MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
, , ' ~ _
,V ,
, j -
G,
&gjg Q ,
l l
gnLx ~
t
.A ,
. " '. "- -" ,". ." . " Log # TXX 92245 4; -- ""_" Fi1e # 10010
=
= _-
7UELECTR/C_ May -21. -1992
, Wale J.Cahm,Jr.
w , . or ,,e nv er w ,
U, S. .Niicleari. Regulatory Cmmissi >n Attnt' Document Control Desm -
[ '; Washington,-DC -20555 ,
SUBJECT:
COMANCHE' PEAK STEAM ELECTRIC STATION (CPSES)
': : DOCKET NOS.-50"445.AND 50-446
- TRANSMITTAL OF UPDATED:0FFSITE DOSE
[ ~~
, CALCULATION' MANUAL (ODCM) 'IO SUPPr,RT LICENSIN(>/0PERATION OF UNIT 2 E -~
_ Cintl.emen:
$ :To facil.itate NRC review necessary for the licensing and oper,. tion of CPSES Unit ~2, TU Electric herewith -submits an- updated copy -of the CPSES ODCH. The 1 Jchangesiincorporated~in-this. update of;the ODCM have been approved and are -
^* : identified as " Revision 8." . The majority--'of the changes in this submittal were specifically; incorporated to support dual. unit ~operatlon. Some additional _ changes -not:specifically-related to dual--unit operation,'are
, Jalsoiincluded. -Algeneral: summary of the changes. included in this updated f1 E version?ofLtheL00CM is attached -
- Please-be advised that:all changes identifi)d with this submittal will not
~
-become effective =until a future date, tentatively- identified as Unit'2
' initial? criticality. : Prior to implementat'.an .of these changes, the most
- currentr. approved' version of the ODCM for' Unit- 1: operation will remain in Teffect;(currently Pevision 7 approved December'4, 1991).
For 'any! questions: concerning this updated copy of the CPSES ODCM. pisase .
call.Mr,-Connie Wilkerson at (214).812-881" or Mr. Doug Kay at
-(817)f897-5204.
Sincerely, g
'#R ."x- William J.'Cahill, Jr.
. in- By:
[J21 D. R. Woodlan "Q AL Docket Licensing Manager ih2
' F;3 -
- . C LW/ds'-
g'- Attachmenti-
~
Enclosure'
.o jN Ec:- McL..R. D. Martin', Region IV
- Mr. 8. hurray, Region IV.
$2
-Sesident inspectors, CPbES'(2) (clo) \\
- it -.
1Mr-,A,;E.,Hol.1an,Npp j ,' L200126
ATTACHMENT TO TXX-92245 (Page 1 of 6)
SUMMARY
OF CPSES ODCM REVISION 8 CHANGES The proposed offsite Dose Calculation Manual (ODCM) change makes revisions to incerporate Unit 2 radioactive effluent release pathways and effluent monitoring instrumentation.
Revisions are made, where applicable, to release limits and calculational methodologies to support 2 unit operations.
In addition, several changes unrelated to Unit 2 are made.
Of these, the mect significant changes are deletion of the methodologies for determining instantaneous setpoints for the stack PIG monitors particulate and icdine channels, revision of the methodology for performing 31 day dose projections and addition of provisions for establishing a flow rate setpoint for liquid effluent releases. The changes included in this ODCM change are discussed in detail below:
A. Unit 2 related chances -
a) Part I. Control 3/4.3.3.4 - The Unit 2 Turbine Building Sump monitor (2RE-5100) and Station Service Water monitors (2RE-4269 and 2RE-4270) are added to the radioact'.ve liquid effluent monitoring instrumentation requirements in Tables 3.3-7 and 4.3-3.
b) Part I, Control 3/4.11.1.1 - In Control 3.11.1.1, the words "from the site" are added to clarify that the concentration limits for liquid effluents are applicable to the combined liquid releases from the ,
site, not from each unit. Item 18.c of Tabla 4.11-1 !
is changed from "CCW Drain Tank" to "CCW Dt' q Tanks," l since there is a tank for each unit.
c) Part I, Bases 3/4.11.1.2, 3/4.11.1.3, 3/4.11.2.2, 3/4.11.2.3 - The wording in these bases regarding p'.oportionment of ef fluents among units sharing radwaste treatment systems is revised to be more plant specific. The previous wording was from standard technical specifications. The intent of this wording is not changed.
d) Part II, Section 1.0 - Changes to the description of the plant are made, as necessary, to reflect 2 unit operation.
e) Part II, Section 1.2.2 - The Unit 2 Turbine Building Sump monitor (2RE-5100) is added to this section.
