Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P895 + (14:30:08, 10 December 2024)
- ML20198P892 + (14:30:09, 10 December 2024)
- ML20198P893 + (14:30:09, 10 December 2024)
- ML20198P891 + (14:30:10, 10 December 2024)
- ML20198P889 + (14:30:10, 10 December 2024)
- ML20198P886 + (14:30:11, 10 December 2024)
- ML20198P887 + (14:30:11, 10 December 2024)
- ML20198P884 + (14:30:12, 10 December 2024)
- ML20198P882 + (14:30:13, 10 December 2024)
- NG-98-0016, Application for Amend to License DPR-49,revising LCO for PCIVs in TS Section 3.7.B to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys,Per NUREG-1433 + (14:30:13, 10 December 2024)
- ML20198P877 + (14:30:14, 10 December 2024)
- ML20198P879 + (14:30:14, 10 December 2024)
- ML20198P872 + (14:30:15, 10 December 2024)
- ML20198P870 + (14:30:16, 10 December 2024)
- ML20198P869 + (14:30:17, 10 December 2024)
- ML20198P868 + (14:30:18, 10 December 2024)
- ML20198P866 + (14:30:19, 10 December 2024)
- ML20198P867 + (14:30:19, 10 December 2024)
- ML20198P864 + (14:30:20, 10 December 2024)
- ML20198P859 + (14:30:21, 10 December 2024)
- ML20198P858 + (14:30:32, 10 December 2024)
- 05000370/LER-1997-002-03, :on 970711,reactor Tripped Due to RCP Motor Failure.Caused by Design/Manufacturing Deficiency Which Existed in Nc Pump Motor.Motor Stator 2D Was Replaced W/Rewound Spare + (14:30:35, 10 December 2024)
- ML20198P856 + (14:30:36, 10 December 2024)
- NRC-98-0013, Provides Committed Written Justification for Operating W/Replacement Pilot Assemblies for Duration of Operating Cycle + (14:30:37, 10 December 2024)
- ML20198P852 + (14:30:40, 10 December 2024)
- ML20198P850 + (14:30:41, 10 December 2024)
- ML20198P849 + (14:30:42, 10 December 2024)
- ML20198P847 + (14:30:42, 10 December 2024)
- ML20198P845 + (14:30:47, 10 December 2024)
- ML20198P843 + (14:30:48, 10 December 2024)
- ML20198P841 + (14:30:49, 10 December 2024)
- 05000259/LER-1986-015-01, :on 860424 & 29,during Installation of Permanent Switch Protective Covers on Reactor Protection Sys (RPS) MG Panel Switches,Rps Trip Occurred.Caused by Accidental Bump of Control Switch + (14:30:50, 10 December 2024)
- NSD-NRC-97-5412, Responds to RAI Re Comments on Sgs in Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (14:30:51, 10 December 2024)
- ML20198P836 + (14:30:52, 10 December 2024)
- ML20198P835 + (14:30:53, 10 December 2024)
- NSD-NRC-97-5414, Forwards Responses to RAIs Re Comments on AP600 Normal Rhrs from Reactor Sys Branch on Rev 3 of AP600 Certified Design Matl,Including ITAAC as Requested in + (14:30:53, 10 December 2024)
- ML20198P829 + (14:30:54, 10 December 2024)
- ML20198P830 + (14:30:54, 10 December 2024)
- ML20198P826 + (14:30:55, 10 December 2024)
- ML20198P827 + (14:30:55, 10 December 2024)
- RBG-44218, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-13 on 970720-0830.Corrective Actions:Control Panel Lineup Immediately Performed for Division 1 Dg,Shift Briefing Form Generated & Individuals Involved Counseled + (14:30:58, 10 December 2024)
- PY-CEI-NRR-2253, Submits Supplemental Response to NOV EA-96-253.Util Accepts DOL Administrative Review Board Ruling as Further Clarification on Issue of What Does & Does Not Constitute Protected Activity Under Section 211 of ERA + (14:30:58, 10 December 2024)
- ML20198P820 + (14:31:00, 10 December 2024)
- ML20198P818 + (14:31:02, 10 December 2024)
- ML20198P816 + (14:31:03, 10 December 2024)
- ML20198P812 + (14:31:04, 10 December 2024)
- ML20198P809 + (14:31:04, 10 December 2024)
- ML20198P808 + (14:31:05, 10 December 2024)
- ML20198P806 + (14:31:06, 10 December 2024)
- ML20198P807 + (14:31:06, 10 December 2024)
- ML20198P803 + (14:31:19, 10 December 2024)