ML20154M497

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-344/86-02 on 860104-0210.No Violations Noted.Concern Expressed Re Documentation of Maint Activities & Replacement of RCS Pressure Boundary Component
ML20154M497
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/28/1986
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20154M500 List:
References
NUDOCS 8603140304
Download: ML20154M497 (1)


See also: IR 05000344/1986002

Text

y

'

.e.

  • .

-:

.

Docket No. 50-344 gg

Portland General Electric Company

121'S. W. Salmon Street

Portland, Oregon 97204'

Attention: JMr.Ba'rtD.'hithers

Vice President Nuclear

Gentlemen: .

Subject:, .NRC Inspection of the Trojan Nuclear Plant

This'referstothefin)pectionconductedbyMr.S.A.RichardsandMr.G.C.

Kellund,of this office on' January 4 - February 10, 1986 of activities

authorized by NRC, License'No. NPF-1,Jand to the discussion of our findings

held by Mrs Richards. and Mr. Kellund with Mr. Orser and other members of your

staff, periodically during the inspectioni

Areas examined dur'ing this inspection are described in the enclosed inspection

report. Within these areas,:the; inspection consisted of selective

examinatio'a s .ofiprocedures 'and representative . records, . interviews with

personnel, and observations by the inspectors.

No, violations.of NRC requirements were identified within the scope of this

'

inspection. However, several observations during this inspection have served

~ to reinforce a concern expressed in our recent SALP report concerning

documentation of maintenance activities. Additionally, we would like-to. draw

your attention to observations made by the inspectors concerning replacement

of a reactor coolant. system pressure boundary component discussed in paragraph

6 of this report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

s

Sincerely,

iW hY I.

A. E. C iffee, Chief

Reactor Projects Branch

Enclosures: g

Inspection Report No. 50-344/86-02

cc w/ enclosure: State of Oregon (Dixon); W. S. Orser; J. W. Durham, Esq., PGE

bec w/ enclosure: Resident Inspector; Project Inspector; RSB/ Document Control

Desk (RIDS); J. Martin; B. Faulkenberry; Greg Cook

'

R O/ dot d4'6

Richards Ke d Chaffee

2/)7/86 2/17/86 2M//86 2/27/86 g

31joM f'3000 4