Tennessee VaHey Authonty, Post Offee Box 2000, Soddy-Daisy, Terrwssee 373M2000 l
Ken Powers vice Prmoent Sequoyah Nuc ear Rant June 6, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - INSPECTION REPORT NOS. 50-327, 328/93 EXTEND CORRECTIVE ACTIONS DUE DATE l
Reference:
Letter from Robert A.
Fenech to NRC dated February 22, 1994, "Sequoyah Nuclear Plant (SQN) - NRC Inspection Report Nos.
50-327, 328/93 Reply to Notice of Violation (NOV)
]
50-327, 328/93-54-01"
-]
This letter extends the due date for the corrective actions to be taken in response to Example 2 of the referenced NOV.
Since the time of the reply to this NOV, additional concerns with the scaffolding program have been identified. A 30-day extension will allow the additional concerns to be addressed. The enclosure includes the commitments and revised due dates.
l l
If you have any questions concerning this submittal, please telephone J.
W.
proffitt at (615) 843-6651.
Sincerel Ken Powers ces See page 2 I
j$fl$00$ N f
/q' l
o I
I I U.S.
Nuclear Regulatory Commission Page 2 June 6, 1994 cc Mr. D.
E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S.
Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 a
4 4
4 y
[
l 4
)
ENCLOSURE i
COMMITMENTS INSPECTION REPORT 93-54 l
I i
l 1.
A training program, including qualification requirements for the erection and inspection of scaffolding, will be established. This action will be completed by July 6, 1994.
2.
The appropriate personnel will be subsequently trained on the erection and inspection of scaffolding.
This action will be completed by July 29, 1994.