/PDS DRSP/PD5 NRR/SRXB 0
DRS Jt TChan MWHodges pth J/p$ ton GWK 3/
/88 3//p/88 3 /q /88
- 3/2y /
/88 0FFICIAL RECORD COPY 8804000186 080331 PDR ADOCK 05000344 P
o
>D CEQvg o
UNITED STATES i
o g
g'
{7 g
NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D. C. 20555
%g
/
March 31, 1988 Docket No. 50-344 Mr. David W. Cockfield Vice President, Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Cockfield:
SUBJECT:
ISSUANCE OF AMENDMENT N0.139 TO FACILITY OPERATING LICENSE NO. NPF-1, TROJAN NUC!. EAR PLANT (TAC NO. 66741)
The Commission has issued the enclosed Amendment No.139 to Facility Operating License No. NPF-1 for the Trojan Nuclear Plant.
The amendment consists of changes to the Technical Specifications in response to your application (LCA 153) dated November 13, 1987.
The amendment revises Trojan Technical Specification Section 3/4.10. "Special Test Exceptions" by extending the surveillance time period for; verifying control rod insertability during control rod worth and shutdown margin tests from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days.
A copy of the related Safety Evaluation is also enclosed.
The notice of issuance will be included in the Comission's next regular bi-weekly Federal Register notice.
Sincer Ty, 4%. +
t-Terence L. Chan, Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects
Enclosures:
1 1.
Amendment No.139 to NPF-1 2.
Safety Evaluation cc w/ enclosures:
See raext page
o s
Mr. David W. Cockfield General Electric Company Trojan Nuclear Plant PortlaSd cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairnen Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. William T. Dixon Oregoa Department of Energy Salem, Oregon 97310 Regional Administrater, Region Y U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 r
~
+
w 1rm
-