Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- VPN-061-98, Requests That Further Review of License Change Application LCA-238 Be Suspended as Result of Progress Made in Decommissioning,Installation of Natural Gas Pipe Line + (04:55:29, 11 December 2024)
- ML20154M416 + (04:55:29, 11 December 2024)
- ML20154M414 + (04:55:32, 11 December 2024)
- ML20154M411 + (04:55:33, 11 December 2024)
- ML20154M413 + (04:55:33, 11 December 2024)
- 05000327/LER-1988-014-01, :on 880314,noncompliance W/Configuration Control Requirements Following post-mod Test of Radiation Monitor Resulted in Containment Ventilation Isolation.Caused by Personnel Error.Personnel Counseled + (04:55:35, 11 December 2024)
- ML20154M409 + (04:55:36, 11 December 2024)
- IR 05000352/1988011 + (04:55:40, 11 December 2024)
- ML20154M407 + (04:55:40, 11 December 2024)
- ML20154M403 + (04:55:41, 11 December 2024)
- NPL-98-0849, Submits Rev of Duty Technical Advisor (Dta) Commitments to Support Transition to on-shift Shift Technical Advisor (STA) & Revising Requirements for Personnel Experience of STAs + (04:55:45, 11 December 2024)
- ML20154M399 + (04:55:45, 11 December 2024)
- ML20154M398 + (04:55:46, 11 December 2024)
- ML20154M395 + (04:55:46, 11 December 2024)
- ML20154M393 + (04:55:47, 11 December 2024)
- ML20154M394 + (04:55:47, 11 December 2024)
- ML20154M391 + (04:55:48, 11 December 2024)
- ML20154M390 + (04:55:49, 11 December 2024)
- ML20154M389 + (04:55:49, 11 December 2024)
- ML20154M388 + (04:55:50, 11 December 2024)
- ML20154M387 + (04:55:50, 11 December 2024)
- ML20154M385 + (04:55:51, 11 December 2024)
- ML20154M386 + (04:55:51, 11 December 2024)
- ML20154M384 + (04:55:52, 11 December 2024)
- ML20154M383 + (04:55:52, 11 December 2024)
- ML20154M381 + (04:55:53, 11 December 2024)
- ML20154M380 + (04:55:54, 11 December 2024)
- IR 05000354/1988022 + (04:55:57, 11 December 2024)
- ML20154M377 + (04:55:58, 11 December 2024)
- ML20154M373 + (04:55:59, 11 December 2024)
- ML20154M374 + (04:55:59, 11 December 2024)
- ML20154M369 + (04:56:35, 11 December 2024)
- ML20154M368 + (04:56:35, 11 December 2024)
- ML20154M367 + (04:56:36, 11 December 2024)
- ML20154M366 + (04:56:36, 11 December 2024)
- ML20154M365 + (04:56:37, 11 December 2024)
- ML20154M357 + (04:56:41, 11 December 2024)
- ML20154M356 + (04:56:42, 11 December 2024)
- ML20154M353 + (04:56:43, 11 December 2024)
- 05000327/LER-1988-031-01, :on 880908,hourly Fire Watch Through 669 Ft Elevation of Auxiliary Bldg Suspended Due to Unexpected Increase in Airborne Radioactivity.Personnel Evacuated Until Airborne Levels Decreased + (04:56:44, 11 December 2024)
- ML20154M351 + (04:56:45, 11 December 2024)
- 05000267/LER-1986-012, :on 860206,during Shutdown,Incorrect Interlock Sequence Switch Position Actuated Rod Withdrawal Prohibit Sys Alarm.Caused by Dirty Switch Contacts.Pushbutton Switches on Linear Power Channels Replaced + (04:56:47, 11 December 2024)
- ML20154M349 + (04:56:48, 11 December 2024)
- ML20154M347 + (04:56:48, 11 December 2024)
- 05000324/LER-1986-005-02, :on 860209,during Local Leak Rate Testing, Discovered Nonquantifiable Leakage Rate for Primary Containment Isolation Valve 2-RXS-PV-1222C.Caused by Leakage Past Valve Seat.Valves Being Replaced + (04:56:53, 11 December 2024)
- ML20154M345 + (04:56:54, 11 December 2024)
- ML20154M344 + (04:56:54, 11 December 2024)
- ML20154M343 + (04:56:55, 11 December 2024)
- ML20154M342 + (04:56:56, 11 December 2024)
- 05000335/LER-1986-002-03, :on 860206,during Monthly Reactor Protection Sys Logic Matrix Test,Reactor Tripped.Caused by Failure of Logic Matrix Relay Trip Select Switch.Switch Replaced.Logic Matrix Test Successfully Completed + (04:56:57, 11 December 2024)
- ML20154M340 + (04:56:58, 11 December 2024)