Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196C342 + (22:14:59, 10 December 2024)
- ML20196C340 + (22:15:00, 10 December 2024)
- ML20196C337 + (22:15:01, 10 December 2024)
- ML20196C339 + (22:15:01, 10 December 2024)
- ML20196C335 + (22:15:02, 10 December 2024)
- ML20196C334 + (22:15:02, 10 December 2024)
- ML20196C331 + (22:15:03, 10 December 2024)
- ML20196C332 + (22:15:03, 10 December 2024)
- IR 05000155/1988012 + (22:15:05, 10 December 2024)
- ML20196C327 + (22:15:06, 10 December 2024)
- ML20196C328 + (22:15:06, 10 December 2024)
- ML20196C324 + (22:15:07, 10 December 2024)
- ML20196C325 + (22:15:07, 10 December 2024)
- BECO-88-100, Requests Change in Distribution List for NRC Correspondence + (22:15:08, 10 December 2024)
- ML20196C323 + (22:15:08, 10 December 2024)
- ML20196C321 + (22:15:09, 10 December 2024)
- ML20196C319 + (22:15:20, 10 December 2024)
- ML20196C314 + (22:15:24, 10 December 2024)
- ML20196C313 + (22:15:25, 10 December 2024)
- CEO-88-037, Advises That Util Currently Operating at Nominal 40% (Power) Plateau Per Procedure B.1A, Control of Plant Heatup & Operating Procedure for Power Escalation Testing + (22:15:26, 10 December 2024)
- ML20196C308 + (22:15:29, 10 December 2024)
- ML20196C309 + (22:15:29, 10 December 2024)
- ML20196C305 + (22:15:30, 10 December 2024)
- ML20196C306 + (22:15:30, 10 December 2024)
- ML20196C303 + (22:15:31, 10 December 2024)
- ML20196C301 + (22:15:35, 10 December 2024)
- ML20196C299 + (22:15:36, 10 December 2024)
- CEO-88-003, Responds to NRC Re Violations Noted in Insp Rept 50-312/88-12.Corrective Actions:Administrative Procedure AP 23.08 Will Be Revised to Include 10CFR50.72 Reporting Responsibility by 880909 + (22:15:37, 10 December 2024)
- ML20196C297 + (22:15:37, 10 December 2024)
- IR 05000445/1987039 + (22:16:10, 10 December 2024)
- ML20196C293 + (22:16:10, 10 December 2024)
- ML20196C292 + (22:16:11, 10 December 2024)
- 05000285/LER-1984-015, :on 840702,load Over RCS Suspended from Auxiliary Hook of Polar Crane Violated Tech Spec 2.11(1). Procedure Change Made to RCS Vent & Leak Test Operating Instructions + (22:16:13, 10 December 2024)
- ML20196C289 + (22:16:14, 10 December 2024)
- ML20196C287 + (22:16:14, 10 December 2024)
- ML20196C284 + (22:16:19, 10 December 2024)
- ML20196C283 + (22:16:19, 10 December 2024)
- 05000298/LER-1988-017, :on 880526,two Unplanned Actuations of ESFs Occurred While Performing Revised Surveillance Test to Verify Integrity of All Circuits.Caused by Personnel Error & Human Factors Deficiencies.Personnel Counseled + (22:16:21, 10 December 2024)
- ML20196C279 + (22:16:22, 10 December 2024)
- ML20196C280 + (22:16:22, 10 December 2024)
- 05000458/LER-1986-001, :on 860101,unit Scrammed from 19% Power on Low Reactor Water Level as Result of Isolations on Both Low Pressure Feedwater Heater Strings.Probably Caused by Flashing in Level Transmitter Pots + (22:16:24, 10 December 2024)
- 05000482/LER-1997-026-01, Forwards LER 97-026-01,to Reflect Change in Date of Commitment Re Procedure Rev Which Is Necessary Prior to Next Outage.Date Was Changed to Reflect Completion Prior to Commencement of Outage + (22:16:28, 10 December 2024)
- PNO-III-88-057, on 880623,three Workers Received Burns While Working on Radwaste Evaporator,Resulting in Skin Contamination (Less than 10,000 dpm/100 cm2).Onsite Radiation Specialist Reviewing Accident.News Media Informed + (22:16:28, 10 December 2024)
- ML20196C274 + (22:16:29, 10 December 2024)
- ML20196C272 + (22:16:30, 10 December 2024)
- ML20196C273 + (22:16:30, 10 December 2024)
- ML20196C271 + (22:16:31, 10 December 2024)
- ML20196C270 + (22:16:31, 10 December 2024)
- ML20196C269 + (22:16:32, 10 December 2024)
- ML20196C268 + (22:16:32, 10 December 2024)
- 05000285/LER-1988-032, :on 881101,safety Injection/Containment Spray Recirculation Piping Design Deficiency Noted.Caused by Design Deficiency in Recirculation Header.Miniflow Test of Safety Injection Pumps Performed + (22:16:34, 10 December 2024)