Text
,A:-
da aAJa A,
.,_a GEORGIA POWER COMPANY M ONTH LY OPERATING DATA REPORTS PLANT HATCH UNITS 1
AND 2
e
\\'-
~~
gg mit ti t ill l I I 1/ !lllll lll k
k
' r i
i t.
,J pmm as ss d\\
6
} Georgia Power ENCLOSURE 1-TABLE OF CONTENTS PLANT HATCH - UNIT 1 NRC DOCKET DPR-57 MONTHLY OPERATING REPORT MAY 1987 NARRATIVE REPORT Page El-1 OPERATING DATA. REPORT Page El-2 AVERAGE DAILY P0HER LEVEL Page El-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page El-4 i.
I-u I,i 0166C l
l r-c.me.--.
m,,., _, _, _,
_,,,,,.,,,,,,m,_,,
m.,,,..,_,,
NARRATIVE REPORT DDCkET NO.
50-321-IJNIT 1 DATE:
JUNE 2, 1987
-COMPLETED By:
J.H. RICHAADSON TELEPHONE:
(912)'067-7781 x2879 May 1 0000-Refueling outage continues.
May 1 0552 Core unloading complete.
May 31 2400 Refueling outage continues.
S l
I e
i 1
ll El-1 l-l
?
k'
OPERATING DATA REPORT LOCKET NO. 50-321 DATE: JUNE 2 1987 CCMPLETED BY J.
H.
RICHARDSON TELEPHONE: (912) 367-7781.x2878 OPERATING STATUS
- 1. UNIT NAME:
E.
I. HATCH UNIT 1
- 2. REPORT PERIOD:
May-87
- 3. LICENSED THERMAL POWER (MWt):
2436
- 0. NAMEPLATE RATING (GROSS MWe):
850
- 5. DESIGN ELECTRICAL RATING (NET MWe):
776.3
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
783
- 7. MAXIP*UM DEPENDABLE CAPACITY (NET MWe):
750
@. '!F CHANGES OCCUR IN CAPACITY RATINGS -
(ITEMS 3 79 ROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NO CHANGES O. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 3623 100054
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
0.0 2646.2 70293.7
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE:
0.0 2603.8 66329.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
O 5976101 142448012 17.' GROSS ELEC. ENERGY GENERATED.(MWH):
0 1944030 46011380
- 18. NET ELEC. ENERGY GENERATED (MWH):
-4032 1855186 43698096
- 19. UNIT SERVICE FACTOR:
0.0%
71.9%
66.3%
l
- 20. UNIT AVAILABILITY FACTOR:
0.0%
71.9%
66.37.
l
- 21. UNIT CAPACITY FACTOR (USING MDC NET):
0.0%
68.3%
58.2%
l
- 22. UNIT CAPACITY FACTOR (USING DER NET):
0.0%
66.0%
55.9%
- 23. UNIT FORCED OUTAGE RATE:
0.0%
2.5%
16.0%
24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING OUTAGE, APRIL 22, 1987, 45-60 DAYS 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP JUNE 18
- 21. UNITS IN TEST STATUS ( PR,10R TO COMMERCIAL OPERATION):
N/A l
l l
El-2 I
b
' UNIT 1 AVERAGE DAILY DOCKET.NO.
50-321 POWER LEVEL DATE:
JUNE 2, 1997 COMPLETED BY ' J.
H.
RICHARDsCN TELEPHONE:
(912) 367-7791 x2978 DAY Net MW 1
0 2.........
0 3.........-
0 4
0 5.........
0 6.........
0
'7'.........
- 0 8.........
0 9.........
0 10.........
0 11'.........
0 12.........
0 13.........
0 14 0
15.........
0 16.........
0 17.........
0 18.........
0
-19.........
0 20.........
0 a
21 0
22.........-
0 23.........
0 24.........
0 25.........
0 26.........
O.
27.........
0 28.........
0 29 0
30.........
C 31 C
6 J
L El-3 i
I 9
m w
r
- +,,
-n
,,,,.,,-p-=
c -
r.,-,
-t-s v:
q
+-Mv-v~w--wo-ow-w--v---+w
-w 19-w w e --*-
g -- w vv=-sg----wee--.=
m v--'-y
- marm-*ww~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCVET NO.
50-321 DATE:
JUNE 2, 1987 UNIT NAME:
E.I. HATCH t COMPLETED BY J.H.
