Confirms That full-flow Test Line to Suppression Chamber Installed During L2R04 Refueling Outage,Per 910612 Application for Amend to License NPF-18,changing TS Re Div III 125-volt Dc battery-specific Gravity Requirements
ML20098D659
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 05/21/1992
From: Shields J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9205290217
Download: ML20098D659 (2)


Text

i

. Commcumalth Edison l 1400 Oous re lace l Downers Grove, lilinois 60515 l

May 21,1992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

LaSalle County Station Unit 2 Commitments Completed during L2R04 Facility Operating License No. NPF-13 NRCforkeLNol0-3L4

References:

(a) Peter L. Piet (CECO) letter to USNRC dated June 12,1991; Application for Amendment to Facility Operating Licenses NPF 11 and NPF-18, Appendix A, Technical Specifications; Division lli 125 Volt DC Battery Specific Gravity

! Requirements (b) Byron L. Siegel (USNRC) Jetter to Thomas J. Kovach

' CECO) dated January 30,1992; Issuance of Amendments fregarding Division 111125 Volt DC Battery Specific Gravity Requirements)

(c) Wayne E. Morgan (CECO) letter to U3NRC dated October i 10,1990; Apalication for Amendment to Facility Operating Licenses NP :-11 and NPF-10, Appendix A, Technical Specifications; Remove Technical Specification Requirement for HPCS CST Suction Valve and Add Containment Isolation Requirement for the New RCIC Test Line (d) Peter L. Piet (CECO) letter to USNRC dated Octob9r 16, 1991; Supplement to Amendment to Remove rechnical Specification Requirement fr. HPCS CST Suction Valve and Add Containment Isolation Requirement for the New RCIC Test Line (e) Byron L. Siegel (USNRC) letter to Thomas J. Kovach (CECO) dated November 27,1991; Iscuance of ^

Amendments (regarding HPCS and RCIC alignment to the Suppression Pool)

Commonwealth Edison Company requested to change the Technical Specifications govarning the Division ill 125 Volt DC battery specific gravity requirements, as detailed in Reference (a). These changes were necessary to reflect the replacement batteries which were to be installed under the LaSalle modification program. As requested in Reference (a) and as approved in Heference (b), the Unit 2 amendment was made effective prior to the startup from the L2R04 refueling outage.

This letter confirms that the Unit 2 Division ill 125 Volt DC batteries were replaced during the L2R04 outage. g

  • t d i

^"90 9205290217 920521 0

...NLDtt81

t. f/1 PDR ADOCK 05000374 P PDR -

l Document Control Desk May 21,1992 In addition, Commonwealth Edison Company submitted proposvJ Technical Specification changes (References (c) and (d)) to support the planned modifications to install an RCIC system full flow test line to the suppression chamber. As approved iii Reference (e), the Unit 2 amendment was made effective prior to the startup from the L2R04 refueling outage. This letter confilms that the Unit 2 RCIC full flow test line to the suppression chamber was installed during the L2R04 outage.

11 there are any questions regarciing this letter, please contact this office.

Sincerely,

(

llVfbMf '

JoAnn M. Shields Nuclear Licensing Administrator cc. A.B. Davis, Regional Administrator - Rill B.L. Siegel, LSCS Project Marager - NRR D.E. Hills, Senio< Resident Inspector - LSCS Office of Nudom Facility Safety -lDNS l