Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248G857 + (22:48:42, 1 December 2024)
- ML20248G856 + (22:48:43, 1 December 2024)
- ML20248G852 + (22:48:47, 1 December 2024)
- ML20248G848 + (22:48:48, 1 December 2024)
- ML20248G850 + (22:48:48, 1 December 2024)
- ML20248G847 + (22:48:51, 1 December 2024)
- RBG-31591, Responds to Violations Noted in Insp Rept 50-458/89-31. Corrective Actions:Leads Lifted to Isolate Trip Circuit Until Leads Properly Terminated on Replacement Transformer. Supplemental Response Will Be Provided by 900531 + (22:48:52, 1 December 2024)
- ML20248G842 + (22:48:53, 1 December 2024)
- ML20248G839 + (22:48:55, 1 December 2024)
- ML20248G837 + (22:48:55, 1 December 2024)
- IR 05000423/1989019 + (22:48:57, 1 December 2024)
- ML20248G832 + (22:49:00, 1 December 2024)
- ML20248G824 + (22:49:10, 1 December 2024)
- ML20248G821 + (22:49:20, 1 December 2024)
- ML20248G818 + (22:49:21, 1 December 2024)
- ML20248G815 + (22:49:22, 1 December 2024)
- ML20248G814 + (22:49:23, 1 December 2024)
- ML20248G811 + (22:49:23, 1 December 2024)
- ML20248G810 + (22:49:24, 1 December 2024)
- IR 05000298/1989025 + (22:49:25, 1 December 2024)
- ML20248G806 + (22:49:26, 1 December 2024)
- ML20248G804 + (22:49:26, 1 December 2024)
- ML20248G801 + (22:49:27, 1 December 2024)
- ML20248G799 + (22:49:28, 1 December 2024)
- ML20248G794 + (22:49:29, 1 December 2024)
- ML20248G791 + (22:49:30, 1 December 2024)
- ML20248G788 + (22:49:31, 1 December 2024)
- ML20248G790 + (22:49:31, 1 December 2024)
- 05000267/LER-1989-019, :on 890906,steam Entered Instrument Air Header a During Startup of Outside Auxiliary Boiler.Caused by Failure of Check Valve Which Allowed Steam to Flow Into Svc Air Line.Air Header Blown Down & Dried Out + (22:49:33, 1 December 2024)
- ML20248G785 + (22:49:38, 1 December 2024)
- ML20248G783 + (22:49:38, 1 December 2024)
- ML20248G779 + (22:49:39, 1 December 2024)
- 05000333/LER-1988-014, :on 881205,insp of 4,160 Volt Ac Circuit Breakers Revealed Possible Common Cause Failure as Result of Procedural Deficiency by Vendor Performing Circuit Breaker Overhaul.Circuit Breaker Repaired + (22:49:43, 1 December 2024)
- ML20248G775 + (22:49:44, 1 December 2024)
- ML20248G773 + (22:49:45, 1 December 2024)
- ML20248G772 + (22:49:45, 1 December 2024)
- ML20248G767 + (22:49:46, 1 December 2024)
- ML20248G763 + (22:49:50, 1 December 2024)
- ML20248G765 + (22:49:50, 1 December 2024)
- ML20248G762 + (22:49:51, 1 December 2024)
- ML20248G758 + (22:49:52, 1 December 2024)
- ML20248G760 + (22:49:52, 1 December 2024)
- ML20248G750 + (22:49:54, 1 December 2024)
- ML20248G747 + (22:49:55, 1 December 2024)
- IR 05000333/1989019 + (22:49:56, 1 December 2024)
- IR 05000313/1989015 + (22:49:57, 1 December 2024)
- ML20248G735 + (22:49:58, 1 December 2024)
- 05000213/LER-1989-015, :on 890905,EG-2A Emergency Diesel Generator Room Devitalized,Rendering Fire Door Inoperable.Fire Watch Not Established.Caused by Personnel Defeating Door Latching Mechanism.Hourly Fire Watch Established + (22:50:02, 1 December 2024)
- ML20248G727 + (22:50:06, 1 December 2024)
- IR 05000213/1989014 + (22:50:07, 1 December 2024)
- ML20248G724 + (22:50:08, 1 December 2024)