p"tRE g 0
UNITED STATE 3 l
,j NUCLEAR REGULATORY COMMISSION o
'2 WASHINGTON, D.C. 2066EK1001
'+9.....,o PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND CAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 217 License No. DPR-44 1
l 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by PECO Energy Company, et al. (the licensee) dated March 25, 1996 as supplemented by letters dated i
August 23, 1996, and September 27, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR i
Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will rot be inimical to the common j
defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
9610090094 960927 l
PDR ADOCK 05000277 P
PDR j
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 217, are hereby incorporated in the license.
PECO Energy Company shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION a
Jo
. Stolz, Direct oject Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 27, 1996
I ATTACHMENT TO LICENSE AMENDMENT NO.217 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 j
Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised areas are indicated by marginal lines.
i Remove Insert 1
j 2.0-1 2.0-1 1
1 i
P 4
J 1
k 1
SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be s 25% RTP.
- 2.1.1.2 With the reactor steam dome pressure a 785 psig and core i
flow a 10% rated core flow:
I MCPR shall be a 1.11 for two :ecirculation loop operation or a 1.13 for single recirculation loop operation.
l 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be s 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed:
2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.
2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.2.1 Restore compliance with all SLs; and 2.2.2.2 Insert all insertable control rods.
1 2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the Plant Manager and the Vice President-Peach Bottom Atomic Power Station.
(continggdl
- MCPR values in TS 2.1.1.2 are applicable only for Cycle 12 operation s
i I
PBAPS UNIT 2 2.0-1 Amendment No. 240, 217