Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195H843 + (23:13:58, 10 December 2024)
- IR 05000382/1998013 + (23:14:00, 10 December 2024)
- ML20195H841 + (23:14:01, 10 December 2024)
- ML20195H838 + (23:14:02, 10 December 2024)
- ML20195H840 + (23:14:02, 10 December 2024)
- ML20195H835 + (23:14:03, 10 December 2024)
- ML20195H834 + (23:14:04, 10 December 2024)
- ML20195H829 + (23:14:05, 10 December 2024)
- ML20195H826 + (23:14:05, 10 December 2024)
- ML20195H824 + (23:14:06, 10 December 2024)
- ML20195H822 + (23:14:07, 10 December 2024)
- PNO-II-99-022A, on 990615,update to Stolen Nuclear Gauge Made.Gauge Was Found on Side of Road in Aguada,Puerto Rico & Turned Over to Police,Who Then Returned Gauge to Licensee. Commonwealth of Puerto Rico Has Been Notified + (23:14:07, 10 December 2024)
- ML20195H820 + (23:14:08, 10 December 2024)
- ML20195H821 + (23:14:08, 10 December 2024)
- ML20195H819 + (23:14:09, 10 December 2024)
- PNO-III-88-056, on 880615,licensee Unable to Locate 27 Sealed Sources,Each Containing Between .075 & 3.0 Ci Tritium in Gaseous Form.Licensee Sent Notices to All Bases Reiterating Instruction Not to Remove Sources from Devices + (23:14:09, 10 December 2024)
- ML20195H816 + (23:14:10, 10 December 2024)
- U-603107, Provides Correction to Licensee 980805 Response to Violations Noted in Insp Rept 50-461/98-09.Further Evaluation Has Determined That Rev to EC-01,Form 33,is Not Most Effective Method for Activation of ERDS + (23:14:10, 10 December 2024)
- ML20195H815 + (23:14:11, 10 December 2024)
- ML20195H810 + (23:14:12, 10 December 2024)
- ML20195H813 + (23:14:12, 10 December 2024)
- ML20195H809 + (23:14:13, 10 December 2024)
- IR 05000285/1998024 + (23:14:17, 10 December 2024)
- ML20195H806 + (23:14:17, 10 December 2024)
- ML20195H805 + (23:14:18, 10 December 2024)
- ML20195H804 + (23:14:18, 10 December 2024)
- ML20195H802 + (23:14:19, 10 December 2024)
- ML20195H803 + (23:14:19, 10 December 2024)
- ML20195H800 + (23:14:20, 10 December 2024)
- ML20195H799 + (23:14:21, 10 December 2024)
- IR 05000341/1987041 + (23:14:23, 10 December 2024)
- ML20195H796 + (23:14:24, 10 December 2024)
- ML20195H795 + (23:14:25, 10 December 2024)
- ML20195H794 + (23:14:25, 10 December 2024)
- 05000285/LER-1988-014, :on 880518,emergency Diesel Generator D-2 Tripped Resulting in auto-start of Emergency Diesel Generator D-1.Caused by Failure of Fuse.Fuse Replaced + (23:14:27, 10 December 2024)
- ML20195H790 + (23:14:28, 10 December 2024)
- ML20195H789 + (23:14:30, 10 December 2024)
- ML20195H788 + (23:14:31, 10 December 2024)
- ML20195H785 + (23:14:32, 10 December 2024)
- ML20195H787 + (23:14:32, 10 December 2024)
- ML20195H784 + (23:14:33, 10 December 2024)
- ML20195H783 + (23:14:33, 10 December 2024)
- ML20195H780 + (23:14:34, 10 December 2024)
- ML20195H781 + (23:14:34, 10 December 2024)
- 05000245/LER-1988-005-02, :on 880527,containment Spray Interlock Setpoint Insufficient to Ensure ECCS Pump Cavitation Would Not Occur.Emergency Operating Procedures Revised to Ensure Sufficient Pressure Maintained + (23:14:36, 10 December 2024)
- ML20195H777 + (23:14:37, 10 December 2024)
- ML20195H774 + (23:14:38, 10 December 2024)
- ML20195H776 + (23:14:38, 10 December 2024)
- B12849, Advises That Volumetric Exam of Feedwater nozzle-to-pipe Welds,Feedwater Piping Welds to First Support & Feedwater line-to-containment Penetration Welds Performed as Required by IE Bulletin 79-13.Insp Summary Rept Expected by 880506 + (23:14:39, 10 December 2024)
- ML20195H771 + (23:14:39, 10 December 2024)
- ML20195H770 + (23:14:40, 10 December 2024)
- IR 05000133/1998004 + (23:14:43, 10 December 2024)