,A:-

da aAJa A,

.,_a GEORGIA POWER COMPANY M ONTH LY OPERATING DATA REPORTS PLANT HATCH UNITS 1

AND 2

e

\\'-

~~

gg mit ti t ill l I I 1/ !lllll lll k

k

' r i

i t.

,J pmm as ss d\\

6

} Georgia Power ENCLOSURE 1-TABLE OF CONTENTS PLANT HATCH - UNIT 1 NRC DOCKET DPR-57 MONTHLY OPERATING REPORT MAY 1987 NARRATIVE REPORT Page El-1 OPERATING DATA. REPORT Page El-2 AVERAGE DAILY P0HER LEVEL Page El-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page El-4 i.

I-u I,i 0166C l

l r-c.me.--.

m,,., _, _, _,

_,,,,,.,,,,,,m,_,,

m.,,,..,_,,

NARRATIVE REPORT DDCkET NO.

50-321-IJNIT 1 DATE:

JUNE 2, 1987

-COMPLETED By:

J.H. RICHAADSON TELEPHONE:

(912)'067-7781 x2879 May 1 0000-Refueling outage continues.

May 1 0552 Core unloading complete.

May 31 2400 Refueling outage continues.

S l

I e

i 1

ll El-1 l-l

?

k'

OPERATING DATA REPORT LOCKET NO. 50-321 DATE: JUNE 2 1987 CCMPLETED BY J.

H.

RICHARDSON TELEPHONE: (912) 367-7781.x2878 OPERATING STATUS

1. UNIT NAME:

E.

I. HATCH UNIT 1

2. REPORT PERIOD:

May-87

3. LICENSED THERMAL POWER (MWt):

2436

0. NAMEPLATE RATING (GROSS MWe):

850

5. DESIGN ELECTRICAL RATING (NET MWe):

776.3

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

783

7. MAXIP*UM DEPENDABLE CAPACITY (NET MWe):

750

@. '!F CHANGES OCCUR IN CAPACITY RATINGS -

(ITEMS 3 79 ROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NO CHANGES O. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 3623 100054

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

0.0 2646.2 70293.7

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE:

0.0 2603.8 66329.2

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

O 5976101 142448012 17.' GROSS ELEC. ENERGY GENERATED.(MWH):

0 1944030 46011380

18. NET ELEC. ENERGY GENERATED (MWH):

-4032 1855186 43698096

19. UNIT SERVICE FACTOR:

0.0%

71.9%

66.3%

l

20. UNIT AVAILABILITY FACTOR:

0.0%

71.9%

66.37.

l

21. UNIT CAPACITY FACTOR (USING MDC NET):

0.0%

68.3%

58.2%

l

22. UNIT CAPACITY FACTOR (USING DER NET):

0.0%

66.0%

55.9%

23. UNIT FORCED OUTAGE RATE:

0.0%

2.5%

16.0%

24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING OUTAGE, APRIL 22, 1987, 45-60 DAYS 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP JUNE 18

21. UNITS IN TEST STATUS ( PR,10R TO COMMERCIAL OPERATION):

N/A l

l l

El-2 I

b

' UNIT 1 AVERAGE DAILY DOCKET.NO.

50-321 POWER LEVEL DATE:

JUNE 2, 1997 COMPLETED BY ' J.

H.

RICHARDsCN TELEPHONE:

(912) 367-7791 x2978 DAY Net MW 1

0 2.........

0 3.........-

0 4

0 5.........

0 6.........

0

'7'.........

- 0 8.........

0 9.........

0 10.........

0 11'.........

0 12.........

0 13.........

0 14 0

15.........

0 16.........

0 17.........

0 18.........

0

-19.........

0 20.........

0 a

21 0

22.........-

0 23.........

0 24.........

0 25.........

0 26.........

O.

27.........

0 28.........

0 29 0

30.........

C 31 C

6 J

L El-3 i

I 9

m w

r

- +,,

-n

,,,,.,,-p-=

c -

r.,-,

-t-s v:

q

+-Mv-v~w--wo-ow-w--v---+w

-w 19-w w e --*-

g -- w vv=-sg----wee--.=

m v--'-y

  • marm-*ww~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCVET NO.

50-321 DATE:

JUNE 2, 1987 UNIT NAME:

E.I. HATCH t COMPLETED BY J.H.

RICHARDSON TELEPHONE:

(912) 367-7781 x2878 REPORT MONTH - MAY 1997

.I I

I I

I E I E I I Y I

I I

I I

I TI I A I T ILICENSEEI SC1 1

I I

I i YI I SI H ! EVENT I TOI I

CAUSE & CORRECTIVE I

I I

I P IDURATIONI O I O I REPORT I E D ICOMPONENTI ACTI(36 TD I

I NO.

