ML20196C323

From kanterella
Jump to navigation Jump to search
Esada-Vallecitos Experimental Superheat Reactor (Deactivated), Annual Rept 20 for 1987
ML20196C323
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 12/31/1987
From: Cunningham G, Titus G
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
20, NUDOCS 8802160061
Download: ML20196C323 (5)


Text

i

. i I

i l

l ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR l

(DEACTIVATED)

ANNUAL REPORT N0. 20 I

l l

LICENSE DR-10 DOCKET 50-183 i

l r

NUCLEAR OPERATIONS e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 ggaigggg[gj 3 \

J

..q,

,- 1 ESADA-Vallecitos Excerimental Suoerheat Reactor 1 (Deactivated) i

/ Annual Renort No. 20 ,

S l

I General Electric Company has maintained the ESADA Vallecitos Experimental

'SuperheatReactor(EVESh)inadeactivatedsta'tusundertheauthorityof

'I Amendment No. 3 to License DR 10, Docket 50183, issued June 11, 1976. In thin twentieth annual. report, a summary is presented as to the status of the ' facility for the period frok January 1,1987, to December 31, 1987, as required by Paragraph 3.E.2. c ' the license.  ;

I.

SUMMARY

The facility remains in essentially the same condition described in the 3 nineteenth annual report. Entry into the containment building was made for routine radiation surveys and a general check of conditions throughout the l building. Radiation levels remain essentially unchanged.

t II. # STATUS OF THE EACILITY Access to the containment building is controlled by the facility suporvisor according to written procedures. The reactor vessel and head storage shield plugs, the wooden cover over the fuel storage pool, and the locked covers for l

1 the personnel end equipment hatchways remain in place.

i a

III. RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that l the levels remain low. Survoy results are tabulated in Table 1. The (

radiation / contamination levels listed are representative but not necessarily j maximum values.

l l l j 1 j j

i l

EVESR Annual Rsport No. 20  ;

+

IV. ACTIVITIES -

l

! Routine inspections were conducted during this report period.  :

i  !

i I V. ORGANIZATION i l

There were no changes in the organization.-  !

VI. CONCLUSION a

i The General Electric Company concludes that the deactivated ESADA Vallecitos

  • I Experimental Superheat Reactor is being maintained in a safe shutdown j condition. The inspections, access control, and administratively controlled j

activities ensure acximum protection for the public health and safety. The 1 procedures will be continued to maintain this high level of protection.

J i j  !

I CENERAL ELECTRIC COMPANY r f Irradiati roce ing l\ / e By /

l /Gf W. titus, Manager ,

j Reactor Operations & Support Services t

a 1

.J 1

I i

l ,

2 i

.m gr )

' .; ,r ,4. x y

^-

~

  • 4 g t'

,-.w

} , EVESRIgnut1ReportNo. 20

. ~ , ,

x

,e s' ,,'A ,,

r, ', .

n, w i. . p g .- .

/

"eJ < TABLE 1. Radiation and Contamination Reoort

, i

, /

. / < ~ '- Reactgymigamu ' - 12/86 i " 06/87 12/87 d, 1. Radi$ tion Readings (mR/h gamma)

j.

-a. Top <f spent fuel pool,(main floor) 3.0 1.5 1.5

/ b. ' 549 py level (main floor) <1.0 <1.0 <1.0 1 c. 534-fr. level 1.0 1.0 1.0 f, ,; d. 519-ft level ,

<1.0 <1.0 <1.0

e. 503-ft leve1 4 maximum pipe reading) 3.5 2.2 2.5

/, e< 487 ft level,(basement) f.

<1.0 <1.0 <1.0

.1

2. Air Samples (pCi/cc air' beta-gamma) x 10 ~0*

, 7 <

a. 549-ft level 0.19 0.019 I. 0.021
b. 519 ft level 0.15 0.11 0.12
c. 487-ft level 0.047 0.073 0.069 f
3. Floor Smears (c/m beta-gamma)**

i 549-(t 7evel ,

400/ft2 400/ft2 400/ft2

.a# r W +

e

  • 24 hour decay.
    • For conversion to d/m, assume an instrument efficiency of 20%.

NOTE: Radiation levels, surface smears and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.

3 m

l 0

GENER AL $ ELECTRIC NUCLEAR ENERGY BUSINESS OPERATIONS GENERAL ELECTRJC COMPANY e VALLECTOS NUCLEAR CENTER e PLEASANTON, CAUFORNIA 945d4 I

February 1, 1988 l

l 4

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 i

Attention: Document Control Desk l

Reference:

License DR-10, Docket 50-183 Gentlemen: .;

Enclosed are three signed copies of Annual Report No. 20 )

for the ESADA-Vallecitos Experimental Superheat Reactor (deactivated).

1 Sincerely, 1 3

G. E. Cun ngham i Senior Licensing Engineer (415) 862-4330

/ca Enclosures Ao71

\ \

d