- APR - 31989
-
lIn Reply Refer To:
l
Dockets:
50-313/89-15
50-368/89-15
Arkansas Power &-Light Company
' ATTN: Mr. Gene Campbell
Vice President, Nucletr
Operations
P.O.-Box 551
Little Rock, Arkansas. 72203
Gentlemen:
This refers to the inspection conducted by Mr. T. O. McKernon of this office
during the period March 20-24, 1989, of activities authorized by NRC Operating
License DPR-51 and NPF-6 for Arkansas Nuclear One facility, and to'the
discussion of our findings with Mr. S. Quinnoz and other members of your staff
'
at the conclusion of the inspection.
Areas examined during the inspection included modification testing and followup
<
to previous inspection findings. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector. The inspection findings
are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items'is. identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
L. J. Callan Director
Division of Reactor Projects
Enclosure:
(see next page)
RI :
S
C:T 3
D:DRP
TOMc ernon;1m
WCS die
J il oan
LJCallan
3 g/89
g/$/89
g/g/89
g/$/89
/
[60!
\\
\\
8904130548 890403
'PDR
ADOCK 05000313
i
O
_.
. _ .
-
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
__ __ _ _ __ __ _ _ _ D
, _ _
_
_ _ _ _ . _ _ _ _ -
-
.
__
- _
__
~ , .
.
,
.
,
,
.
Arkansas-Power & Light Company
-2 -
Enclosure:-
Appendix
NRC Inspection Report
50-313/89-15
50-368/89-15
.j
.
.,
cc w/ enclosure: .
'
Arkansas Nuclear One
,
ATTN:
J. M. Levine Executive
Director, Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801-
Arkansas Radiation Control Program Director
Scc to DM8 (IE01)
bec distrib.'by RIV:
- RRI
- R. D. Martin, RA'
- RPB-DRSS
- SectionChief(DRP/A)
Lisa Shea, RM/ALF
- RIV File
-*DRP
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
- DRS-
- T. O. McKernon
- C, Harbuck NRR Project Manager (MS:
13-D-18)
- C. Poslusny, NRR Project Manager (MS:
13-D-18)
- W. C. Seidle
- w/766