Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17329A518 +
- ML17329A517 +
- ML17329A516 +
- ML17349A371 +
- ML17349A369 +
- ML18096A734 +
- ML20098D749 +
- ML20098D659 +
- ML20098D628 +
- ML20098D299 +
- ML20098D270 +
- ML20098D141 +
- ML20097F099 +
- ML20097A084 +
- ML20097A072 +
- ML20096H614 +
- ML20096H534 +
- ML20096H457 +
- ML20096H448 +
- ML20096H418 +
- ML20096H249 +
- ML20096H230 +
- ML20096G715 +
- ML20096G695 +
- ML20096F302 +
- ML20118A148 +
- ML20118A147 +
- ML20118A146 +
- ML20118A124 +
- ML20117Q168 +
- PM-91-038, Rev 0 to PM 91-038, Steam Leak Detection Sys Upgrade for Hpci,Rcic,Rwcu & Rhr +
- ML20128B423 +
- ML20126M434 +
- ML20125B106 +
- RBG-36863, Responds to NRC Ltr Re Exercise Weaknesses Noted in Insp Rept 50-458/92-06 on 920302-05.Corrective Actions:Importance Using Correct Wind Direction & Scenario Number Will Be Emphasized During Training for CR & Other Staff +
- TAC:M69744 +
- JPN-92-021, Forwards Application for Amend to License DPR-59,changing TS Table 4.2-1, Min Test & Calibr Frequency for PCIS to Reflect Plant Mod to Deactivate Reactor Vessel Head Spray Portion of RHR Sys +
- PY-CEI-NRR-1502, Confirms That Commitment,Contained in ,To Incorporate New Limit on Drywell Unidentified Leakage Rate Increase Limit Into Plant Procedures Completed.Sections of Applicable Procedures Encl +
- 05000271/LER-1992-005, :on 920306,Group 1 Primary Containment Isolation & Plant Scram Occurred.Caused by Failure of Contacts on Reactor Mode Switch to Fully Close.Switch Taken to Refuel & Scram & Isolation Reset +
- 05000482/LER-1992-008, :on 920328,discovered That 30-minute Monitoring & Logging of Indicated Axial Flux Difference for Excore Channel Not Performed Per Tech Specs.Caused by Inadequate Procedure.Procedures Revised +
- 05000416/LER-1992-005, :on 920421,inadvertent RWCU Sys Isolation Occurred.Caused by Personnel Error.Conduct of Operations procedure,01-S-06-2 & Control & Use of Operations Section procedure,02-S-01-2 Were Modified +
- 05000313/LER-1992-003-01, :on 920424,during Plant Heatup,Automatic Initiation of EFW Occurred.Caused by Securing Running Reactor Coolant Pumps Due to Reverse Rotation of Idle Pump. Procedures Will Be Revised +
- 05000313/LER-1992-002-02, :on 920421,discovered That Seismic Category II Scaffolding Storage Rack Could Have Rendered One Channel of TS-related Instrumentation Inoperable.Caused by Inadequate Configuration Control.Barrier Installed +
- ML20034F846 +
- ML20034F849 +
- ML18096A739 +
- 05000400/LER-1992-004-02, :on 920422,rev to FSAR Allowed Radiation Monitoring Sys to Be Disfunctional.Caused by Inadequate Safety Review by Util Personnel of Proposed FSAR Rev.Fsar Revised & Database Switches Changed +
- 05000397/LER-1991-003, :on 910201,review of Sp for Testing Downstream Standby Gas Treatment HEPA Filters Indicated That Methods Used Not in Compliance W/Tss Due to Inadequate air-aerosol Mixing.Appropriate Procedures Modified +
- GO2-92-126, Informs NRC That Form NRC-474 Certifying Existing WNP-2 Simulator Will Be Submitted Prior to 920630.Contractor Fabricating New Simulator Experiencing Delays.Util Prefers Recertification of Existing Simulator Over Addl Exemption +
- 05000397/LER-1992-016, :on 920424,determined That RCIC Sys Not Adequately Transferred to Remote Shutdown Panel.Caused by Misapplication of Design Inputs.Power Supply for RCIC Control Sys (48-volt Dc) Will Be Modified +