ML20035B035

From kanterella
Jump to navigation Jump to search
Amends 60 & 39 to Licenses NPF-68 & NPF-81,respectively, Modifying TS by Increasing Max Core Power Level from 3,411 Mwt to 3,565 Mwt
ML20035B035
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/22/1993
From: Murley T
Office of Nuclear Reactor Regulation
To:
City of Dalton, GA, Georgia Power Co, Municipal Electric Co Of Georgia, Oglethorpe Power Corp
Shared Package
ML20035B036 List:
References
NPF-68-A-060, NPF-81-A-039 NUDOCS 9303310024
Download: ML20035B035 (2)


Text

  1. f UNITED STATES jj! T j

NUCLEAR REGULATORY COMMISSION WASHINGTON D.C-2055541001 8

%..v

,e GEORGIA POWER COMPANY' OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA V0GTLE ELECTRIC GENERATING PLANT. UNIT 1 i

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. NPF-68 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Vogtle Electric Generating Plant, Unit 1 (the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated February 28, 1992, as supplemented June 26 and August 28, 1992, and February 12, 18, 23, and 25, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; i

and E.

The issuance of this amendment is in accordance with 10 CFR Part-51 of the Commission's regulations and all applicable requirements have been satisfied.

i 9303310024 930322 gDR ADOCK 05000424 PDR 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment.to this license amendment, and paragraphs 2.C.(1) and 2.C.(2) of Facility Operating License No. NPF-68 are hereby amended to read as follows:

(1)

Maximum Power Level GPC is authorized to operate the facility at reactor core power levels not in excess of 3565 megawatts thermal (100 percent power) in accordance with the conditions specified.herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 60, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license.

GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Wwf A!g Thomas E. Murley, Director "

Office of Nuclear Reactor Regulation

Attachment:

1.

Technical Specification Changes 2.

License changes Date of Issuance:

March 22, 1993 Y

a b