Browse wiki

Jump to navigation Jump to search
ML20195H788  +
TXX-88071 +, TXX-88065 +, TXX-88064 +, TXX-88068 +, TXX-6676, Forwards Rev 0 to QA Dept Procedure Nqa 3.07-1.01, Technical Audit Program & Rev 3 to Engineering Assurance Program Engineering Functional Evaluation,Comanche Peak Steam Electric Station +, TXX-6710, Interim Deficiency Rept CP-87-51 Re 480 Volt Containment Electrical Penetration Backup Protection.Initially Reported on 870729.Caused by Design Company Failure to Properly Translate Reg Guide 1.63 Requirements Into Drawings & Specs +, TXX-6669, Final Deficiency Rept CP-87-20 Re Cracked Porcelain Connectors on 6.9 Kv Transformers.Initially Reported on 870617.Nonconformance Rept 86-0142 Documents Problem & Subsequent Correspondence W/Transformer Vendor,Westinghouse +, TXX-6631, Forwards Description of Comanche Peak Response Team & Corrective Action Program & Util Position Re How Programs Interrelate.Illustration Also Encl +, TXX-7041, Interim Deficiency Rept CP-87-21 Re Effect of Thermolag on Cable Derating Factors.Initially Reported on 870617. Identified Cables Exceeding Prescribed Ampacity Rating Will Be Reworked.Next Rept Expected by 880406 +, TXX-7124, Interim Deficiency Rept CP-87-85 Re Degradation of Class 1E Circuits.Initially Reported on 870903.Approved Isolation Devices or Appropriate Analysis Will Be Provided.Next Rept Will Be Submitted by 880217 +, TXX-6500, Forwards Response to Request for Addl Info & Clarification Re Program Plan Update,Including Scope,Purpose & Objectives of Design Adequacy Program,Quality of Const & Qa/Qc Adequacy Program +, TXX-6480, Interim Deficiency Rept CP-86-83 Re Use of Separation Barrier Matl on Power Cables & Power Raceways.Initially Reported on 861208.Nonconformance Rept CE-87-4577 Dispositioned.Next Rept Will Be Submitted by 870828 +, TXX-88097 +, TXX-6334, Final Deficiency Rept CP-87-03 Re Installation of safety- Related 6.9 Kv Switchgear on Structural Embedments.Initially Reported on 870213.Switchgear Will Be Removed & Reinstalled After Concrete Floor & Structural Embedments Reworked +, TXX-88060 +, TXX-88069 +, TXX-88058 +, TXX-88049 +, TXX-88061 +, TXX-88062 +, TXX 88063 +, TXX-88070 +, TXX-88067 +  and TXX-88021 +
05000445  +
Luminant +  and Ackley R +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
January 15, 1988  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:14:31, 10 December 2024  +
118  +
Processing error"Processing error" is a predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> and represents errors that appeared in connection with improper value annotations or input processing.
Request  +
January 15, 1988  +
TXX-88071 +, TXX-88065 +, TXX-88064 +, TXX-88068 +, TXX-6676, Forwards Rev 0 to QA Dept Procedure Nqa 3.07-1.01, Technical Audit Program & Rev 3 to Engineering Assurance Program Engineering Functional Evaluation,Comanche Peak Steam Electric Station +, TXX-6710, Interim Deficiency Rept CP-87-51 Re 480 Volt Containment Electrical Penetration Backup Protection.Initially Reported on 870729.Caused by Design Company Failure to Properly Translate Reg Guide 1.63 Requirements Into Drawings & Specs +, TXX-6669, Final Deficiency Rept CP-87-20 Re Cracked Porcelain Connectors on 6.9 Kv Transformers.Initially Reported on 870617.Nonconformance Rept 86-0142 Documents Problem & Subsequent Correspondence W/Transformer Vendor,Westinghouse +, TXX-6631, Forwards Description of Comanche Peak Response Team & Corrective Action Program & Util Position Re How Programs Interrelate.Illustration Also Encl +, TXX-7041, Interim Deficiency Rept CP-87-21 Re Effect of Thermolag on Cable Derating Factors.Initially Reported on 870617. Identified Cables Exceeding Prescribed Ampacity Rating Will Be Reworked.Next Rept Expected by 880406 +, TXX-7124, Interim Deficiency Rept CP-87-85 Re Degradation of Class 1E Circuits.Initially Reported on 870903.Approved Isolation Devices or Appropriate Analysis Will Be Provided.Next Rept Will Be Submitted by 880217 +, TXX-6500, Forwards Response to Request for Addl Info & Clarification Re Program Plan Update,Including Scope,Purpose & Objectives of Design Adequacy Program,Quality of Const & Qa/Qc Adequacy Program +, TXX-6480, Interim Deficiency Rept CP-86-83 Re Use of Separation Barrier Matl on Power Cables & Power Raceways.Initially Reported on 861208.Nonconformance Rept CE-87-4577 Dispositioned.Next Rept Will Be Submitted by 870828 +, TXX-88097 +, TXX-6334, Final Deficiency Rept CP-87-03 Re Installation of safety- Related 6.9 Kv Switchgear on Structural Embedments.Initially Reported on 870213.Switchgear Will Be Removed & Reinstalled After Concrete Floor & Structural Embedments Reworked +, TXX-88060 +, TXX-88069 +, TXX-88058 +, TXX-88049 +, TXX-88061 +, TXX-88062 +, TXX 88063 +, TXX-88070 +, TXX-88067 +  and TXX-88021 +
Rev 0 to Project Status Rept,Electrical,Comanche Peak Steam Electric Station Unit 1 & Common Corrective Action Program  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.