Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198L908 + (15:07:53, 10 December 2024)
- ML20198L905 + (15:07:54, 10 December 2024)
- ML20198L903 + (15:07:55, 10 December 2024)
- ML20198L901 + (15:07:56, 10 December 2024)
- PNO-IV-98-002, on 980113,Troxler Moisture Density Gauge Model 3430,serial Number 26221,containing 8 Mci of Cs-137 & 40 Mci of Am-241/beryllium Stolen W/Company Vehicle.Co Dept of Public Health & Environ Issued Press Release + (15:07:56, 10 December 2024)
- ML20198L895 + (15:07:57, 10 December 2024)
- ML20198L892 + (15:07:58, 10 December 2024)
- ML20198L891 + (15:07:59, 10 December 2024)
- ML20198L890 + (15:07:59, 10 December 2024)
- ML20198L888 + (15:08:00, 10 December 2024)
- ML20198L887 + (15:08:00, 10 December 2024)
- ML20198L881 + (15:08:01, 10 December 2024)
- IR 015000038/1997003 + (15:08:02, 10 December 2024)
- ML20198L879 + (15:08:02, 10 December 2024)
- 05000259/LER-1986-008-01, :on 860212,two Events Experienced Re Failure of Air Solenoid Valves,Utilized in Diesel Air Start Sys,To Fully Close.Caused by Corrosion Products Entering Valves from Air Sys Piping.Air Sys Blown Down Daily + (15:08:04, 10 December 2024)
- ML20198L872 + (15:08:05, 10 December 2024)
- ML20198L870 + (15:08:06, 10 December 2024)
- ML20198L869 + (15:08:07, 10 December 2024)
- ML20198L867 + (15:08:07, 10 December 2024)
- IR 015000019/1997006 + (15:08:08, 10 December 2024)
- ML20198L863 + (15:08:09, 10 December 2024)
- ML20198L862 + (15:08:10, 10 December 2024)
- 05000373/LER-1986-017-02, :on 860503,reactor Scrammed on Low CRD Charging Water Header Pressure.Caused by Operator Reliance on Defective Low Level Alarm Annunciator.Annunciator Repaired & Operator Counseled + (15:08:12, 10 December 2024)
- ML20198L857 + (15:08:13, 10 December 2024)
- ML20198L855 + (15:08:17, 10 December 2024)
- ML20198L854 + (15:08:18, 10 December 2024)
- ML20198L852 + (15:08:19, 10 December 2024)
- ML20198L849 + (15:08:19, 10 December 2024)
- ML20198L848 + (15:08:20, 10 December 2024)
- IR 015000020/1997001 + (15:08:21, 10 December 2024)
- ML20198L845 + (15:08:21, 10 December 2024)
- ML20198L843 + (15:08:22, 10 December 2024)
- 05000382/LER-1995-002-01, Forwards LER 95-002-01 Providing Details of Design Change 3448 Installed During Refueling Outage 8 as Result of 950610 Reactor Trip,Partial Loss of Offsite Power & Fire.Revised Info Identified by Vertical Line in right-hand + (15:08:24, 10 December 2024)
- ML20198L841 + (15:08:25, 10 December 2024)
- ML20198L839 + (15:08:26, 10 December 2024)
- ML20198L834 + (15:08:27, 10 December 2024)
- ML20198L836 + (15:08:27, 10 December 2024)
- PNO-III-89-032, on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall + (15:08:28, 10 December 2024)
- ML20198L828 + (15:08:29, 10 December 2024)
- ML20198L829 + (15:08:29, 10 December 2024)
- ML20198L823 + (15:08:30, 10 December 2024)
- ML20198L821 + (15:08:31, 10 December 2024)
- IR 05000458/1998099 + (15:08:32, 10 December 2024)
- ML20198L817 + (15:08:33, 10 December 2024)
- ML20198L818 + (15:08:33, 10 December 2024)
- ML20198L816 + (15:08:34, 10 December 2024)
- ML20198L811 + (15:08:38, 10 December 2024)
- ML20198L813 + (15:08:38, 10 December 2024)
- 3F0198-26, Confirms 980108 Meeting Discussion Between FPC & NRC Re Complex Habitability Envelope Justification for Continued Operation Issues at Crystal River,Unit 3 + (15:08:39, 10 December 2024)
- ML20198L809 + (15:08:40, 10 December 2024)
- ML20198L808 + (15:08:40, 10 December 2024)