RICHARDSON TELEPHONE:
(912) 367-7781 x2878 REPORT MONTH - MAY 1997
.I I
I I
I E I E I I Y I
I I
I I
I TI I A I T ILICENSEEI SC1 1
I I
I i YI I SI H ! EVENT I TOI I
CAUSE & CORRECTIVE I
I I
I P IDURATIONI O I O I REPORT I E D ICOMPONENTI ACTI(36 TD I
I NO.
I DATE I E I(HOURS) ! N I D ! NUMBER I MEI COCE I
PREVENT RECURRENCE I
l -
___l.
l___f....___.!___l.._l l
'1 187-010 18705011 S I 744 I CI 4 I N/A I RC I FUELXX IRefueling outage continues. I I
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
-l l
I
-1 I
I I
I I
I I
I I
I i
1 1
I I
I i
1 1
1 1
1 1
1 1
I I
I I
I I
1 1
1 1
1 I
I i
i I
1 I
I I
I I
I 1
I I
I I
I i
i i
I I
l-1 I
I I
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
I I
I i
I i
l l
I I
I I
I I
I I
I i
i I
I I
I I
I I
I I
I I
I i
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
I l'
I I
I I
I I
I i
1 i
l I
I i
~l i
I I
i i
l l_______I
__I__1._______I___l___t___
_t 1
F FORCED REASONS METHOD:
EVENTS REPORTED INVOLVE C: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20*/.
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR.
D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) l El-4 l
Georgia PowerA ENCLOSURE 2 TABLE OF CONTENTS PLANT HATCH - UNIT 2 NRC DOCKET NPF-5 MONTHLY OPERATING REPORT MAY 1987 NARRATIVE REPORT Page E2-1
't OPERATING DATA REPORT Page E2-2
~
-AVERAGE DAILY POWER LEVEL Page E2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E2-4 0166C.
700775
NARRATIVE REPORT DOCAET NO.
50-366 UNIT 2 DATE:
JUNE 2, 1987 COMPLETED BY:
J.H.
RICHARDSON TELEPHONE:
(912) 367-7781 x2878 May 1 0000 Unit operating at 100% power with no cperational problems.
May 3 0030 Reducing load to 750 MWe for weekly turbine valve /auxiltaries testing.
May 0 0058 Returning unit to full power.
May 9 2105 Reducing load to 750 MWe for weekly turbine valve / auxiliaries testing.
May 9 2207 Returning unit to full power.
May 15.
1943 Reducing load to 450 MWe for turbine valve / auxiliaries testing, cleaning circulating water screens, MSIV testing, and maintenance on the fourth stage feedwater heaters.
May 16 1714 Power ascension in progress. Power will be maintained at 85%~to limit offgas activity resulting from fuel defects.
May 16 1855 Unit at 85% power May 20 1710 Increasing power to 90%.
Offgas activity continues to be monitored.
May 31 2400 Masntaining 90% power to limit offgas activity.
E2-1
. ~..-.
OPERATING DATA REPORT DOCKET NO. 50-366 DATE: JUNE 2, 1987 COMPLETED BY J.
H.
RICHARDSON TELEPHONE: (912) 367-7701 x2878 OPERATING STATUS:
- 1. UNIT NAME:
E.
- 1. HATCH UNIT 2
- 2. REPORTING PERIOD:
May-87
- 3. LICENSED THERMAL POWER (MWt):
2436
- 4. NAMEPLATE RATING (GROSS MWe):
850
- 5. DE2IGN ELECTRICAL RATING (NET MWel:
784
- c. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
794
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
761 C. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NO CHANGES
- 9. POWER LEVEL TO WHICH RESRTICTED, IF ANY (NET MWe):
90% (700 MWe) 3
- 10. REASONS FOR RESTRICTION, IF ANY:
ADMINISTRATIVE - TO LIMIT OFFGAST ACTIVITY.
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 3623 67680
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 3596.0 47609.3
- 13. REACTOR RESERVE SHUTDOWN HOU'S:
0.0 0.0 0.0 A
- 14. HOURS GENERATOR ON LINE:
744.0 3552.2 45591.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16.~ GROSS THERMAL ENERGY GENERATED (MWH):
1689000 8398074 98499009
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
556340 2789330 32383540
- 18. NET ELEC. ENERGY GENERATED (MWH):
532332 2671629 30021500 19 UNIT SERVICE FACTOR:
100.0%
99.0%
67.4%
- 20. UNIT AVAILABILITY FACTOR:
100.0%
98.0%
67.4%
- 21. UNIT CAPACITY FACTOR (USING MDC NET):
94.0%
96.9%
59.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET):
91.3%
94.1%
58.1%
- 23. UNIT FORCED OUTAGE RATE:
0.0%
2.0%
8.9%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A 25..IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs.
