Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17289B261 +
- ML18096B354 +
- ML18096B353 +
- ML18153D280 +
- ML23151A480 +
- ML20058C615 +
- ML20056C216 +
- ML20056C162 +
- ML20056C133 +
- IR 05000317/1992080 +
- IR 05000269/1993006 +
- ML20056C117 +
- ML20216C326 +
- ML20045C815 +
- ML20035E984 +
- ML20035F926 +
- ML20035C411 +
- IR 05000416/1992028 +
- B14412, Responds to NRC Re Violations Noted in Insp Repts 50-245/92-29,50-336/92-31 & 50-423/92-28 on 921028-1222. C/As:Plant Design Change Records Will Be Revised to Include Requirements for Timely Pdcr Closeouts & FSAR Changes +
- IR 05000317/1993007 +
- B14360, Application for Amend to License DPR-61,revising TS 3.8.3.2.b to Allow Use of Tie Breakers 6T11 & 11T6 to Facilitate Energizing Bus 11 & Bases Section 3/4.4.4 to Address Failure of Pressurizer Pressure Channel +
- 05000269/LER-1993-003-01, :on 930218,determined That Ssf Rcmu Pump Was Inoperable Due to Design Deficiency.Pressure Vented from Rcmu Pump Suction Stabilizers,Procedures Revised & Design Basis Document Completed +
- 05000266/LER-1993-002, :on 930218,both EDG Declared Inoperable Due to Blown Fuse.Blown Fuse in Metering Circuit Replaced & Operating Instruction OI-35, Electrical Equipment Operation Revised +
- BECO-93-038, Forwards List of ISI Exams Scheduled as Part of Third Period of Pilgrim Second Ten Yr Insp Interval in Accordance W/ Section XI of ASME Boiler & Pressure Vessel Code +
- B14413, Provides Addl Info Re Schedular Exemption from Type B & C Test Requirements for Millstone Nuclear Power Station Unit 1,10CFR50,App J +
- IR 05000213/1993001 +
- IR 05000324/1993007 +
- 05000282/LER-1993-005, :on 930218,reactor Tripped Due to Inadvertent Relay Operation,Causing Loss of RCP 12.Caused by Accidental Bumping of Breaker Cubicle by Floor Burnishing Machine.Use of Addl Physical Barriers Being Considered +
- 05000354/LER-1993-001-02, :on 930216,noted That HPCI Isolation Sys Delta T in Bypass Condition During Monthly Functional Test.Caused by Procedural Inadequacy.Procedures Will Be Revised to Identify Actions to Place Channel in Svc +
- ML20035A613 +
- 05000456/LER-1993-003-05, :on 930222,lead for Ssps Test Logic Circuitry Landed on Wrong Terminal Board Point.Caused by Preservice Design Deficiency.Wires Moved to Positions Specified in Schematic Drawings & Wiring List Changed +
- 05000338/LER-1993-006, :on 930225,unidentified Potential post-LOCA, ECCS Leakage Path to Environ Occurred During Recirculation Mode of Operation.Due to Inadequate Initial Design. Engineering Evaluation Will Be Performed +
- B14403, Application for Amend to License DPR-21,revising TS LCO 3.6B,SR 4.6.B,Figures 3.6.1,3.6.2 & 3.6.3 Along W/Bases for Section 3.6 W/Respect to pressure-temp Limit Curves.Rev 1 to GE-NE-523-165-1292 Encl +
- ML20035B035 +
- ML20035A756 +
- ML20035B017 +
- ML20035A464 +
- ML20035B533 +
- ML20035A513 +
- ML20035B062 +
- PY-CEI-NRR-1616, Forwards List of Property Insurance Coverage for Facilities by Insurers,Policy Numbers & Coverage Limits,Constituting 1993 Annual Notification of Coverage +
- ML20035A815 +
- ML20035C592 +
- ML20035B091 +
- ML20035B924 +
- ML20035B465 +
- ML20035B561 +
- ML20035A626 +
- ML20035A564 +
- ML20035G989 +