Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B12959, Forwards Revised Emergency Plan Implementing Procedures & Temprorary Procedure Changes (Tpcs),Including Rev 10 to EPIP 1.5-5, Site Area Emergency & Tpc 88-508 to Rev 33 to EPIP 1.5-2, Notification & Communication. W/O Encl + (20:38:03, 10 December 2024)
- ML20196L236 + (20:38:03, 10 December 2024)
- ML20196L233 + (20:38:04, 10 December 2024)
- ML20196L234 + (20:38:04, 10 December 2024)
- ML20196L231 + (20:38:05, 10 December 2024)
- ML20196L230 + (20:38:06, 10 December 2024)
- ML20196L229 + (20:38:06, 10 December 2024)
- ML20196L226 + (20:38:07, 10 December 2024)
- ML20196L228 + (20:38:07, 10 December 2024)
- ML20196L225 + (20:38:08, 10 December 2024)
- ML20196L224 + (20:38:08, 10 December 2024)
- ML20196L223 + (20:38:09, 10 December 2024)
- ML20196L221 + (20:38:10, 10 December 2024)
- ML20196L222 + (20:38:10, 10 December 2024)
- 05000454/LER-1999-001-05, :on 990422,depressing Both Feedwater Isolation Reset Pushbuttons Leads to LCO 3.0.3 Entry.Caused by Implementation Error in Procedure Review for Conversion to Its.Review of Procedures Will Be Conducted + (20:38:13, 10 December 2024)
- ML20196L219 + (20:38:17, 10 December 2024)
- HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel + (20:38:18, 10 December 2024)
- 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed + (20:38:19, 10 December 2024)
- ML20196L213 + (20:38:19, 10 December 2024)
- ML20196L211 + (20:38:20, 10 December 2024)
- 05000334/LER-1999-008, :on 990423,missed IST Program Surveillance Attribute,Was Identified.Caused by Inappropriate Exclusion of Testing Two Valves in Closed Direction within Original IST Program.Ist Program Revised.With + (20:38:22, 10 December 2024)
- ML20196L208 + (20:38:23, 10 December 2024)
- ML20196L207 + (20:38:24, 10 December 2024)
- ML20196L205 + (20:38:25, 10 December 2024)
- ML20196L206 + (20:38:25, 10 December 2024)
- ML20196L204 + (20:38:26, 10 December 2024)
- ML20196L203 + (20:38:27, 10 December 2024)
- ML20196L200 + (20:38:28, 10 December 2024)
- ML20196L199 + (20:38:28, 10 December 2024)
- 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs + (20:38:29, 10 December 2024)
- ML20196L194 + (20:38:30, 10 December 2024)
- IR 05000322/1988005 + (20:38:33, 10 December 2024)
- ML20196L190 + (20:38:34, 10 December 2024)
- ML20196L189 + (20:38:36, 10 December 2024)
- ML20196L187 + (20:38:37, 10 December 2024)
- ML20196L188 + (20:38:37, 10 December 2024)
- ML20196L185 + (20:38:38, 10 December 2024)
- ML20196L184 + (20:38:38, 10 December 2024)
- ML20196L180 + (20:38:39, 10 December 2024)
- ML20196L182 + (20:38:39, 10 December 2024)
- ML20196L179 + (20:38:40, 10 December 2024)
- BVY-99-071, Corp 1998 Annual Rept. with + (20:38:41, 10 December 2024)
- ML20196L176 + (20:38:42, 10 December 2024)
- SVP-99-105, Informs NRC of Rev to Schedule for Completing Setpoint/ Uncertainty Calculations & Procedure Changes,Originally Planned for Completion on 990529 + (20:38:42, 10 December 2024)
- ML20196L174 + (20:38:43, 10 December 2024)
- 05000446/LER-1999-003, :on 990421,discovered That CR HVAC Train a Was Outside TS AOT Limits Due to Blown Fuse.Caused by Incorrect Landing of Wires That Provide Relay Control Power for CR Ventilation Circuitry.Fuse Was Replaced.With + (20:38:46, 10 December 2024)
- ML20196L172 + (20:38:47, 10 December 2024)
- ML20196L171 + (20:38:48, 10 December 2024)
- 05000458/LER-1999-008, :on 990418,uplanned Automatic Closure of Div III DG Output Breaker Was Noted Due to Loss of Normal Power to Div III Switchgear During Testing.Caused by Personnel Error.Returned Electrical Lineup to Normal.With + (20:38:59, 10 December 2024)
- IR 05000029/1986099 + (20:39:41, 10 December 2024)
- ML20196L161 + (20:39:45, 10 December 2024)