ATTACHMENT TO TXX-92245 (Page 2 of 6)
SUMMARY
OF CPSES ODCM REVISION 8 CHANGES f) Eprt II, Section 1.2._1 - The Unit 2 Station Service Water monitors (2RE-4269 and 2RE-4270) are added to this section, g) Part II. Section 1.3 - This section is revised to state how compliance with the dose limits for each unit will be demonstrated. This wording is consistent with the wording in the Bases regarding proportionment of effluents among units sharing radwaste treatment systems.
h) Part II. Section 1.4 - This section is revised to clarify that dose projection limits are applicable to each unit.
- 1) Part II. Table 1.1 and Ficure 1.1 - Unit 2 release pathways and associated rad monitors are added to this table. The additional pathways are the Unit 2 CCW Drain Tank and Station Service Water Trains A and B.
j) Part II. Section 2.0 - Changes are taade to the description of the plant to reflect 2 unit operation, k) Part'II, Section 2.1 and 2.2 - Based on the addition of the Unit 2 Containment gaseous release pathway, a revision to the calculational methodologies for determining the dose rates and alarm setpoints is necessary. The existing methodology calculated setpoints and doue rates based on the total concentration of radioactive materials present in the plant vent stacks from the combined plant vent continuous-release and a batch release. This method for determining the combined concentration in the stacks from the-continuous and batch sources was based on the assumption that only one batch release occurred at a time. For example, a WGDT release and a Containment vent could not occur simultaneously.
Continued use of this methodology for 2 unit operation would require restricting simultaneous releases from Unit 1 and Unit 2 containments. This would present an undesirable operational restraint.
Therefore, the calculational methodology is revised to determine the release rate and corresponding dose rate for each individual release source based on the concentration and flow rate for that source. The dose rates for all simultaneous releases are then summed for comparison to the site dose rate limit. The rad
~ , - .. .- - -- - - - ~~ . - -_ - .. - - ... - .- - .__..-.. .
ATTACHMENT TO TXX-92245 (Page 3 of 6)
SUMMARY
OF CPSES ODCM REVISION 8 CHANGES monitor alarm setpoints are then calculated based on the total site dose rate- The revised methodology yields the same answers as the existing-methodology, with the exception of tha auxiliary. building vent monitor and containment atmosphere monitor setpoints for WGDT and containment releases, respectively.
Because the existing methodology assumed that only cae batch release was occurring at a time, it was also assumed that.all other release-sources were negligible relative to the batch release. In-the revised methodology, it is assumed that all concurrent releases could potentially contribute equally to the total site release rate-and dose rate. For containment releases, the possible concurrent release sources are Stack A, Stack B, U1-Containment and U2-Containment. For a WGDT release, the possible concurrent release sources are Stack A, Stack B and a WGDT. Thus release factors of 1/4 for containment releases and 1/3 for WGDT releases are used in the revised methodology. The resulting setpoints ,1 determined using the revised methodology will be lower by a factor of 4 for containment releases and by a factor of 3 for WGDT releases. This will ensure that the site dose rate and correuponding release rate limits will not be exceeded for simultaneous releases from multiple sources.
- 1) Part II, Section 2.3 - This section is revised to i state how comp'_iance with dose limits for each unit will be demonstrated. This wording is consistent with the wording in the Bases regarding proportionment of effluents among units sharing radwaste treatment system.
m) Eart II. Section 2.4 - This section is revised to clarify that dose projection limits are applicable to each unit.
B. Chances not related to Unit 2 -
a) Part I, Control 3/4.3.3.4. Table 3.3-7. Actions 31.and 32 - Clarification regarding the specified LLD's in these actions was-provided in ODCM Appendix G, Supplemental Guidance Statement #1. These actions are revised to incorporate this guidance and Supplemental Guidance Statement #1 is deleted.
1 ATTACHMENT TO TXX-92245 (Page 4 of 6) i
SUMMARY
OF CPSES ODCM REVISION 8 CHANGES b) Eart I, Control 3/4.11.1.1., Table 4.11-1. Notation 3
- Clarification regarding the specified LLD's for dissolved and entrained gases in liquid effluent samples was provided in ODCM Appendix G, Supplemental Guidance Statement #2. Table 4.11-1, Notation 3 is revised to incorporate this guidance and Supplemental Guidance Statement #2 is deletei.
