Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B881 + (22:21:09, 10 December 2024)
- ML20196B879 + (22:21:10, 10 December 2024)
- ML20196B880 + (22:21:10, 10 December 2024)
- ML20196B878 + (22:21:11, 10 December 2024)
- ML20196B876 + (22:21:12, 10 December 2024)
- ML20196B877 + (22:21:12, 10 December 2024)
- ML20196B874 + (22:21:15, 10 December 2024)
- ML20196B873 + (22:21:16, 10 December 2024)
- IR 05000312/1988035 + (22:21:27, 10 December 2024)
- ML20196B871 + (22:21:28, 10 December 2024)
- ML20196B867 + (22:21:29, 10 December 2024)
- ML20196B868 + (22:21:29, 10 December 2024)
- ML20196B864 + (22:21:30, 10 December 2024)
- PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery + (22:21:30, 10 December 2024)
- TXX-9823, Forwards Response to RAI Re Section 3.3 Instrumentation of Proposed TS Changes.Addl Changes to Converted Specification 3.3.5 to Address Actuation Logic & Logic Relays Will Be Provided in Subsequent Submittal + (22:21:31, 10 December 2024)
- ML20196B862 + (22:21:31, 10 December 2024)
- ML20196B859 + (22:21:32, 10 December 2024)
- ML20196B858 + (22:21:33, 10 December 2024)
- ML20196B857 + (22:21:33, 10 December 2024)
- ML20196B856 + (22:21:34, 10 December 2024)
- ML20196B855 + (22:21:34, 10 December 2024)
- ML20196B854 + (22:21:35, 10 December 2024)
- ML20196B853 + (22:21:35, 10 December 2024)
- IR 05000456/1987041 + (22:21:48, 10 December 2024)
- ML20196B851 + (22:21:50, 10 December 2024)
- ML20196B850 + (22:21:51, 10 December 2024)
- B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With + (22:21:52, 10 December 2024)
- ML20196B848 + (22:21:52, 10 December 2024)
- LIC-98-0157, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-08 on 980608-12.Corrective Actions:Mrsids Were Reviewed & Revised for Reactor Protection & Esfs on 981120 + (22:21:53, 10 December 2024)
- ML20196B844 + (22:21:54, 10 December 2024)
- ML20196B843 + (22:21:54, 10 December 2024)
- ML20196B842 + (22:21:55, 10 December 2024)
- ML20196B841 + (22:21:56, 10 December 2024)
- 05000259/LER-1988-044, :on 881101,unplanned ESF Actuations Occurred. Caused by Normal Supply Breaker Failing to Close Due to Operator Not Holding Breaker Control Switch Fully in Close Position.Breaker Closed & Operator Counseled + (22:21:58, 10 December 2024)
- PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee + (22:21:59, 10 December 2024)
- ML20196B837 + (22:21:59, 10 December 2024)
- ML20196B835 + (22:22:00, 10 December 2024)
- ML20196B834 + (22:22:01, 10 December 2024)
- ML20196B831 + (22:22:02, 10 December 2024)
- ML20196B833 + (22:22:02, 10 December 2024)
- ML20196B829 + (22:22:03, 10 December 2024)
- ML20196B830 + (22:22:03, 10 December 2024)
- ML20196B827 + (22:22:04, 10 December 2024)
- ML20196B828 + (22:22:04, 10 December 2024)
- ML20196B825 + (22:22:05, 10 December 2024)
- NPL-98-0926, Forwards Public & Central Files Versions of Revised EPIP, Including Rev 50 to EPIP Form Index. Central Files Version Withheld + (22:22:05, 10 December 2024)
- ML20196B823 + (22:22:06, 10 December 2024)
- ML20196B822 + (22:22:06, 10 December 2024)
- PNO-IV-98-058, on 981125,medical Misadministration Occurred. Event Involved Nucletron Afterloader with Ir-192 Source. Brachytherapy Dosimetrist Entered Wrong Starting Position, 1500 Mm Rather than Intended 1450 Mm.Nmss Has Been Informed + (22:22:08, 10 December 2024)
- ML20196B821 + (22:22:08, 10 December 2024)
- ML20196B817 + (22:22:09, 10 December 2024)
- ML20196B815 + (22:22:10, 10 December 2024)