Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151N465 + (10:45:43, 11 December 2024)
- ML20151N470 + (10:45:43, 11 December 2024)
- ML20151N462 + (10:45:44, 11 December 2024)
- IR 05000457/1988012 + (10:45:46, 11 December 2024)
- ST-HL-AE-1556, Second Interim Deficiency Rept Re Control of Bechtel Std Computer Programs.Initially Reported on 850905.Bechtel Conducted QA Mgt Audit of Western Power Div.Error Notices Under Evaluation.Next Rept Will Be Submitted by 860327 + (10:45:46, 11 December 2024)
- ML20151N453 + (10:45:47, 11 December 2024)
- ML20151N448 + (10:45:48, 11 December 2024)
- ML20151N446 + (10:45:49, 11 December 2024)
- ML20151N442 + (10:45:52, 11 December 2024)
- ML20151N432 + (10:45:53, 11 December 2024)
- ML20151N429 + (10:45:54, 11 December 2024)
- ML20151N428 + (10:45:55, 11 December 2024)
- ML20151N424 + (10:45:56, 11 December 2024)
- NRC-88-3360, Forwards Amend 2 to Proprietary & Nonproprietary RESAR-SP/90 Pda Module 11, Radiation Protection & RESAR-SP/90 Pda Module 12, Waste Mgt. Proprietary Repts Withheld (Ref 10CFR2.790) + (10:45:56, 11 December 2024)
- ML20151N419 + (10:45:57, 11 December 2024)
- ML20151N417 + (10:45:58, 11 December 2024)
- ML20151N412 + (10:45:59, 11 December 2024)
- ML20151N410 + (10:45:59, 11 December 2024)
- ML20151N408 + (10:46:00, 11 December 2024)
- ML20151N406 + (10:46:01, 11 December 2024)
- A071168, Clarifies Util Containing Interpretation That 10CFR50.59 Would Govern Whether or Not Prior NRC Approval Required to Use Temporary Spent Fuel Racks for long-term Spent Fuel Storage + (10:46:02, 11 December 2024)
- B12956, Informs NRC of Interim Compensatory Measures That Will Be Taken While Shutdown Cooling Sys (SDC) Inoperable.Posting Fire Watch in Switchgear Room Provides Added Assurance of Availability of Components Needed to Achieve Cold Shutdown + (10:46:03, 11 December 2024)
- ML20151N398 + (10:46:03, 11 December 2024)
- IR 05000458/1985072 + (10:46:04, 11 December 2024)
- ML20151N392 + (10:46:05, 11 December 2024)
- ML20151N389 + (10:46:06, 11 December 2024)
- ML20151N380 + (10:46:07, 11 December 2024)
- ML20151N384 + (10:46:07, 11 December 2024)
- 05000416/LER-1988-011, :on 880317,inadvertent RHR Pump Start Occurred During Monthly Functional Test of RHR Pump B Start Time Delay.Caused by Electrician Error.Appropriate Personnel Will Be Retrained & Procedures Will Be Enhanced + (10:46:09, 11 December 2024)
- ML20151N377 + (10:46:10, 11 December 2024)
- ML20151N367 + (10:46:11, 11 December 2024)
- ML20151N362 + (10:46:12, 11 December 2024)
- ML20151N359 + (10:46:13, 11 December 2024)
- ML20151N357 + (10:46:14, 11 December 2024)
- ML20151N351 + (10:46:15, 11 December 2024)
- ML20151N344 + (10:46:22, 11 December 2024)
- ML20151N341 + (10:46:23, 11 December 2024)
- IR 05000263/1988008 + (10:46:24, 11 December 2024)
- 05000344/LER-1988-021, :on 880703,two Component Cooling Water Valves Returned to Svc After Maint W/O Being Demonstrated Operable Per Tech Specs.Caused by Personnel Error.Stroke Time Valve Testing Performed to Demonstrate Operability + (10:46:31, 11 December 2024)
- B12875, Forwards Temporary Change to Physical Security Plan Re Protected Area Boundary.Rev Withheld (Ref 10CFR72.790(a)) + (10:46:34, 11 December 2024)
- ML20151N316 + (10:46:34, 11 December 2024)
- ML20151N314 + (10:46:35, 11 December 2024)
- ML20151N306 + (10:46:36, 11 December 2024)
- ML20151N302 + (10:46:37, 11 December 2024)
- ML20151N300 + (10:46:38, 11 December 2024)
- ML20151N291 + (10:46:40, 11 December 2024)
- ML20151N289 + (10:46:41, 11 December 2024)
- A07132, Informs That Payment of Third Quarterly Installment of 1988 Annual Fee Per 10CFR171 Will Be Wire Transferred on 880429 + (10:46:42, 11 December 2024)
- ML20151N281 + (10:46:42, 11 December 2024)
- ML20151N276 + (10:46:43, 11 December 2024)
- ML20151N273 + (10:46:44, 11 December 2024)
- 2CAN078810, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept,Per Tech Spec 4.6.1.2 + (10:46:45, 11 December 2024)