ML20248G773

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to Issue 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d) & 73.21)
ML20248G773
Person / Time
Site: Beaver Valley
Issue date: 10/06/1989
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910110021
Download: ML20248G773 (1)


Text

_

S AFE GU ARDS lNFORM ATION w

aver Valley Power Stat,on -

j Shippingport PA15077 0004 I

fe s$n

%cer Groa

2 *M2%

October 6, 1989

'U.

S.' Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC-20555

Reference:

Beaver Valley Power Station, Unit No. 1 and No.. 2' BV-1 Docket No. 50-334, License No. DPR-66

.BV-2 Docket No. 50-412, License No. NPF-73 BVPS Physical Security Plan (PSP)

Gentlemen:

Enclosed is Revision 8-to Issue 4

of the Beaver Valley' Power Station Physical Security Plan (PSP).

Revision 8 changes include:

(1) The addition of a figure diagram and text that provide guidance in

.the event of a land vehicle bomb attack threat.

This was added in response to Generic Letter 89-07 concerns.

(2) The physical location of the Unit 1 7R outage support trailers.

These changes have been reviewed and judged not co constitute a degradation to the previous commitments in the PSP.

These

changes, since they do not decrease

'ne safeguards effectiveness of.the Physical Security Plan, are being submitted in

.accordance with 10 CFR 50.54(p).

The enclosed materials are considered propri atary under the provision of 10 CFR 2.790(d),

and Safeguards Information under the

. provisions of 10 CFR 73.21, and thereby exempt from pu'.ilic disclosure.

If you have any questions concerning this matter, please contact my office.

Very truly yours,

~~

xs.

~ 8910110021 891006

/

FDR ADOCK 05000334

,C, J. D. Sieber

-f2:5 /

F F D_C Vice President Nuclear Group

[

'l Enclosures cc:

Addressee (4 copies of enclosures)

Mr. J.

Beall, Sr. Resident Inspector (w/o enclosures)

Mr. W. T. Russell, NRC Region I Administrator (2 copies)

Mr.

P. Tam, Sr. Project Manager (w/o enclosures)

ECOSURES CONT /!

SAFEGU ARDS INFORMATION u m m m uP d s;t SArrnfc 7 ;

cedi?

t 4