FEB 0 81938
-
- -
Docket No. 50-456
I
Docket No. 50-457
..
Commonwealth Edison Company
.
ATTN:
Mr. Cordell Reed
-
[
Senior Vice President
Post Office Box 767
-
p
Chicago, IL 60690
I
I
Gentlemen:
g
This refers to the routine safety inspection conducted by A. Dunlop, Jr. ,
S. Stasek, R. Mendez, B. A. Azab, and P. R. Rescheske of this office, on
October 16, 1987 through January 12, 1988, of preoperational and startup
-
'
testing activities at the Braidwood Station, Units 1 and 2, authorized by
(
NRC Opera'ing Licenses No. NPF-72 and and No. NPF-75 and Construction Permit
f
No. CPPR-133 and to the discussion of our findings with Mr. D. E. O'Brien at
the conclusion of the inspection,
=
c
_
The enclosed copy of our inspection report identifies areas examined during
,
the inspection. Within these areas, the inspection consisted of a selective
_
examination of procedures and representative records, observations, and
i
interviews with personnel.
.
During this inspection, certain of your activities appeared to be in violation
b
of NRC requirements, as described in the enclosed Notice.
With respect to
Item 1, the inspection showed that action had been taken to correct the
-
identified violation and to prevent recurrence.
Our understanding of your
-
corrective actions are described in Paragraph 2.a of the enclosed inspection
-
report.
Consequently, no reply to the violation is required and we have no
-
further questions regarding this matter at this time.
Regarding the remaining
items, a written response is required.
,
_.
L
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
_
this letter, the enclosures, and your response to this letter will be placed
_
in the NRC Public Document Room.
T
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
.
required by the Paperwork Reduction Act of 1980, PL 96-511.
- _
-
M
"
$$[$o$ $
f
I I
c7
r
'
/
-
7
_
L
O 6 8 1988
Commonwealth Edison Company
2
,
i
We will gladly. discuss any questions you have concerning this inspection.-
Sincerely.
0 (0? ?.k. ..?Y.(0?;EIIY 0' YIRIOS
u
Geoffrey C. Wright, Chief
Operations Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-456/87041(DRS);
No. 50-457/87039(DRS)
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
D. Butterfield, Nuclear
Licensing Manager
M. Wallace, Manager of Projects
D. Shamblin, Project Manager
W. Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
,
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
+
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
'
Division
E. Chan, OGC
G. Berry, OGC
'J. Stevens, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
r
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
,
RI
R
RIII
R I
RIII
III
II
III
GV*
M.p,
OV/s
'
Al'),
Dunlop/ib Stasek
Mendez
Azab
Rescheske
111ps
nds
Wrig t