Advises NRC of 880824 Meeting to Address Issue of Initial Ref Temp Points for WF-70 Weld Metal in Plant Reactor Vessels.W/Encl
ML20196B855
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/29/1988
From: Trzyna G
COMMONWEALTH EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8812070061
Download: ML20196B855 (2)


Text

_ _ _ _ _ . - _ - _ _ _ _ _ _

, ,~ s

, \ Commonwealth Edison

. ._ ( One First National Plaza. Chicago, Illinois

/ Address Reply to: Post Offee Box 767

.V Chicago. Ithnois 60690 0767 November 29, 1988 Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission l Mall Station P1-137 Washington, DC 20555 l

l l

Subject:

Zion Nuclear Power Station, Units 1 and 2 l

I License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 Mr-70 Wald_Materlal/PTSl eferengt Temps. Inturn References (a) October 6, 1988 letter from D.R. Muller to H.E. Bliss I

Gentlement The referenced let$.er requested that we advise the NRC of our efforts to address the issue of initial RT(pts) for the WF-70 weld metal in the Zion reactor vessels. At a meeting held on August 24, 1988 at the White Flint f acility, representatives f rom the B&W Owner's Group presented the methodology

~

that will be pursued to resolve the issue. The presentation was well received, however, the NRC could only comment on the intended approach to resolve the problem because the projected conclusions were based on partially available data. The attached Figure provides the Wr-70 evaluation program schedule as presented in the August meeting.

Commonwealth Edison is taking the necessary steps to ensure that the B&W Owner's Group will continue to aggressively pursue this matter.

If you have any further questions regarding this issue, please direct them to the Nuclear Licensing Department.

Very truly yours, M

G.E. Trzyna Nuclear Licensing Administrator Zion Station

/sc1:5385K cca J. Norris-NRR A. Panagos-PWRE _

' \

801207 h, h [

PDR P

i . J 8&WOG WF-70 Evaluation Proaram Schedule l 1988 1989 1990 SEP OCT NOV DEC J F M A N J J A S 0 N D iJ F M t Determhe PWkT Effeel en Charpy Pro;s j A. 0bta'n V(and Material  : .

l B. Test LC(and Material C. Test Archive Materiel l

l l

D. Evatate PWHT Elle:t r  :

ll l t

2.Confrm Weld Wte Sigifica..ca '

Ocm;are trjttalPro;erties of Stee Wire Different Fiux I- -

i l

i

3. Determ'ne PWHT Effect ca Charpy Frc;s .

l A.Frepus Sart;!et fer LC:ro StraWre  ;  ;

l Study (WF 701 Olhar) l.

l l B. Cem;are Weto Struire fer Differeat PWHT l  : j C. EyaNate Results

, l .

]

l l' 4.LD.Ellect of Heat Input On Charpy Props l j j  ;

A. Freduce Welds with Vary:ng Heat input ~l l: -

l D. Deterrn!ne Unittadialed Propert!es  !  !

l C. Evaluate Results l -

l l ,

l S. Itn;tove Predictions of F!uence Elf acts '

l: ,

l Update RTNOT vs o Cerre!at!cas l 1 l l

6. Provide Data for long Term l A. Encapsulate WF 70 in Lifex Capsules '

l l 'I B. Irrad! ate Ufex Capsules l l-~

i I

7. NRC interactica '

A. updates B. SLbrn'ltats (As necessary)

! !U V V ll 7 l l l l l I

.