ML19256D552
| ML19256D552 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/02/1976 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19256D548 | List: |
| References | |
| 50-289-75-27, NUDOCS 7910190513 | |
| Download: ML19256D552 (1) | |
Text
-
License No. DPR-50
-s APPENDIX A NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on November 17-21, 1975, it appears that certain of your activities were not c'enducted in full compliance, with conditions of your license as indicated below:
A.
Contrary to the requirement of Technical Specification 6.1.1.2.b.6 the corporate technical staff review of a viola' ion of technical t
. specification 4.1.3 was not conducted.
This is an' infraction.
B.
Contrary to the require =ent of technical specification 6.1.1.1.d.7 a PORC review of violations of technical specifications was not conducted for Iter.s of Noncompliance from Region I Inspection Report 50-289/75-16 and 75-21.
This item is a deficiency.
Other infractions and deficiencies identified through your internal audit
~
program and which ucre reported in a timely canner and corrected, or corrective action was initiated, are set out in the,. inspection report.
No additional information is needed for these ite=s at this time.
1451 251
'~._e e
e
/2)
~
~
.m c/ 910190
,