I DATE I E I(HOURS) ! N I D ! NUMBER I MEI COCE I

PREVENT RECURRENCE I

l -

___l.

l___f....___.!___l.._l l

'1 187-010 18705011 S I 744 I CI 4 I N/A I RC I FUELXX IRefueling outage continues. I I

I I

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

1 1

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

-l l

I

-1 I

I I

I I

I I

I I

I i

1 1

I I

I i

1 1

1 1

1 1

1 1

I I

I I

I I

1 1

1 1

1 I

I i

i I

1 I

I I

I I

I 1

I I

I I

I i

i i

I I

l-1 I

I I

l i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

I I

I i

I i

l l

I I

I I

I I

I I

I i

i I

I I

I I

I I

I I

I I

I i

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

I l'

I I

I I

I I

I i

1 i

l I

I i

~l i

I I

i i

l l_______I

__I__1._______I___l___t___

_t 1

F FORCED REASONS METHOD:

EVENTS REPORTED INVOLVE C: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20*/.

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR.

D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) l El-4 l

Georgia PowerA ENCLOSURE 2 TABLE OF CONTENTS PLANT HATCH - UNIT 2 NRC DOCKET NPF-5 MONTHLY OPERATING REPORT MAY 1987 NARRATIVE REPORT Page E2-1

't OPERATING DATA REPORT Page E2-2

~

-AVERAGE DAILY POWER LEVEL Page E2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E2-4 0166C.

700775

NARRATIVE REPORT DOCAET NO.

50-366 UNIT 2 DATE:

JUNE 2, 1987 COMPLETED BY:

J.H.

RICHARDSON TELEPHONE:

(912) 367-7781 x2878 May 1 0000 Unit operating at 100% power with no cperational problems.

May 3 0030 Reducing load to 750 MWe for weekly turbine valve /auxiltaries testing.

May 0 0058 Returning unit to full power.

May 9 2105 Reducing load to 750 MWe for weekly turbine valve / auxiliaries testing.

May 9 2207 Returning unit to full power.

May 15.

1943 Reducing load to 450 MWe for turbine valve / auxiliaries testing, cleaning circulating water screens, MSIV testing, and maintenance on the fourth stage feedwater heaters.

May 16 1714 Power ascension in progress. Power will be maintained at 85%~to limit offgas activity resulting from fuel defects.

May 16 1855 Unit at 85% power May 20 1710 Increasing power to 90%.

Offgas activity continues to be monitored.

May 31 2400 Masntaining 90% power to limit offgas activity.

E2-1

. ~..-.

OPERATING DATA REPORT DOCKET NO. 50-366 DATE: JUNE 2, 1987 COMPLETED BY J.

H.

RICHARDSON TELEPHONE: (912) 367-7701 x2878 OPERATING STATUS:

1. UNIT NAME:

E.

1. HATCH UNIT 2
2. REPORTING PERIOD:

May-87

3. LICENSED THERMAL POWER (MWt):

2436

4. NAMEPLATE RATING (GROSS MWe):

850

5. DE2IGN ELECTRICAL RATING (NET MWel:

784

c. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

794

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

761 C. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NO CHANGES

9. POWER LEVEL TO WHICH RESRTICTED, IF ANY (NET MWe):

90% (700 MWe) 3

10. REASONS FOR RESTRICTION, IF ANY:

ADMINISTRATIVE - TO LIMIT OFFGAST ACTIVITY.

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 3623 67680

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 3596.0 47609.3

13. REACTOR RESERVE SHUTDOWN HOU'S:

0.0 0.0 0.0 A

14. HOURS GENERATOR ON LINE:

744.0 3552.2 45591.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 16.~ GROSS THERMAL ENERGY GENERATED (MWH):

1689000 8398074 98499009

17. GROSS ELEC. ENERGY GENERATED (MWH):

556340 2789330 32383540

18. NET ELEC. ENERGY GENERATED (MWH):

532332 2671629 30021500 19 UNIT SERVICE FACTOR:

100.0%

99.0%

67.4%

20. UNIT AVAILABILITY FACTOR:

100.0%

98.0%

67.4%

21. UNIT CAPACITY FACTOR (USING MDC NET):

94.0%

96.9%

59.6%

22. UNIT CAPACITY FACTOR (USING DER NET):

91.3%

94.1%

58.1%

23. UNIT FORCED OUTAGE RATE:

0.0%

2.0%

8.9%

24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A 25..IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs.

