Forwards Safety Evaluation Supporting Rev to Position Re Nuclear Sys Protection Sys self-test Sys (STS) Failure Detection & Indication.Licensee Request to Operate STS as Described in 880602 Submittal Acceptable
ML20151N465
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/28/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
Shared Package
ML20151N468 List:
References
TAC-68306, NUDOCS 8808090008
Download: ML20151N465 (4)


Text

__

DISTRIBUTION; July 28, 1988 Obocket: TITS"d BGrines NRC & Local PDRs TBarnhart (4)

PDIII-2 r/f WJones Docket No. 50-461 DCrutchfield EButcher GHolahan AR?t/LFMB Mr. Frank Spangenberg, Manager LLuther GPA/PA Licensing and Safety JStevens ACRS (10)

Clinton Power Station 0GC-WF PDIII-2 Plant File Post Office Box G78 DHagan Mail Code V920 Clinton, IL 61727

Dear Mr. Spangenberg:

SUBJECT:

NUCLEAR SYSTEMS PROTECTION SYSTEM (NSPS) SELF-TEST SYSTEM (STS)

FAILURE DETECTION AND INDICATION (TAC N0. 68306)

RE:

Clinton Power Station, Unit 1 By letter dated June 2,1988, Illinois Power Company (IP) submitted a request for a revision to their position concerning the Nuclear Systems Protection System (NSPS) Self-Test System (STS) Failure Detection and Indication for the Clinton Power Station. The staff's safety evaluation of IP's submittal is enclosed. Based on our evaluation, the staff concludes that the licensee's request to operate the STS in the manner described in their submittal is acceptable.

For further information or clarification, please contact me at (201) 492-1397.

/ 's r

Janice A. Stevens, Project Manager Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects cc:

See next page

  • See Previous Concurrence PDIII-2*

PDIII-?gC2_

PDIII-2 DMullg/88' JStevens:km LLuther r

07/26/88 1/M/88 F

7/20 W

\\ \\

$geo9aoosseo72s p

ADOCK 05000461 PDC

d Docket No. 50-461 Mr. Frank Spangenberg, Manager Licensing and Safety Clinton Power Station Post Office Box 673 Mail Code V920 Clinton, IL 61727

Dear Mr. Spangenberg:

SUBJECT:

i;UCL R SYSTEMS PROTECTION SYSTEM (NSPS) SELF-TEST SYSTEM (STS)

FAILU-DETECTION AND INDICATION (TAC NO. 68306)

RE:

Clinton P er Station, Unit 1 By letter dated June 2, 1 8, Illinois Power Company (IP) submitted a request for a revision to their pos ion concerning the Nuclear Systems Protection System (NSPS) Self-Test Syste (STS) Failure Detection and Indication for the Clinton Power Station. The sta

's safety evaluation of IP's submittal is enclosed.

Based on our evaluatio the staff concludes that the licensee's request to operate the STS in the m ner described in their submittal is acceptable.

For further information or clarification, please contact me at (301) 492-1397.

Janice A.

evens, Project Manager Directorate I-2 Division of Reactor Projects - III, IV, V and Spec 1 Projects cc: See next page PDIII-2 PDIII-2 PDIII-2 JStevens.

LLuther DMuller y g 6/88

/

/88

/

/88 9

--m

..e,

49 UNITED STATES g

NUCLEAR REGULATORY COMMISSION g

j WASHINGTO N, D. C. 20555

'g

/

July 28, 1988 Docket No. 50-461 Mr. Frank Spangenberg, Managar Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 Clinton, IL 61727

Dear Mr. Spangenberg:

SUBJECT:

NUCLEAR SYSTEMS PROTECTION SYSTEM (NSPS) SELF-TEST SYSTEM (ST3)

FAILURE DETECTION AND INDICATION (TAC N0. 68306)

RE:

Clinton Power Station, Unit 1 By letter dated June 2, 1988, Illinois Power Company (IP) submitted a request for a revision to their position concerning the Nuclear Systems Protection System (NSPS) Self-Test System (STS) Failure Detection and Indication for the Clinton Power Station. The staff's safety evaluation of IP's submittal is enclosed. Based on our evaluation, the staff concludes that the licensee's request to operate the STS in the manner described in their submittal is acceptable.

For further infonnation or clarification, please contact me at (301) 492-1397.

C+ d. %

Q Janice A. Stevens, Project Manager Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page

Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit 1 i

cc:

Mr. L. Larson Mr. D. P. Hall Project Manager Vice President General Flectric Company Clinton Power Station 175 Curtnur Avenue, N/C 395 P. O. Box 678 San Jote, California 95125 Clinton, Illinois, 61727 Regional Administrator, Region III Mr. R. D. Freeman 799 Roosevelt Road, Bldg. f4 Manager-Nuclear Station Engineering Dept.

Glen Ellyn, Illinois 60137 Clinton Power Station P. O. Box 678 Chairman of Dewitt County Clinton, Illinois 61727 c/o County Clerk's Office DeWitt County Courthouse Sheldon Zabel, Esquire Clinton, Illinois 61727 Schiff, Hardin & Waite 7200 Sears Tower Illinois Department 233 Wacker Drive of Nuclear Safety Chicago, Illinois 60606 Division of Engineering 1035 Outer Park Drive, 5th Floor Resident Inspector Springfield, Illinois 62704 U. S. Nuclear Regulatory Comission RR 3, Box 229 A Mr. Donald Schopfer Clinton, Illinois 61727 Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 I

l

~v w----.-

-.. - -