Forwards Safety Insp Repts 50-456/87-41 & 50-457/87-39 on 871016-880112 & Notice of Violation
ML20196B827
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/08/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20196B832 List:
References
NUDOCS 8802120159
Download: ML20196B827 (2)


See also: IR 05000456/1987041

Text

-_

._ .

-

_

-

FEB 0 81938

-

-
Docket No. 50-456

I Docket No. 50-457

..

Commonwealth Edison Company

.

-

ATTN: Mr. Cordell Reed

[ Senior Vice President

- Post Office Box 767

p Chicago, IL 60690

I I

g Gentlemen:

This refers to the routine safety inspection conducted by A. Dunlop, Jr. ,

S. Stasek, R. Mendez, B. A. Azab, and P. R. Rescheske of this office, on

-

October 16, 1987 through January 12, 1988, of preoperational and startup

'

testing activities at the Braidwood Station, Units 1 and 2, authorized by

( NRC Opera'ing Licenses No. NPF-72 and and No. NPF-75 and Construction Permit

No. CPPR-133 and to the discussion of our findings with Mr. D. E. O'Brien at

f

= the conclusion of the inspection,

c

_

The enclosed copy of our inspection report identifies areas examined during

,

_

the inspection. Within these areas, the inspection consisted of a selective

i examination of procedures and representative records, observations, and

interviews with personnel.

.

During this inspection, certain of your activities appeared to be in violation

b of NRC requirements, as described in the enclosed Notice. With respect to

Item 1, the inspection showed that action had been taken to correct the

-

identified violation and to prevent recurrence. Our understanding of your

-

corrective actions are described in Paragraph 2.a of the enclosed inspection

-

report. Consequently, no reply to the violation is required and we have no

-

further questions regarding this matter at this time. Regarding the remaining

,

items, a written response is required.

_.

L In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

_

this letter, the enclosures, and your response to this letter will be placed

_ in the NRC Public Document Room.

T The responses directed by this letter and the accompanying Notice are not

.

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

_

-

M

"

$$[$o$

$ f

r

-

I I c7

/

'

7

_

L

O 6 8 1988

,

Commonwealth Edison Company 2

i

We will gladly. discuss any questions you have concerning this inspection.-

Sincerely.

0 (0? ?.k. ..?Y.(0?;EIIY 0'

u YIRIOS

Geoffrey C. Wright, Chief

Operations Branch

Enclosures:

1. Notice of Violation

2. Inspection Reports

No. 50-456/87041(DRS);

No. 50-457/87039(DRS)

cc w/ enclosures:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor ,

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard +

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance '

Division

E. Chan, OGC

G. Berry, OGC

'J. Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB r

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP ,

RI R RIII R I RIII III II III

Al'),

'

GV* M.p, OV/s

Dunlop/ib Stasek Mendez Azab Rescheske 111ps nds Wrig t