Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151J079 + (11:19:28, 11 December 2024)
- B16640, Responds to NRC Re Violations Noted in Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519. Corrective Actions:Feedwater Valves 1-FW-107A & 1-FW-107B Locked in Field & Rev of Locked Valve Instruction Approved + (11:19:29, 11 December 2024)
- ML20151J071 + (11:19:29, 11 December 2024)
- ML20151J067 + (11:19:30, 11 December 2024)
- ML20151J062 + (11:19:31, 11 December 2024)
- RBG-28318, Responds to NRC Bulletin 87-002,Suppls 1 & 2 Re Fastener Testing to Determine Conformance W/Applicable Matl Specs. Info Requested by Action Items 1 & 2 Encl + (11:19:31, 11 December 2024)
- IR 05000277/1988020 + (11:19:35, 11 December 2024)
- ML20151J053 + (11:19:36, 11 December 2024)
- ML20151J047 + (11:19:48, 11 December 2024)
- ML20151J045 + (11:19:49, 11 December 2024)
- 05000336/LER-1997-025-02, :on 910828,discovered Potential of Single Failure of AFW Sys Via Condenser Hotwell make-up Valve. Caused by Failure to Consider Single Failure Scenarios.Night Order Issued to Maintain Condensate Storage Tank at 76% + (11:19:50, 11 December 2024)
- ML20151J041 + (11:19:51, 11 December 2024)
- ML20151J034 + (11:19:53, 11 December 2024)
- 05000336/LER-1997-025, Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed + (11:19:54, 11 December 2024)
- ML20151J032 + (11:19:54, 11 December 2024)
- ML20151J027 + (11:19:55, 11 December 2024)
- ML20151J025 + (11:19:56, 11 December 2024)
- ML20151J023 + (11:19:57, 11 December 2024)
- ML20151J021 + (11:19:58, 11 December 2024)
- ML20151J022 + (11:19:58, 11 December 2024)
- ML20151J018 + (11:19:59, 11 December 2024)
- ML20151J016 + (11:20:00, 11 December 2024)
- ML20151J013 + (11:20:01, 11 December 2024)
- ML20151J008 + (11:20:02, 11 December 2024)
- ML20151J011 + (11:20:02, 11 December 2024)
- ML20151J006 + (11:20:03, 11 December 2024)
- ML20151J003 + (11:20:04, 11 December 2024)
- ML20151J004 + (11:20:04, 11 December 2024)
- ML20151J001 + (11:20:08, 11 December 2024)
- ML20151H997 + (11:20:09, 11 December 2024)
- ML20151H993 + (11:20:10, 11 December 2024)
- ML20151H995 + (11:20:10, 11 December 2024)
- 05000265/LER-1997-008-05, :on 970629,five Control Rod Drives Did Not Receive Required Scram Insertion Time Testing Prior to 40% Power.Caused by Ineffective Operations.Rods Associated with Nwr Were Scram Timed & Declared Operable + (11:20:12, 11 December 2024)
- ML20151H988 + (11:20:13, 11 December 2024)
- ML20151H985 + (11:20:14, 11 December 2024)
- ML20151H984 + (11:20:15, 11 December 2024)
- ML20151H982 + (11:20:16, 11 December 2024)
- ML20151H983 + (11:20:16, 11 December 2024)
- ML20151H980 + (11:20:17, 11 December 2024)
- ML20151H979 + (11:20:17, 11 December 2024)
- 0CAN078807, Responds to NRC Bulletin 87-002,Suppl 2,dtd 880610,providing List of Names & Addresses of Suppliers & Mfgs from Which Safety or nonsafety-related Ferrous Fasteners Have Been Purchased within Past 10 & 5 Yrs,Respectively + (11:20:18, 11 December 2024)
- ML20151H975 + (11:20:19, 11 December 2024)
- ML20151H971 + (11:20:20, 11 December 2024)
- ML20151H974 + (11:20:20, 11 December 2024)
- ML20151H970 + (11:20:21, 11 December 2024)
- ML20151H969 + (11:20:21, 11 December 2024)
- PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve + (11:20:22, 11 December 2024)
- ML20151H967 + (11:20:23, 11 December 2024)
- ML20151H965 + (11:20:23, 11 December 2024)
- ML20151H964 + (11:20:25, 11 December 2024)
- ML20151H962 + (11:20:26, 11 December 2024)
- ST-HL-AE-2612, Responds to NRC Re Violations Noted in Insp Repts 50-498/88-08 & 50-499/88-01.Corrective Actions:New & Revised Emergency Plan Implementing Procedures Issued Since License Obtained Submitted to NRC + (11:20:26, 11 December 2024)