A.

. DEC 2 41985 Docket No. 50-461 Mr. Frank A. Spongenberg Manager - Licensir.g and Safety Clinton Power Station P.O. Cox 306 Mail Code V920 Clirtcn, Illinois 61727

Dear Mr. Spangenberg:

SUBJECT:

CLlhTON GUARD QUALIFICATION TRAINING FLAN AND SECURITY CONTlhGENCY PLAN We have completed our review of the recently submitted Fevisico 6 to the Clinton Physical Security Plan, Revision 5 to the Clinton Guard Qualification and Training Plan, ard Pevision 3 to the Clinton Security Contingency Plan. Based on this review, we conclude that these plans continue to be in accordance with cur regulatory requirements.

Encicsed is a cnrcnology of the evolution of the various staff-approved Clir. ten security plans. We request that this chrcnolcgy te paintained with the saf e-guards plans. This docur:cntation will establish a record fcr use by hRC inspec-ters, of current staff-approved safeguards amendments.

Sincerely, liy Walter R. Butler, Directer EKR Froject Directorate No. 4 Division of BWR Licensing Erclosure:

As stated cc: See next page DISTRICUTICh: Docket File NRC PDR Local PDR PDd4 Reading P8errero Goddard, OELD EJordan BGrimes J Fa rticu BSiegel EHylton ACRS (10) JGibson RSkel ton PD44/D  ?

FD44I.f1b BSie J WButler '

12/( /E5 12/3y85 l

8601020066, 851224 PDR ADOCK 05000461 p PDR

I

+ 'o UNITED STATES

' g 8" o NUCLEAR REGULATORY COMMISSION

t WASHINGTON, D. C. 20555

?

)

\ *****

/ ggt 2 1983 i

I

! Docket No. 50-461

)1 i Mr. Frank A. Spangenberg j Manager - Licensing and Safety  ;

'Clinton Power Station "

, P.O. Box 306 j Mail Code V920 i Clinton, Illinois 61727 1

)

Dear Mr. Spangenberg:

SUBJECT:

CLINTON GUARD QUALIFICATION TRAINING PLAN AND SECURITY '

j CONTINGENCY PLAN 4

We have conpleted our review of the recently subnitted Pevision 6 to the Clinton l Fhysical Security Plan, Revision 5 to the Clinton Guard Qualification and Training .

I Flan, and Revision 3 to the Clinton Security Contingency Plan. Based or, this  !

i review, we cor.clude that these plans continue to be in accordance with our i regulatory requirements.

l t j Erclosed is a chronology of the evolution of the various staff-approved Clinton i

! security plars. Kc request that this chronology be maintained with the safe-

! guards plans. This occuentation will establish a roccrd for use by NRC inspec-j tors, of current staff-opproved safeguards arrendments.

) Sincerely,

/

, Walter R. Butler, Director

] BWR Project Directorate No. 4 l Division of BWR Licensing l l Enclosure- l t As stated (

)  !

i cc: See next page l l t i

i l

t l

I b

Clinton Power Station Mr. Frank A. Spangenberg Illinois Power Company Unit 1 cc:

Mark Jason Jean Foy, Esquire Assistant Attorney General 511 W. Nevada Public Utilities Division Urbana, Illinois 61801 Office of the Attorney General State of Illinois Center Richard B. Hubbard 100 West Randolph Street - 12th Floor Vice President Chicago, Illinois 60601 Technical Associates 1723 Hamilton Avenue - Suite K Mr. D. P. Hall San Jose, California 95125 Vice President Clinton Power Station P. O. Box 678 Clinton, Illinois, 61727 Mr. D. C. Shelton Manager-Nur' ear Station Engineering Opt.

Clintor Pcwcr Station P. O. Box 678 Clinton, Illinois 61727 Sheldon Zabel, Esquire Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago, Illir.ois f0f06 Resident Inspector U. 5. Nuclear Regulatory Commission RR 3, Ecx 229 A

Clinton, Illinois 61727 Mr. R. C. Heicer Project Manager Sargent & Lundy Ergincers 55 East Monroe Street Chicago, Illinois 6C603 l Mr. L. Larson Project Manager General Electric Company l 175 Curtner Avenue, N/C 395 i San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 I

i

  • Enclosure 3

CLINTON POWER STATION UNIT #1 The approved security plans for the Clinton Power Station Unit #1 consist of the following amendaents, revisions and changes:

"Clinton Power Station Physical Security Plan"

- Revision 1. dated December 1,1979 (by letter dated December 1,1979)

, as revised by:

- Revision 2 dated November 12,1981 (by letter dated flovenber 12, 1981)

- Revision 3.' Undated, by letter dated March 23, 1982)

- Revision 4. Undated, by letter dated Septenber 30, 1982)

- Revision 5. Undate', by letter dated April 12, 1985)

- Revision 6, Undated, by letter September 20, 1985) ,

"Clinton Power Station Guard Qualification and Training Plan"

- Revision 0. Undated (by letter dated April 16, 1981) es revised by

i - Revision 1. Undated by letter dated August 18, 1981)

! -Revision 2. Undated by letter dated November 2,1981)

- Revision 3, Undated by letter dated August 27, 1982) -

Revision 4. March 7,1985 (by letter dated April 12, 1985) i - Revision 5. Undated (by letter dated September 19, 1985) l "Clinton Power Station Safeguards Contingency Plan" ,

I l j - Revision 0. December 1.1979 (by letter dated Decenber 1,1979) i as revised by: ,

- Revision 1. September 9.1981 (by letter dated Septenber 9,1981) '

- Revision 2. May 17,1985 (by letter dated May 30,1985)  !

- Revision 3 Undated (by letter dated Septenber 20,.1905) ,

1 I

t i ,

i  !

t

l I

r 4

-