Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0694-06, Forwards Rev 7 to Training & Qualification Plan.Rev Withheld + (June 3, 1994)
- RBG-40616, Forwards Required Certificate of Insurance Verifying Property Policies for Protection Against Financial Losses Due to Nuclear Accidents for River Bend Station + (June 3, 1994)
- NRC-94-4158, Discusses AP600 Design Certification Review Schedule + (June 3, 1994)
- 0CAN069402, Forwards Response to Violation Noted in Insp Repts 50-313/94-15 & 50-368/94-15.Corrective Actions:Policy Implemented to Address Failures & Retest Criteria in General Employee Training + (June 3, 1994)
- ML20069F095 + (June 3, 1994)
- 1CAN069402, Responds to 940505 Request for Verification of Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity + (June 3, 1994)
- PY-CEI-NRR-1804, Responds to NRC Re Violations Noted in Insp Rept 50-440/94-04 on 940130-0309.Corrective Actions:Reviewed Incident W/Involved Shift Supervisor + (June 3, 1994)
- PY-CEI-NRR-1809, Forwards Notification of Rev to Alert Level for Two Instruments in Loose Part Detection Sys,Per Reg Guide 1.33 + (June 3, 1994)
- 05000334/LER-1994-004-01, :on 940504,water Found Leaking from Pipe Penetration in East Trench of Pab & on 940506,plant Shutdown Initiated Due to Status of Efforts to Determine Source of Leakage.Two Foot Section of Pipe Replaced + (June 3, 1994)
- 05000461/LER-1994-005, :on 940408,while Reviewing Calculations,Concern Was Raised About Setpoints for Undervoltage Relay.Caused by Initial Design Error.Operator Has Received Training on second-level Undervoltage Scheme + (June 3, 1994)
- 05000445/LER-1994-002-01, :on 940510,control Room Missile Shield Door Was Declared Inoperable.Caused by Broken Missile Shield Door Latching Mechanism.Door Was Repaired & Control Room HVAC System Was Restored to Operable Status + (June 3, 1994)
- ML20069H040 + (June 3, 1994)
- IR 05000280/1994013 + (June 3, 1994)
- ML18151A345 + (June 3, 1994)
- ML18011A484 + (June 3, 1994)
- 05000397/LER-1993-001, :on 930213,determined That Both Trains of SPC of RHR System Were Inoperable Due to LOP Coincident W/Lpci Safety Function.Reviews & Safety Evaluations Has Been Enhanced + (June 3, 1994)
- IR 05000397/1994002 + (June 3, 1994)
- IR 05000275/1994007 + (June 3, 1994)
- IR 05000269/1994030 + (June 3, 1994)
- ML14181A559 + (June 3, 1994)
- ML18011A489 + (June 3, 1994)
- ML14181A556 + (June 3, 1994)
- ML18011A486 + (June 3, 1994)
- ML14181A558 + (June 3, 1994)
- ML17263A684 + (June 3, 1994)
- ML111820157 + (June 3, 1994)
- ML20069H043 + (June 3, 1994)
- ML20072M846 + (June 4, 1994)
- ML20266C552 + (June 4, 1994)
- ML20262E452 + (June 4, 1994)
- ML20266G066 + (June 4, 1994)
- 05000530/LER-1994-003, Corrected Ltr Forwarding LER 94-003-00,changing Ltr Number to 192-00892-JML/AKK/RKR.W/o LER + (June 4, 1994)
- ML20069J944 + (June 5, 1994)
- ML20266C546 + (June 5, 1994)
- ML17228A690 + (June 6, 1994)
- ML17228A689 + (June 6, 1994)
- Press Release-94-094, the Nuclear Regulatory Commission Has Received from Its Advisory Committee on Nuclear Waste the Attached Letter Reprot That Provides Comments on the NRCs low-level Radioactive Waste + (June 6, 1994)
- ML18039A937 + (June 6, 1994)
- ML18038A898 + (June 6, 1994)
- ML18059B045 + (June 6, 1994)
- ML18059B044 + (June 6, 1994)
- ML20069N628 + (June 6, 1994)
- ML20069N473 + (June 6, 1994)
- ML20069J165 + (June 6, 1994)
- ML20069J157 + (June 6, 1994)
- ML20069H926 + (June 6, 1994)
- ML20069H915 + (June 6, 1994)
- ML20069H906 + (June 6, 1994)
- ML20069H686 + (June 6, 1994)
- ML20069H358 + (June 6, 1994)
- ML20069H345 + (June 6, 1994)
- ML20069H325 + (June 6, 1994)
- ML20069H313 + (June 6, 1994)
- ML20069H291 + (June 6, 1994)
- ML20069H282 + (June 6, 1994)