Documents 880208 Telcon W/E Fitzpatrick & K Graesser, Confirming Operational Readiness Insp on 880216-19.Insp Will Evaluate Operations,Maint,Nuclear Engineering,Radiation Protection & Chemistry Activities
ML20196B835
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/09/1988
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8802120160
Download: ML20196B835 (2)


Text

_ ,

w FEB e e 1988 Docket No. 50-456

Docket No. 50-457 Comonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago', IL 60690 Gentlemen:

This letter documents the telephone conversation between R. D. Lanksbury of this office and E. Fitzpatrick and K. Graesser of your staff on February 8, 1988, confirming the Operational Readiness Inspection (0RI) to be conducted at the Braidwood Power Station. The ORI is scheduled to be conducted on February 16-19, 1988. The purpose of the ORI is to evaluate Braidwood, Unit 2, operations, maintenance, nuclear engineering, radiation protection, and chemistry activities in order to help determine whether or not the Comonwealth Edison Company should receive a recommendation from Region III to proceed beyond 5% reactor power.

If you have any Lanksbury, (312) questions 790-5579, regarding of my staff. this inspection plerse contact Roger I Sincerely, i

l 0:hjui .E.*pd Cy N. d. Mrissoligo; Hubert J. Miller, Director Division of Reactor Safety l- See Attached Distribution g2120160880209 '

G ADOCK 05000456l-PDR -

RIII 40 R h 8 RIII 91 III Wr da Lanksbury Ph ps )

I!

t Mill 1

l

& hf Chriss[otimos 1lg6b 6

4

.. m..

Commonwealth Edison Company 2 Distribution cc w/ enclosure:

T. J. Maiman, Vice President, PWR Operations D. Butterfield, Nuclear Licensing Manager M.'Wallace, Manager of Projects D. Shamblin, Project Manager-W. Vahle, Construction Superintendent E. E. Fitzpatrick, Station Manager P. L. Barnes, Regulatory Assurance Su DCD/DCB(RIDS)pervisor Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector,- RIII Byron D. W. Cassel, Jr. , Esq.

Richard Hubbard ,

J. W. McCaffrey, Chief, Public  ;

Utilities Division H. S. Taylor, Quality Assurance Division E. Chan, 0GC G. Berry, OGC Stephen P. Sands, NRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB The Honorable Ivan W. Smith, ASLB The Honorable Gary J. Edles, ASLAP The Honorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP i