Forwards IE Insp Rept 50-346/75-23 on 751208-10. No Noncompliance Noted
ML19317F593
Person / Time
Site: Davis Besse 
Issue date: 01/02/1976
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19317F594 List:
References
NUDOCS 8001150915
Download: ML19317F593 (2)


See also: IR 05000346/1975023

Text

,.

.

/ ,* *

IE FILE CO]DD

.

UNITED STATES

c,.fs)

NUCLEAR REGULATORY COMMISSION

\\M

REGloN 111

799 ROOSEVELT RO AD

CLEN ELLYN, ILLINOIS 60137

-

JAN

2 19i6

Toledo Edison Company

Docket No. 50-346

ATIN: Mr. Iowell E. Roe

Vice President

Facilitics Development

Edicon Plaza

300 Ecdison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Mescro. Sutton,

Jablonchi and Naidu of this office on December 8-10, 1975, of

activities at Lavic-Besce Nuclear Power Plant Station Unit 1

authorized by URC Construction Permit No. CPPR-80 and to the

discussion of our findings uith I'.r. Lencrdson and others of

your staff at the conclusion of the inspection.

A copy of our report of thic inspection is encloccd and identi-

fies the arena examined during the inspection. Within these

arcas, the inspection consisted of a selective es: amination of

procedures and representativo records, intervious with plant

percouncl, and observations by the inspectors.

No itens of noncomplfnnen trith IEC requiremento were identi-

fied trithin the scope of this incpection.

In accordance uith Section 2.790 of the linC's "Eules of

Practice," Part 2 Title 10, Ccde of Federal Regulationo, a

copy of this letter and the encleced inspection report vill

be placed in the NRC's Public Document Room.

If this report

contains any information that you or your contractors believe

to be propriotary, it is ucconsary that you mako a written

application to thin office, within twenty days of your

receipt of this letter, to withhold such information fron

public dicclocuic. Any such application nuot include a f ill

. .. W

p

j .g .J P,

q?

D1q

- , . . ,

c'

m

,

b

L

)

'

,

..S.3b

T

n1

D

3

~

8001150 f g

-.

-

.

-

- - - -

..

N

i

-

.

O

JAN

2 1976

. Q

Toledo I:dison company

-2-

statement of the rencons for which it is claimed that the

information is proprietary, and should be prepared so the

proprietary infornation identified in the application is

contained in a separate part of the document. Unicas tre

receive an application to withhold information or are other-

wise contacted stithin the specified time period, the tritten

,

material identified in thin paragraph 1:111 be placed in the

Public Document Ecom.

No reply to this letter io necessary; hosiever, chcuhl ycu

have any questions concerning this inspection, we trill bo

glad to discuss them with you.

Sincerely yours,

D. !!. Hunnicutt, Chief

w

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Incpection Report

No. 050-346/75-23

.bec w/ encl:

PDR

Local PDR

NSIC

TIC

U. Young Park, Nuclear Engineer

-