Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129E766 + (September 27, 1996)
- ML20128Q288 + (September 27, 1996)
- ML20129G002 + (September 27, 1996)
- ML20129E759 + (September 27, 1996)
- ML20198R646 + (September 27, 1996)
- ML20134Q118 + (September 27, 1996)
- 05000400/LER-1996-010-02, :on 960628,identified Surveillance Testing Deficiencies That Caused Past Entries Into TS 3.0.3.Caused by Personnel Error.Surveillance Test Procedures OST-1008 & OST-1092 Revised + (September 27, 1996)
- L-96-236, Informs That Util Will Aggressively Pursue Implementation of Fire Barrier Mods During 1997 Outages & Will Complete Remaining Items During Subsequent Refueling Outages Scheduled for Sept 1988 on Unit 3 & March 1999 on Unit 4 + (September 27, 1996)
- ML17333A581 + (September 27, 1996)
- ML18012A375 + (September 27, 1996)
- IR 05000528/1996015 + (September 27, 1996)
- ML17312A982 + (September 27, 1996)
- IR 05000335/1996009 + (September 27, 1996)
- L-96-234, Responds to NRC Re Violations Noted in Insp Repts 50-335/96-11 & 50-389/96-11.Changes Were Made to Applicable Plant Preventive Maintenance & Surveillance Testing Procedures to Discontinue Practice of Lubricating + (September 27, 1996)
- ML17158B810 + (September 27, 1996)
- ML18012A377 + (September 27, 1996)
- ML16342D441 + (September 27, 1996)
- ML17333A584 + (September 27, 1996)
- ML17333A585 + (September 27, 1996)
- ML16209A289 + (September 27, 1996)
- ML17333A582 + (September 27, 1996)
- ML20129B418 + (September 27, 1996)
- ML20129G956 + (September 27, 1996)
- TAC:M96277 + (September 27, 1996)
- ML17333A588 + (September 27, 1996)
- ML20128G657 + (September 27, 1996)
- ML18102A426 + (September 27, 1996)
- ML20198S625 + (September 27, 1996)
- ML17312A986 + (September 28, 1996)
- ML20138J346 + (September 28, 1996)
- ML20217D861 + (September 28, 1996)
- ML20129E746 + (September 28, 1996)
- ML20129E730 + (September 28, 1996)
- ML20129G718 + (September 28, 1996)
- ML20134D404 + (September 28, 1996)
- ML20129E946 + (September 27, 1996)
- ML20266A162 + (September 29, 1996)
- ML20198C802 + (September 29, 1996)
- ML20202E242 + (September 29, 1996)
- 05000423/LER-1996-029-02, :on 960830,functional Deficiency Was Noted in Setting of ECCS Throttle Valve Positions.Caused by Deficiency in Original Design Sys.Plant Mod Will Be Prepared to Resolve Pump Boost,Valve Clogging & Valve Erosion Issues + (September 29, 1996)
- ML20129J017 + (September 29, 1996)
- ML17229A139 + (September 30, 1996)
- ML17229A137 + (September 30, 1996)
- ML17229A061 + (September 30, 1996)
- ML17229A060 + (September 30, 1996)
- ML17229A041 + (September 23, 1996)
- ML17264A688 + (September 30, 1996)
- ML17264A682 + (September 13, 1996)
- ML17264A681 + (September 30, 1996)
- ML17333A590 + (September 30, 1996)
- ML17333A589 + (September 30, 1996)
- Press Release-I-96-066, NRC Staff Sends Inspector to ins Facility in Springfield, Ma to Look Into Weekend Water Spill + (September 30, 1996)
- ML17312A999 + (March 31, 1996)
- ML17312A998 + (September 30, 1996)
- ML18038B767 + (September 30, 1996)
- 05000260/LER-1994-010, :on 941005,loss of ECCS Division II Instrumentation Resulting from Blown Fuse in Atu Inverter. Caused by a Failed Capacitor.Blown DC Input Fuse Was Replaced + (September 30, 1996)
- ML18038B764 + (September 30, 1996)