I c) Part I, Surveillance Recuirement 4 11,2.1 - The l wording of this surveillance requirement was revised l to be consistent with the wording of Surveillance i Requirement 4.11.1.1 for liquid effluents. The ;
existing wording did not clearly refer to sampling and analyzing airborne waste streams for noble gases.
This revision is made for clarification and the intent and requirements of the surveillance are not changed, d) Part I, Control 3/4.12.1, Table 4.12-1. Notation 3 -
The term "'i" is added to the equation for determination of LLD. This term had been inadvertently omitted from the previous revision.
e) Part I, Administrative Control 6.9.1.3 - The sentence requiring that the initial report include copies of reports of the pre-operational monitoring program for at least two years prior to initial criticality is deleted. This requirement was met with the first report submitted for Unit 1. The pre-operational program ended with the initial criticality of Unit 1.
f) Part II, Section 1.0 - Wording is added to this section to describe the methods used for mixing liquid batch releases to assure representative sampling.
Part I, Table 4.11-1, Notation 2 requires that the method for mixing be described in the ODCM. This information was not included in previous revisions.
g) Part II, Section 1.2 - Wording is added to this section to allow for establishing a flow rate setpoint for liquid waste discharges when a flow rate less than the maximum flow rate is used for calculations. This setpoint will ensure that 10CFR20, Appendix B, Table II, Column 2 MPC's are not exceeded. The previous revision required that the maximum flow rate always be used in effluent. calculations and a flow rate setpoint was not required. The establishment of a flow rate setpoint is consistent with the requirements of Control 3/4.3.3.4 for liquid effluent monitoring
- instrumentation.
ATTACHMENT TO TXX-92243 (Page 5 of 6)
SUMMARY
OF CPSES ODCM REVISION 8 CHANGES h) Part II. Sections 1.4 and 2.4 - The methodology for performing liquid and caseous 31-day dose projections is revised. The existing methodology divides the quarter-to-date cumulative dose by the number of days into-the quarter and to determine an average dose per day. This dose per day is multiplied by 31 to calculate the 31 day dose projection. By using the quarter-to-date dose, the average dose per day is based on a variable time period. The methodology is revised to use the cumulative dose for the previous 3 month period, rather than the quarter-to-date. This will result in a consistent time period used for determination of average daily dose for dose projections. -
- 1) Part II. Section 2.0 - This section is revised to include-a more detailed discussion of all gaseous release sources. This information is descriptive in nature and does not affect dose or setpoint calculation methods. ,
j) Part II, Section 2.0 and 2.2'- The methodologies for determining instantaneous setpoints for the stack PIG's particulate and iodine channels is deleted.
Operational experience has shown that determination of setpoints for these monitors is not practical. This change is consistent with the guidance of NUREG-0133 which states that it is not practical to establish '
instantaneous setpoints for integrating type monitors.
Additionally these monitoring channels are not required by the-gaseous effluent monitoring instrumentation requirements established in Control 3/4.3.3.5. The requirement for sampling of particulates and iodines in Table 3.3-8.is met by the particulate and iodine sample collection devices on the WRGM skid. Compliance with the instantaneous release limits for particulates and iodines is demonstrated by calculations based on the analysis of these samples. Therefore, deletion of the methodology for determination of these setpoints will not adversely affect the-existing level of' effluent-control or accountability.
k) Part II. Accendix D .The not discussing parameters used for calculation of goat milk factors is revised to address the Qp parameter. This value was used for R values tabulated in the ODCM, but was not discussed in-the appendix.
. *. s i
ATTACHMENT TO TXX-92245 (Page 6 of 6)
SUMMARY
OF CPSES ODCM REVISION 8 CHANGEfS
- 1) Part II, Annendix G, Suoclemental Guidance Statement f.1 - This guidance statement clarifies that it is acceptable to route the CCW Drain Tank contents to the Waste Water Holdup Tanks (WWHTs) to meet batch sampling requirements. Table 4.11-1, Notation 7 already states that sampling of the CCW Drain Tank is not required when it is routed to the WWHT's.
Therefore, this supplemental guidance statement is deleted.