Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132C475 + (05000265)
- ML20126C709 + (05000265)
- ML20212K553 + (05000254)
- ML20209H844 + (05000254)
- ML20126F235 + (05000265)
- ML20203L551 + (05000254)
- ML20214X413 + (05000321)
- NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 + (05000266)
- ML20055G571 + (00271)
- ML19256E776 + (05000266)
- PNO-III-79-060A, following Shutdown on 791211,two Leaking Plugs Detected During Static Head Test of Steam Generator B & Leaking Tube Detected During Hydrostatic Tests.Inspector Dispatched to Follow Testing,Repair & re-hydro of Leaks + (05000266)
- ML20028H864 + (05000267)
- ML20085L685 + (05000267)
- ML20150C454 + (05000267)
- ML20154J456 + (05000267)
- ML20155F405 + (05000267)
- IR 05000267/1976007 + (05000267)
- ML19317D940 + (05000269)
- ML19322C087 + (05000269)
- ML20203K740 + (05000369)
- 05000369/LER-1991-009-01, :During Wk of 910708,hardware Limits for Certain Process Control Equipment in Reactor Protection Sys Exceeded.Caused by Design Deficiency Due to Deficient Documentation.Resistors Changed + (05000369)
- ML19329A188 + (05000269)
- ML19319B173 + (05000270)
- ML19344A900 + (05000269)
- ML20079C035 + (05000373)
- ML20128M546 + (05000269)
- ML19317F357 + (05000270)
- ML19312C929 + (05000270)
- ML19254E713 + (05000320)
- ML19347F050 + (00771)
- ML19275G743 + (00771)
- ML20071A033 + (00771)
- ML20141N619 + (00771)
- ML20212M432 + (00771)
- ML20056G104 + (00771)
- ML20070M898 + (00771)
- ML20029B386 + (00771)
- ML20151T666 + (00771)
- ML18106A446 + (05000272)
- ML18102A796 + (05000272)
- ML18101A466 + (05000272)
- ML20058G725 + (05000272)
- BECO-88-112, Semiannual Marine Ecology Rept 32,Jan-June 1988 + (05000293)
- BECO-92-137, Semi-Annual Rept 40 for Marine Ecology Studies Related to Operation of Pilgram Station Jan-June 1992 + (05000293)
- ML20058B819 + (05000293)
- ML20209C818 + (05000000)
- ML20204E714 + (05000275)
- ML20215N074 + (05000000)
- ML20211D902 + (05000000)
- ML20010D661 + (00775)
- ML20212J150 + (05000000)
- IR 05000275/1993012 + (05000275)
- ML20052H096 + (05000320)
- ML021370258 + (05000003)
- ML20079B295 + (05000277)
- ML20133D595 + (05000277)
- ML20248D615 + (05000277)
- PNO-I-80-069, on 800501,secondary Containment Integrity Was Broken.On 800502,fuel Bundle in Spent Fuel Pool Was Removed for Insp,Violating Tech Specs.No Release Was Involved.Fuel Motion Was Secured & Refueling Bridge Locked + (05000277)
- PNO-I-80-047, on 800326,PA Electric Co Test Engineer Fell Six Feet from Radwaste Demineralizer Into Surrounding Pit. Anti-Cs Contaminated to 1000 Dpm.Due to Nature of Injuries, Man Transported to Hosp W/O Cleanup or Anti-C Removal + (05000277)