Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154M513 + (04:54:45, 11 December 2024)
- ML20154M511 + (04:54:46, 11 December 2024)
- ML20154M509 + (04:54:46, 11 December 2024)
- ML20154M507 + (04:54:48, 11 December 2024)
- IR 05000344/1986002 + (04:54:52, 11 December 2024)
- ML20154M505 + (04:54:52, 11 December 2024)
- ML20154M502 + (04:54:53, 11 December 2024)
- ML20154M501 + (04:54:54, 11 December 2024)
- ML20154M497 + (04:54:54, 11 December 2024)
- ML20154M493 + (04:54:55, 11 December 2024)
- ML20154M490 + (04:54:56, 11 December 2024)
- ML20154M488 + (04:54:57, 11 December 2024)
- ML20154M486 + (04:54:57, 11 December 2024)
- ML20154M482 + (04:54:58, 11 December 2024)
- ML20154M484 + (04:54:58, 11 December 2024)
- 05000251/LER-1986-005-01, :on 860206,Phase a Containment Isolation Activated.Caused by Inadvertent Physical Disturbance of Safeguards Relay by Const Personnel.Containment Isolation Reset + (04:55:00, 11 December 2024)
- SNRC-1503, Responds to NRC Bulletin 88-008 & Suppls 1 & 2, Thermal Stresses in Piping Connected to Rcs. Based on Review & Analysis,Util Determined That Plant Does Not Contain Any Unisolable Sections of Piping.Concerns Inapplicable + (04:55:01, 11 December 2024)
- ML20154M472 + (04:55:02, 11 December 2024)
- ML20154M473 + (04:55:02, 11 December 2024)
- ML20154M470 + (04:55:03, 11 December 2024)
- ML20154M469 + (04:55:03, 11 December 2024)
- ML20154M468 + (04:55:04, 11 December 2024)
- ML20154M464 + (04:55:05, 11 December 2024)
- ML20154M466 + (04:55:05, 11 December 2024)
- 05000338/LER-1986-004-01, :on 860222,main Steam Line Radiation Monitor a Experienced Failure.Caused by Low Voltage Power Supply. Monitor Low Voltage Power Supply Will Be Replaced When Parts Available + (04:55:07, 11 December 2024)
- ML20154M461 + (04:55:08, 11 December 2024)
- BECO-88-139, Responds to Insp Rept 50-293/88-25 Re Unplanned ESF Actuations.Corrective Actions:Checklists Established to Review Technical Adequacy of Tech Spec Changes to Logic Sys Functional Tests & Electrical Surveillance Procedures + (04:55:09, 11 December 2024)
- ML20154M457 + (04:55:09, 11 December 2024)
- ML20154M455 + (04:55:10, 11 December 2024)
- NRC-88-0126, Ro:On 880425,emergency Diesel Generator Start Failure Occurred.Caused by Intermittent Failure of K1 Contact or reset.K1 Contactor Assembly,Including Attached Auxiliary Contacts Replaced + (04:55:10, 11 December 2024)
- ML20154M453 + (04:55:11, 11 December 2024)
- ML20154M450 + (04:55:12, 11 December 2024)
- ML20154M449 + (04:55:13, 11 December 2024)
- ML20154M447 + (04:55:14, 11 December 2024)
- ML20154M444 + (04:55:17, 11 December 2024)
- ML20154M443 + (04:55:20, 11 December 2024)
- ML20154M439 + (04:55:20, 11 December 2024)
- ML20154M436 + (04:55:22, 11 December 2024)
- ML20154M429 + (04:55:23, 11 December 2024)
- ML20154M431 + (04:55:23, 11 December 2024)
- ML20154M428 + (04:55:24, 11 December 2024)
- ML20154M427 + (04:55:24, 11 December 2024)
- IR 05000277/1988011 + (04:55:25, 11 December 2024)
- ML20154M423 + (04:55:26, 11 December 2024)
- ML20154M421 + (04:55:27, 11 December 2024)
- ML20154M419 + (04:55:28, 11 December 2024)
- VPN-061-98, Requests That Further Review of License Change Application LCA-238 Be Suspended as Result of Progress Made in Decommissioning,Installation of Natural Gas Pipe Line + (04:55:29, 11 December 2024)
- ML20154M416 + (04:55:29, 11 December 2024)
- ML20154M414 + (04:55:32, 11 December 2024)
- ML20154M411 + (04:55:33, 11 December 2024)
- ML20154M413 + (04:55:33, 11 December 2024)
- 05000327/LER-1988-014-01, :on 880314,noncompliance W/Configuration Control Requirements Following post-mod Test of Radiation Monitor Resulted in Containment Ventilation Isolation.Caused by Personnel Error.Personnel Counseled + (04:55:35, 11 December 2024)