Letter Sequence Meeting |
|---|
|
|
MONTHYEARML20137B2701986-01-0606 January 1986 Submits Results of Visual Insp of Core Spray Spargers, Associated Piping & Installed Clamping Device,Per IE Bulletin 80-13 & NRC .Approval for Continued Facility Operation Requested Project stage: Other ML20154D5211986-02-28028 February 1986 Discusses Discovery of Addl Shop Weld in Recirculation Sys Loop a During Inservice Insp & IGSCC Mitigation Activities. Util Statements Re Performance of Stainless Steel Piping Weld Exams Conducted During 1984 Outage Require Correction Project stage: Other ML20154J1591986-02-28028 February 1986 Provides Addl Info Re Results of Recent Core Spray Sparger Exam Reported Per IE Bulletin 80-13 in .Extent of Insp Performed on Crack Discovered During Last Refueling Outage & Air Bubble Testing Discussed Project stage: Other ML20154L6451986-03-0606 March 1986 Rev 0 to Evaluation of IGSCC Flaw Indications & Weld Overlay Designs for Ei Hatch Unit 1 - Fall 1985. Maint/Refueling Outage Project stage: Other ML20154M4821986-03-10010 March 1986 Notification of 860318 Meeting W/Util,Southern Svcs & Structural Integrity Assoc in Bethesda,Md to Discuss Results of Insp of Piping & Resolution of IGSCC Indications Project stage: Meeting ML20205M9461986-04-24024 April 1986 Safety Evaluation Supporting Plant Operation in Present Configuration for 18-month Fuel Cycle.Plans for Insp &/Or Mod of Svc Sensitive Austenitic Stainless Steel Piping Sys Requested 3 Months Before Start of Next Refueling Outage Project stage: Approval ML20205M9381986-04-24024 April 1986 Forwards Safety Evaluation Based on Util 860106,0228 & 0310 Submittals Re Insp & Repairs of Recirculation,Rhr,Rwcu Sys Piping,Recirculation safe-ends & Core Spray Spargers During 1985 Outage.Unit Can Be Run for 18-month Fuel Cycle Project stage: Approval ML20211K6381986-06-23023 June 1986 Forwards Comments in Response to NRC 860424 SER Re Repair & Insp of Reactor Coolant Piping Sys & Core Spray Spargers Conducted During Fall 1985 Maint/Refueling Outage Project stage: Other ML20209D4221986-09-0505 September 1986 Forwards Response to Util 860623 Comments on NRC Safety Evaluation Re Insp & Repair of Reactor Coolant Piping Sys & Core Spray Spargers During 1985 Outage.Addl Info Requested Re Qualifications of Southern Co Svcs UT Subcontractors Project stage: Approval ML20213F0191986-11-0606 November 1986 Forwards Response to NRC 860905 Request for Addl Info Re Qualifications of Subcontractors Performing Ultrasonic Exams of Stainless Steel Piping & Components During Winter 1985-86 Maint/Refueling Outage Project stage: Request ML20209A8931987-01-23023 January 1987 Advises of Visual Insp of Core Spray Spargers (CSS) & Associated Piping During Recently Completed Maint & Refueling Outage Per IE Bulletin 80-13.No Cracking of CSS or Piping Between Inlet Nozzle & Vessel Shroud Observed Project stage: Other 1986-03-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.w x
MAR 10 M Docket No.:
50-321 MEMORANDUM FOR: Daniel Muller, Director BWR Project Directorate !2 Division of BWR Licensing FROM:
George Rivenbark, Project Manager BWR Project Directorate !2 Division of BWR Licensing
SUBJECT:
FORTHCOMING 11EETING WITH GEORGIA POWER COMPANY Time & Date:
Tuesday, March 18, 1985 9:00am-1:00pm Location:
Phillips Building, Room P-110 Bethesda, Maryland
Purpose:
Discuss Results of Inspection of Hatch Unit #1 Piping and Resolution of IGSCC Indications Requested
Participants:
NRC-G. Rivenbark, W. Koo, B.D. Liaw, W. Hazelton, J. Blake (RII)
Licensee-L. Gucwa, J. Heidt, J. Edwards, et al.
Other-Southern Services Staff Structural Int. Associates Staff trigiant signedby]
George Rivenbark, Project Manager BWR Project Directorate #2 Division of BWR Licensing cc: See next page DISTRIBUTION:
UbR Local PDR ORAS HDenton AD/BWR Glainas GRivenbark OELD EJordan BGrimes Receptionist NRC Participants ACRS(10)
Plant Memo File N01 son 0FFICIAL RECORD C0P d DBL PD#2 DBL U2 DBL:PD# -
SN s: c GR enbark Dypfd 3/7 /86 3/
/86 3ffg/86 8603140299 e60310 PDR ADOCK 0S000321 G
PDR
y.
Mr. J. T. Beckham, Jr.
Edwin I. Hatch Nuclear Planti, Georgia Power Company Units Nos. 1 and 2 cc:
G. F. Tr6wbridge, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
P. O. Box 2625 Birmingham, Alabama 35202 Resioent Inspector U. S. Nuclear Regulatory Commission Route 1. P. O. Dox 279 Baxley, Georgia 31513 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 353 a ta, Ge r a Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street S.W.
Atlanta, Georgia 30334 Chaiman Appling County Commissioners County Courthouse Baxley, Georgia 31513 L