N/A U. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
N/A I
l E2-2
UNIT 2 AVERAGE DAILY DOCKET NO.
50-366 POWER LEVEL DATE:
JUNE 2, 1987 COMPLETED BY J.
H.
RICHARDSON TELEPHONE:
(912) 367-7781 x2878 DAY Net MW 1
774 2.........
773 3.........
773 4
773 5.........
774 6.........
773 7
771 8.........
768 9
771 10.........
774 11 771 12-.........
767 7
13.........
766 14.........
766 15.........
.714 16.........
492 17.........
643 18.........
638 19.........
644 20.........
651 21 685 l
22.........
695 23.........
695 24.........
689 25.........
691 26'.........
691 27.........
690 28.........
691 29.........
692 30.........
692 31 693
)
E2-3
- r.,, --
y, n -,,,
ps
.-~c,,
,.,-mmo
,m,..,-~,e-ee w...
,w,,
,_,.nn--n--,-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-766 DATE:
JUNE 2, 1987 UNIT NAME:
E.I. HATCH 2 COMPLETED BY:
J.H.
RICHARDSON TELEPHONE:
(912) 367-7781 x2878 REPORT MONTH - MAY 1997
=.
I I
.I I
I E I E I I Y I
I I
I I
I T 1 1 A l T ! LICENSEE! SC1 1
I I
I I Y I I S I H I EVENT l T0t I
CAUSE & CORRECTIVE t
i I-IP IDURATIONI OI O I REPORT I E D ICOMPONENTI ACTION TQ t
i NO.
I DATE I E I(HOURS) I N I D 1 NUMBER I MEI CODE I
FREVENT RECURRENCE I
I_______l
-!__.I_______.8___l___l
__l I
l
_____t 187-006 18705151 S I O I B 1 5 ! N/A B
.CH I-HTEXCH IMaintenance on 4th stage I
l i
I I
i I
I I
Ifeedwater heaters, cleani'gcfl n
l l
1-1 1
1 1
I Icirc. water screens, and MSIVF 1
I
-l i
I I
I I
I ltesting. Refer to pg. E2-1tl. t I
I I
I I
I I
I lof narrative report.
"I I
I I
I l
I I
I I
- I 187-010 18705161 SI O 1 F I 5 i N/A I RC I FUELXX
! Administrative decision to*
I I
I I
i 1
1 I
imatntain 85-90% power to i
I I
I I
I I
I I
I llimit offgas activity. Refert i
I I
I I
I I
I I
Ito pg. E2-1 of narrative I
I I
I I
I i
1 I
treport.
I I
I I
I 1
1 I
I I
I i
i I
I I
I I
I I
I l
I i
i I
I I
I i
I I
i I
I i
1 1
I I
I I
I I
I I
I I
I I
I I
I I
i I
I I
I I
I I
I I
I I
I I
I I
'l i
I I
I I
I I
I I
I-1 I
I I
I I
I I
I I______.!____.l___I_____.__l.__I___I I
_l_____---
l F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELINS 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE FRECEEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4
Georgia Power Company 333 Piedmont Avenue Atfanta, Georgia 30308 -
T lephone 404 5264526 Mailing Address; Post Office Box 4545 Atlanta. Georgia 30302 Georgia Power L T. Gucwa
!!>e sowhern efectnc stMem Manager Nuclear Safety and Licensing SL-2649 0166C X7GJ17-H510 June 9, 1987 Director, Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Hashington, D. C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS Gentlemen:
Enclosed are the Monthly Operating Reports for Plant Hatch Unit 1,.
Docket Number 50-321, and for Plant Hatch Unit 2, Docket Number 50-366.
These reports - are submitted pursuant to the requirements of Technical Specifications Section 6.9.1.10.
Sincerely,
. T. Gucwa LGB/lc
Enclosures:
1.
Monthly Operating Report for Hatch-1 2.
Monthly Operating Report for Hatch-2 c:
(see next page)
$'h r
i i
- GeorgiaPower A Director, Office of Management and Program Analysis
' June 9,:1987 Page Two c: -Georaia Power Company
,Mr. J. P. O'Reilly, $r. Vice President - Nuclear Operations Mr.' J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS
~
U. S. Nuclear Reaulatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Hatch Licensing Project Manager U. S. Nuclear Reaulatory Commission. Reaion II
'Dr. J. N. Grace, Regional Administrator:
^Mr. P.' Holmes-Ray, Senior Resident Inspector - Hatch
=
i 0166C mm
.