Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253B896 + (January 2, 1976)
- ML19253B895 + (January 2, 1976)
- ML19291B694 + (January 2, 1976)
- ML19291B693 + (January 2, 1976)
- ML19291B692 + (January 2, 1976)
- ML19326C987 + (January 2, 1976)
- ML19326C985 + (January 2, 1976)
- ML19326C984 + (January 2, 1976)
- ML19329A318 + (January 2, 1976)
- ML20086F521 + (January 2, 1976)
- ML20151X427 + (January 2, 1976)
- ML20263B153 + (January 2, 1976)
- ML20259F002 + (January 2, 1976)
- ML20259E998 + (January 2, 1976)
- 05000219/LER-1975-034-01, /01P-0:on 751223,vacuum Breaker V-26-7 Failed to Demonstrate Operability During Surveillance Testing.Caused by Growing Problem in Teflon Bushings.Purchase Order Issued for Replacement Parts + (January 2, 1976)
- 05000281/LER-1975-020-01, /01T:on 751219,steam Generator C Pressure Indication 496 Channel IV Failed High.Caused by Frozen Sensing Line.Louvers Closed & Sealed Allowing Line to Thaw & Transmitter Returned to Normal Svc + (January 2, 1976)
- ML19343B118 + (January 2, 1976)
- ML20133B040 + (January 2, 1976)
- ML19317F593 + (January 2, 1976)
- ML19257B533 + (January 2, 1976)
- ML19256D552 + (January 2, 1976)
- IR 05000289/1975027 + (January 2, 1976)
- ML19256D551 + (January 2, 1976)
- ML19256D544 + (January 2, 1976)
- ML20138N348 + (January 3, 1976)
- ML19319C121 + (January 4, 1976)
- ML18110A785 + (January 5, 1976)
- ML19343C349 + (January 5, 1976)
- ML18353A842 + (January 5, 1976)
- ML19256D559 + (January 5, 1976)
- ML19312C391 + (January 5, 1976)
- ML20086G272 + (January 5, 1976)
- ML20085E425 + (January 5, 1976)
- ML20084S773 + (January 5, 1976)
- ML20084S509 + (January 5, 1976)
- ML20155J779 + (January 5, 1976)
- ML20236C018 + (January 5, 1976)
- NG-75-2264, Responds to NRC Re Violations Noted in IE Insp Rept 50-261/75-14.Corrective Actions:Quarterly Calibr of Survey Instruments Will Be Performed Per Health Physics Procedure HP-11 by 760131 & Procedure HP-1 Will Be Revised + (January 5, 1976)
- ML20107E998 + (January 5, 1976)
- 05000255/LER-1975-027, :on 751221,discharge Temp Exceeded Tech Spec Temp Differential Limit When Cooling Tower a Removed from Svc. Caused by Slow Valve Closing Time Which Does Not Prevent Weir Overflow Following Pump Trip + (January 5, 1976)
- ML20107E923 + (January 5, 1976)
- IR 05000029/1975017 + (January 5, 1976)
- ML20052A730 + (January 5, 1976)
- ML19329D968 + (January 5, 1976)
- IR 05000269/1975013 + (January 5, 1976)
- ML19323B890 + (January 5, 1976)
- ML19322B824 + (January 5, 1976)
- ML19329D268 + (January 5, 1976)
- ML16340A633 + (January 5, 1976)
- ML20084F914 + (January 5, 1976)
- ML19317G844 + (January 5, 1976)