ML20248G810

From kanterella
Jump to navigation Jump to search
Requests Review & Comment on Encl Allegation RIII-89-A-003 Re Plant Activites within 30 Days of Ltr Date.Encl Withheld (Ref 10CFR2.790)
ML20248G810
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/30/1989
From: Jim Hickey
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8904130579
Download: ML20248G810 (2)


Text

.s-MAR 3 01989 Docket No. 50-461 Illinois Power Company ATTN: Mr. W.

C.. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Centlemen:

The U.S. Nuclear Regt.latory Commission recently received an allegation concerning activities at Clinton Power Station (RIII-89-A-003). Details of this allegation are enclosed for your review and followup.

We request that the results of your review and disposition of this ratter be submitted to Region III within 30 days of the date of this letter. We request that your response contain no personal privacy, proprietary, or safeguards information so it can be released w the public and placed in the NRC Public Document Room.

If necessary, such information shall be contained in a separate attachment which will be withheld from public disclosure. The affidavit required by 10 CFR 2.790(b) must accompany your response if proprietary information is included.

The enclosure to this letter should be controlled and distribution limited to personnel with a "need to know" until your investigation of the allegation has been completed and reviewed by NRC Region III. The enclosure to this ietter is considered Exempt from Public Disclosure in accordance with Title 10, Code of Federal Regulations, Part 2.790(a). However, a copy of this letter, excluding the enclosure, will be placed in the NRC Public Document Room.

The responses requested by this letter and the accompanying enclosure are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us is appreciated. We will g'adly discuss any questions you may have concerning this information.

Sincerely, lbl f,$41$ $ egggg61 John W. N. Hickey, Director p.

PDC Division of Radiation Safety and Safeguards ENCLOSURE CONTAINS

Enclosure:

Allegation Details 10CFR2. 790 INFORMATION l

(10 CFR 2.790(a) INFORMATION)

UPON SEPAEATION THIS l

PAGE IS DE00ETROLLED-l See Attached Distribution (y/

III R

pl R L.

O@

Schumalhbr n

Weil Guger It p ey g (

L _- _

Grant / jaw _f M

& "i

.o

+

o

- ~

~

. Illinois Power Company 2

M 3 0 M9 Distribution cc w/ enclosure:

D. P. Hall, Vice President J. S. Perry, Assistant Vice President R. D. Freeman, Menager, l,

Nuclear Station Engineering Department cc w/o enclosure:

DCD/DC8-(RIDS) 4 Licensing Fee Management Branch l

Resident Inspector, RIII l

Richard Hubbard J. W. McCaffrey, Chief, Public i

Utilities Division H. S. Taylor, Quality Assurance 1

Division, Sargent & Lundy Engineers David Rosenblatt, Governor's Office of Consumer Services Sheldon Zabel', Esquire, Schiff, Hardin, & Waite L..Larson, Project Manager, j

General Electric Company Chairman of De!fitt County Illinois Department'of Nuclear Safety D. Schopfer, Project Manager, Sargent & Lundy Engineers l

ENCLOSURE CONTAINS 10CFR2. 790 INFORMATION UPON SEPARATION THIS PAGE IS DE00HTROLLED 1

l.

i L__ __ -

N