Letter Sequence Other |
|---|
|
|
MONTHYEARML20214G9061987-05-15015 May 1987 Responds to NRC Concerns Re NUREG-0737 Items on Long Term Auxiliary Feedwater Sys Evaluation,Noble Gas Effluent Monitors & Control Room Habitability Requirements,Requiring Tech Specs Project stage: Other ML20236F1251987-10-19019 October 1987 Advises That Detailed Plant Fire Recovery Plan in Process of Formulation,Per 871003 Turbine Bldg Fire.Meeting in 2 Wks to Present Plan & Discuss Restart Requested Project stage: Meeting ML20236G0171987-10-22022 October 1987 Requests Addl Info Re 871003 Fire in Turbine Bldg.Schedule for Full Response Should Be Provided at Proposed Meeting. Info Requested Includes Evaluations of Fire Protection Features,Control Room Ventilation Sys & Hydraulic Sys Project stage: Meeting ML20236D5111987-10-22022 October 1987 Notification of 871030 Meeting W/Util in Bethesda,Md to Discuss Recovery of Plant from Turbine Bldg Fire Project stage: Meeting ML20236U1801987-11-23023 November 1987 Forwards Formal Response to Second Request for Addl Info Re Recovery from Turbine Bldg Fire.All Equipment Required by Tech Specs for Startup Will Be Operable.Final Rept on Impact of 871002 Fire Will Be Submitted by 880115 Project stage: Request ML20236W8031987-12-0303 December 1987 Summarizes Status of Plant Recovery from 871002 Turbine Bldg Fire.Investigations,Restorations,Mods & Testing by Util Required Prior to Restart,Expected to Be Completed by 871205 Project stage: Other IR 05000267/19870301987-12-0808 December 1987 Insp Rept 50-267/87-30 on 871102-06.No Violations or Deviations Noted.Deficiencies Identified.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Notifications & Communications & Public Info Project stage: Request ML20237A3751987-12-0808 December 1987 Ack Receipt of Summarizing Restart Fire Recovery Activities.Plant Restart Acceptable,Based on Review of short-term Corrective actions.Post-startup Evaluations Should Be Submitted within 60 to 90 Days Following Restart Project stage: Approval ML20237D1841987-12-16016 December 1987 Responds to Wg Schmidt Concerns Re 871002 Fire at Plant & Suggested Method to Mitigate Similar Fires in Nuclear Power Plants.Commission Will Ensure That Appropriate Measures in Place to Minimize Potential for Similar Fire in Future Project stage: Approval ML20195H8731988-01-14014 January 1988 Final Rept on Fort St Vrain 871002-03 Fire Project stage: Other ML20195H8431988-01-14014 January 1988 Forwards Final Rept on Fort St Vrain 871002-03 Fire, Per Williams .Util Will Provide Evaluations of Items in Section 11.0 of Rept on or Before 880310,per NRC Project stage: Other 1987-12-16
[Table View] |
Text
h Public Service-
- % h P.O. Box 840
~
Denver, CO 80201- 0840 January 14, 1988 R.O. Wil UAMS, JR.
Fort St. Vrain VICE PRESIDENT Unit No. 1 NUCLEAR OPERATIONS P-88016 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
Final Fire Report
REFERENCES:
- 1) PSC Letter, Williams to Calvo, dated November 23, 1987 (P-87414)
- 2) NRC Letter, Callan to Williams, dated December 8, 1987 (G-87425)
Gentlemen:
Public Service Company of Colorado (PSC) hereby submits the Final Report on the Fort St. Vrain October 2-3, 1987 Fire (enclosed), es committed to in Reference 1.
Additionally, in accordance with Referenco 2, PSC will provide evaluations for each of the items delineated in Section 11.0 of the enclosed report on or before March 10, 1988.
8801200379 080114 PDR ADOCK 05000267 F
PDR f.a
f P-88016 January 14, 1988 i
If there are any. questions, please contact Mr. M. H. Holmes at (303) 480-6960.
Very truly yours, s
R. O. Williams, Jr.
Vice President, Nuclear Operations R0W/WMD/imb Enclosure cc:
Regional Administrator, Region IV ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain I'
t l
l c
-