ML20196L229
| ML20196L229 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/22/1988 |
| From: | Roux D AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-01488, 53FR16435-1488, NUDOCS 8807070306 | |
| Download: ML20196L229 (1) | |
Text
UJGnLI HUMy[g PROPOSED RULE ?_E W3 FK lly 3 S) ytMEi'
~hi..
s June 22, 1988
'88 JN 23 P8 '44 QFrit:.4 u0CXL iis ; -l t.( /q;";
Secretary of the himiot B R t, h &~
Attn: Docketing and Service Branch U.S. Nuc' lear Regulatory Wmion Washington, DC 20555 I understand that a vote will be taken soon reganiing the need to have a fully operational siren notification system in place prior to granting Seabrook Station a 5% license. As a concermd citizea of Few Harrehire, I am writing to urge the ocanission not to require a full system prior to approving Seabrook's 5% license.
'Ibe siren notification system is just not important enough in a 5% made to warrant further delay in licensing the plant.
'Ibe risk is miniscule that the system would be required under 100% power ard is nona'cistent at 5%.
Nothing but further needless delay will result if the Comnission supports the need for a fully orzational systen. 'Ihe plant's licensirs process needs acunentum as the power is needed today.
Voting that a fully operational systen is not a requirement is the only responsible act.
Sincerely, e
T e3 Dennis P. Roux 66 Canbridge Road Bedford, N3 03102 8807070306 880622 PDR PR SO 53FR16435 PDR S46
-.