Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-9823, Forwards Response to RAI Re Section 3.3 Instrumentation of Proposed TS Changes.Addl Changes to Converted Specification 3.3.5 to Address Actuation Logic & Logic Relays Will Be Provided in Subsequent Submittal + (22:21:31, 10 December 2024)
- ML20196B862 + (22:21:31, 10 December 2024)
- ML20196B859 + (22:21:32, 10 December 2024)
- ML20196B858 + (22:21:33, 10 December 2024)
- ML20196B857 + (22:21:33, 10 December 2024)
- ML20196B856 + (22:21:34, 10 December 2024)
- ML20196B855 + (22:21:34, 10 December 2024)
- ML20196B854 + (22:21:35, 10 December 2024)
- ML20196B853 + (22:21:35, 10 December 2024)
- IR 05000456/1987041 + (22:21:48, 10 December 2024)
- ML20196B851 + (22:21:50, 10 December 2024)
- ML20196B850 + (22:21:51, 10 December 2024)
- B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With + (22:21:52, 10 December 2024)
- ML20196B848 + (22:21:52, 10 December 2024)
- LIC-98-0157, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-08 on 980608-12.Corrective Actions:Mrsids Were Reviewed & Revised for Reactor Protection & Esfs on 981120 + (22:21:53, 10 December 2024)
- ML20196B844 + (22:21:54, 10 December 2024)
- ML20196B843 + (22:21:54, 10 December 2024)
- ML20196B842 + (22:21:55, 10 December 2024)
- ML20196B841 + (22:21:56, 10 December 2024)
- 05000259/LER-1988-044, :on 881101,unplanned ESF Actuations Occurred. Caused by Normal Supply Breaker Failing to Close Due to Operator Not Holding Breaker Control Switch Fully in Close Position.Breaker Closed & Operator Counseled + (22:21:58, 10 December 2024)
- PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee + (22:21:59, 10 December 2024)
- ML20196B837 + (22:21:59, 10 December 2024)
- ML20196B835 + (22:22:00, 10 December 2024)
- ML20196B834 + (22:22:01, 10 December 2024)
- ML20196B831 + (22:22:02, 10 December 2024)
- ML20196B833 + (22:22:02, 10 December 2024)
- ML20196B829 + (22:22:03, 10 December 2024)
- ML20196B830 + (22:22:03, 10 December 2024)
- ML20196B827 + (22:22:04, 10 December 2024)
- ML20196B828 + (22:22:04, 10 December 2024)
- ML20196B825 + (22:22:05, 10 December 2024)
- NPL-98-0926, Forwards Public & Central Files Versions of Revised EPIP, Including Rev 50 to EPIP Form Index. Central Files Version Withheld + (22:22:05, 10 December 2024)
- ML20196B823 + (22:22:06, 10 December 2024)
- ML20196B822 + (22:22:06, 10 December 2024)
- PNO-IV-98-058, on 981125,medical Misadministration Occurred. Event Involved Nucletron Afterloader with Ir-192 Source. Brachytherapy Dosimetrist Entered Wrong Starting Position, 1500 Mm Rather than Intended 1450 Mm.Nmss Has Been Informed + (22:22:08, 10 December 2024)
- ML20196B821 + (22:22:08, 10 December 2024)
- ML20196B817 + (22:22:09, 10 December 2024)
- ML20196B815 + (22:22:10, 10 December 2024)
- ML20196B813 + (22:22:11, 10 December 2024)
- ML20196B814 + (22:22:11, 10 December 2024)
- ML20196B811 + (22:22:12, 10 December 2024)
- ML20196B812 + (22:22:12, 10 December 2024)
- ML20196B809 + (22:22:13, 10 December 2024)
- ML20196B808 + (22:22:13, 10 December 2024)
- ML20196B807 + (22:22:14, 10 December 2024)
- NOC-AE-000335, Application for Amends to Licenses NPF-76 & NPF-80,to Relocate Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section,Per NUREG-1431 + (22:22:15, 10 December 2024)
- ML20196B805 + (22:22:15, 10 December 2024)
- ML20196B802 + (22:22:16, 10 December 2024)
- ML20196B800 + (22:22:17, 10 December 2024)
- ML20196B801 + (22:22:17, 10 December 2024)
- ML20196B798 + (22:22:19, 10 December 2024)
- ML20196B799 + (22:22:19, 10 December 2024)