N/A U. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A I

l E2-2

UNIT 2 AVERAGE DAILY DOCKET NO.

50-366 POWER LEVEL DATE:

JUNE 2, 1987 COMPLETED BY J.

H.

RICHARDSON TELEPHONE:

(912) 367-7781 x2878 DAY Net MW 1

774 2.........

773 3.........

773 4

773 5.........

774 6.........

773 7

771 8.........

768 9

771 10.........

774 11 771 12-.........

767 7

13.........

766 14.........

766 15.........

.714 16.........

492 17.........

643 18.........

638 19.........

644 20.........

651 21 685 l

22.........

695 23.........

695 24.........

689 25.........

691 26'.........

691 27.........

690 28.........

691 29.........

692 30.........

692 31 693

)

E2-3

r.,, --

y, n -,,,


ps

.-~c,,

,.,-mmo

,m,..,-~,e-ee w...

,w,,

,_,.nn--n--,-

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-766 DATE:

JUNE 2, 1987 UNIT NAME:

E.I. HATCH 2 COMPLETED BY:

J.H.

RICHARDSON TELEPHONE:

(912) 367-7781 x2878 REPORT MONTH - MAY 1997

=.

I I

.I I

I E I E I I Y I

I I

I I

I T 1 1 A l T ! LICENSEE! SC1 1

I I

I I Y I I S I H I EVENT l T0t I

CAUSE & CORRECTIVE t

i I-IP IDURATIONI OI O I REPORT I E D ICOMPONENTI ACTION TQ t

i NO.

I DATE I E I(HOURS) I N I D 1 NUMBER I MEI CODE I

FREVENT RECURRENCE I

I_______l

-!__.I_______.8___l___l

__l I

l

_____t 187-006 18705151 S I O I B 1 5 ! N/A B

.CH I-HTEXCH IMaintenance on 4th stage I

l i

I I

i I

I I

Ifeedwater heaters, cleani'gcfl n

l l

1-1 1

1 1

I Icirc. water screens, and MSIVF 1

I

-l i

I I

I I

I ltesting. Refer to pg. E2-1tl. t I

I I

I I

I I

I lof narrative report.

"I I

I I

I l

I I

I I

  • I 187-010 18705161 SI O 1 F I 5 i N/A I RC I FUELXX

! Administrative decision to*

I I

I I

i 1

1 I

imatntain 85-90% power to i

I I

I I

I I

I I

I llimit offgas activity. Refert i

I I

I I

I I

I I

Ito pg. E2-1 of narrative I

I I

I I

I i

1 I

treport.

I I

I I

I 1

1 I

I I

I i

i I

I I

I I

I I

I l

I i

i I

I I

I i

I I

i I

I i

1 1

I I

I I

I I

I I

I I

I I

I I

I I

i I

I I

I I

I I

I I

I I

I I

I I

'l i

I I

I I

I I

I I

I-1 I

I I

I I

I I

I I______.!____.l___I_____.__l.__I___I I

_l_____---

l F: FORCED REASON:

METHOD:

EVENTS REPORTED INVOLVE S SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELINS 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE FRECEEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN)

E2-4

Georgia Power Company 333 Piedmont Avenue Atfanta, Georgia 30308 -

T lephone 404 5264526 Mailing Address; Post Office Box 4545 Atlanta. Georgia 30302 Georgia Power L T. Gucwa

!!>e sowhern efectnc stMem Manager Nuclear Safety and Licensing SL-2649 0166C X7GJ17-H510 June 9, 1987 Director, Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Hashington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:

Enclosed are the Monthly Operating Reports for Plant Hatch Unit 1,.

Docket Number 50-321, and for Plant Hatch Unit 2, Docket Number 50-366.

These reports - are submitted pursuant to the requirements of Technical Specifications Section 6.9.1.10.

Sincerely,

. T. Gucwa LGB/lc

Enclosures:

1.

Monthly Operating Report for Hatch-1 2.

Monthly Operating Report for Hatch-2 c:

(see next page)

$'h r

i i

GeorgiaPower A Director, Office of Management and Program Analysis

' June 9,:1987 Page Two c: -Georaia Power Company

,Mr. J. P. O'Reilly, $r. Vice President - Nuclear Operations Mr.' J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS

~

U. S. Nuclear Reaulatory Commission. Washinaton. D. C.

Mr. L. P. Crocker, Hatch Licensing Project Manager U. S. Nuclear Reaulatory Commission. Reaion II

'Dr. J. N. Grace, Regional Administrator:

^Mr. P.' Holmes-Ray, Senior Resident Inspector - Hatch

=

i 0166C mm

.