Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With + (23:11:33, 10 December 2024)
- ML20195J016 + (23:11:35, 10 December 2024)
- IR 05000267/1987025 + (23:11:36, 10 December 2024)
- ML20195J011 + (23:11:37, 10 December 2024)
- ML20195J014 + (23:11:37, 10 December 2024)
- ML20195J009 + (23:11:46, 10 December 2024)
- ML20195J008 + (23:11:47, 10 December 2024)
- ML20195J006 + (23:11:48, 10 December 2024)
- IR 05000456/1988017 + (23:11:50, 10 December 2024)
- ML20195J001 + (23:11:50, 10 December 2024)
- ML20195H999 + (23:11:51, 10 December 2024)
- ML20195H998 + (23:11:52, 10 December 2024)
- ML20195H997 + (23:11:52, 10 December 2024)
- ML20195H996 + (23:11:56, 10 December 2024)
- ML20195H994 + (23:11:57, 10 December 2024)
- ML20195H992 + (23:11:57, 10 December 2024)
- ML20195H991 + (23:11:58, 10 December 2024)
- ML20195H990 + (23:11:59, 10 December 2024)
- 05000277/LER-1988-025, :on 881027,Group II Primary Containment Isolation Sys Actuation Resulted from Personnel Error Re Tripping of Breaker.Caused by Inadvertently Grounding B Phase of Three Phase Circuit Breaker + (23:12:00, 10 December 2024)
- LR-N980544, Monthly Operating Rept for Oct 1998 for Hcgs,Unit 1. with + (23:12:01, 10 December 2024)
- 05000328/LER-1988-024, :on 880523,reactor Trip Occurred from Low Flow Signal on Rcs.Caused by Procedural Noncompliance.Util Will Review Past Reactor Trips for Similar Occurrence of Common Interaction Between Equipment Causing Trip + (23:12:04, 10 December 2024)
- 05000302/LER-1988-024, :on 881028,reactor Tripped Following Main Steam & Main Feedwater Isolation Due to Excessive Steam Pressure Decrease.Caused by Increased Main Turbine Governor Valve (Gv) Control Setting.Gv Limit Setting Reduced + (23:12:06, 10 December 2024)
- ML20195H979 + (23:12:09, 10 December 2024)
- ML20195H980 + (23:12:09, 10 December 2024)
- ML20195H978 + (23:12:10, 10 December 2024)
- 05000277/LER-1988-026-01, :on 881029,primary Containment Isolation Resulted from Undervoltage Trip of Reactor Protection Sys Channel a Due to Sensitive Rheostat.Caused by Craftsman Inadvertently Bumping Voltage Control Rheostat + (23:12:12, 10 December 2024)
- ML20195H973 + (23:12:13, 10 December 2024)
- ML20195H972 + (23:12:16, 10 December 2024)
- ML20195H970 + (23:12:17, 10 December 2024)
- ML20195H967 + (23:12:18, 10 December 2024)
- ML20195H965 + (23:12:18, 10 December 2024)
- ML20195H964 + (23:12:19, 10 December 2024)
- ML20195H962 + (23:12:23, 10 December 2024)
- ML20195H959 + (23:12:24, 10 December 2024)
- ML20195H961 + (23:12:24, 10 December 2024)
- IR 05000267/1988015 + (23:12:36, 10 December 2024)
- ML20195H955 + (23:12:37, 10 December 2024)
- ML20195H952 + (23:12:38, 10 December 2024)
- ML20195H951 + (23:12:38, 10 December 2024)
- ML20195H950 + (23:12:39, 10 December 2024)
- ML20195H945 + (23:12:42, 10 December 2024)
- ML20195H943 + (23:12:43, 10 December 2024)
- ML20195H942 + (23:12:43, 10 December 2024)
- ML20195H940 + (23:12:45, 10 December 2024)
- ML20195H941 + (23:12:45, 10 December 2024)
- 05000382/LER-1987-028, :on 871211,reactor Trip Occurred Due to Inadvertent Shutting of Msiv.Caused by Solenoid Valve Stuck Open During Testing.Solenoid Valve Replaced & MSIV Tested Successfully Prior to Restarting of Plant + (23:12:50, 10 December 2024)
- ML20195H937 + (23:12:51, 10 December 2024)
- ML20195H936 + (23:12:51, 10 December 2024)
- A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With + (23:12:52, 10 December 2024)
- ML20195H934 + (23:12:52, 10 December 2024)
- ML20195H932 + (23:12:53, 10 December 2024)