ML20096H249
| ML20096H249 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 05/21/1992 |
| From: | Simpkin T COMMONWEALTH EDISON CO. |
| To: | Murley T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| GL-87-09, GL-87-9, GL-89-14, TAC-M72042, TAC-M72043, TAC-M72044, TAC-M72045, NUDOCS 9205270152 | |
| Download: ML20096H249 (2) | |
Text
.
Ccmmenwealth Ediscn 0
1400 Opus Pitce
~ Downers Grove, lif tnois 60515 O
May 21, 1992
-Dr. Thomas E. Murley, Pirector Office Of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn:
Document Control Desk
Subject:
Byron Station Units 1 and 2 Braidwood Station Uni ts 1 and 2 Supplement to Application for Amendment to facility Operating Licenses NPF-37, NPF-66, NPF-72 and NPF-77 Appendix A, Technical Specifications TAC Nos. M72042, M72043, M72044, M72045 BC_Dachet Not. 50-451m5.0-45L_MdM and 50-152
References:
(a)
November 30, 1988,~S.C. Hunsader letter to T.E. Morley (b)
Jur.e 4,1990, S.C. Hunsader letter to T.E. Murley (c)
April 8, 1991, R.M. Pulsifer letter to T.J. Kovach Dear Dr. Murley In reference (a) pursuant to 10 CFR 50.-90,' Commonwealth Edison (Edit:,- mo;csed to amend Appendix A, Technical Specifications, of facility Opect ting Licenses NPF-37,i NPF-66, NPF-72 and NPF-77.
The proposed amendaent requcatea a change to Technical Specifications 1.0.4, 4.0.3 and 4.0.4 and the Technicc1 Specifications that are affected L.
. lese sections.
The changes-were rege?:ted and made per the requirements of Generic Letter
.87-09, to remove unnecessary restrictions on operational mode-changes and to prevent unnecessary plant shutdowns when surveillance intervals have been Inaovertently exceeded-.
7 n reference (b), CECO requested an amendment-to Specification I
4.0.2 to implement Generic Letter 89-14, which deleted the 3.25 criteria from Specification 4.0.2.
Hith reference (c), the NRC issued Amandments 40 and 27 for Byron and Braidwood respectively.
These amendments granted CECO's request to implement Generic Letter 89-14, 9205270152 920521 f00/
PDR ADOCK 05000454 P
pyg tjg
Dr. T.E. Murley May 21, 1992 The purpose of this letter is to reque3t that the revision to Specification 4.0-2-and associated bases granted with amendments 27 (BW) and 40 (BY) be incorporated into the arnendments requested with reference. (a).
Commonweal _th Edison'is notifying the State of Illinois by transmitting a copy of this_ letter to the designated State Official.
Please direct any questions you may have concerning this matter to this office.
Very truly yours, hm W,
h" T. H. Simpkin Nuclear Licensing Administrator cc: W. Kropp-Byron S. Dupont-Braidwood R. Pulsifer-NRR A.-Hsia-NRR B.'Clayton-RIII M. Parker-IDNS l
l -:
(~
l
/scl:767:45-
-.. -