Dear Mr. Boyd:
_ tpr TURKEY POINT UNIT 3 DOCKET NO. 50-250 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAftJTS LOCATED INSIDE CO!1 TAI?31EtiT l
The subject inspection was completed on December 12, 1975, in t
accordance with the continuing requirements of the Directorate of Licensing letter dated November 8, 1973.
I.'
The inspection showed that all but two of the hydraulic restraints k
inspected were in satisfactory condition.
One restraint located on the pressurizer relief line and one located on a feedwater line had less than the minimum acceptable fluid level.
They were replaced with spare units.
].
,., 'q Very truly yours, 1
64 b?/
e Robert E.
Uhrig Vice President REU/ MAS /cpc cc:
Mr. Norman C. Moseley Jack R. Newman, Esquire 1
4 279 3
COPY 3ENr REGION 8304210317 760205 PDR ADOCK 05000251 g
0 PDR H(%P3fNh ('WBf4.DD8f.W5V\\
m
v o
p FLOR!DA POWER & UGHT COMPANY November 13, 1975 l
9-L-75-546 1
+
l 1
Director of Nuclear Reactor Regulation Attn:
Mr. Roger Boyd, Acting Director Division of Reactor Licensing U.
S. Nuclear Regulatory Commission Washington, D. C.
20555 Lear Mr. Boyd:
TURKEY POINT UNIT 3 DOCKET NO. 50-250 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS LOCATED OUTSIDE CONTAINMENT The subject inspection was completed on November 3, 1975, in accordance with the continuing requirements of the Directorate of Licensing letter dated Novembcr 8, 1973.
All safety related hydraulic pipe restraints located outside containment were in satisfactory condition.
Very truly yours,
- f. 4 he,.
In-Robert E. Uhrig Vice President REU/k1AS/cpc of cc:
Mr. Norman C. Moseley~
Jack R. Newman, Esquire
/p F+o*
I 4
P p 3
4
~
FLORIDA POWER & LIGHT COMPANY November 10, 1975
~
'~
L-75-547 Director of Nuclear Reactor Regulation Attention:
Mr. Roger Boyd, Acting Director Division of Reactor Licensing U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Boyd:
TURKEY POINT UNIT 4 DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED IIYDRAULIC PIPE RESTRAINTS LOCATED OUTSIDE CONTAINMENT The subject inspection was completed on October 24, 1975, in accordance with the continuing requirements of the Directorate of Licensing letter dated November 8, 1973.
The inspection showed that all but one of fifteen restraints inspected were in satisfactory condition.
One restraint located on a 30 inch Main Steam line had less than the minimum acceptable fluid level and was replaced with a spare unit.
Very truly yours,