Other: ML20082E320, ML20093M745, ML20093M749, ML20094A277, ML20100C247, ML20101C284, ML20116G049, ML20198A027, ML20204E694, ML20204E706, ML20205B056, ML20205B071, ML20214R856, ML20214R871, ML20235Z262, ML20236H257, ML20262E589, ML20262E593, ML20262E597, ML20262E601, ML20262E606, ML20262E611, ML20262E615, ML20262E619, ML20262E624, ML20262E629, ML20266F484, ML20266F489, ML20266F494, ML20266F498
|
MONTHYEARML20266F4841983-04-28028 April 1983 Ft St Vrain 2500 Kva Xfmr Foundations & Details. Sheet 1 of 2.No Rev Date Project stage: Other ML20266F4891983-05-0202 May 1983 Ft St Vrain 2500 Kva Xfmr Foundations & Details. Sheet 2 of 2 Project stage: Other ML20266F4981983-06-17017 June 1983 480V Transformer Fire Protection Sys Project stage: Other ML20082E3201983-11-0909 November 1983 Responds to Notice of Deviation Noted in IE Insp on 830801-31.Corrective Actions:Concrete Samples Taken at End of Concrete Pump Discharge Line,Addl Lighting Installed & Number of Concrete Vibrators Increased Project stage: Other ML20262E6241984-01-0404 January 1984 Building 10 Walk-Over Structure Roof Plan & Details, as-built Project stage: Other ML20262E6291984-01-0404 January 1984 Building 10 Walkover Structure Steel Elevation, as-built Project stage: Other ML20262E6191984-01-0404 January 1984 Building 10 Walk-Thru Structure Floor Plans, as-built Project stage: Other ML20262E6151984-01-0404 January 1984 Building 10 Steel Framing Plans, as-built Project stage: Other ML20262E6111984-01-0404 January 1984 Building 10 Concrete Sections & Details, as-built.Sheet 3 Project stage: Other ML20262E5971984-01-0505 January 1984 Building 10 Architectural Elevations & Details, as-built Project stage: Other ML20262E6011984-01-0505 January 1984 Building 10 Concrete Floor Plans, as-built Project stage: Other ML20093M7491984-01-22022 January 1984 Rept of Changes,Test & Experiments Not Requiring Prior Commission Approval Per 10CFR50.59(a) for 840101-22 Project stage: Other ML20093M7451984-07-20020 July 1984 Forwards Rept of Changes,Tests & Experiments Not Requiring Prior Commission Approval for 840101-22.Anniversary Date of Rept Changed to Correspond W/Submittal of Annual Update to Fsar.Future Annual Repts Will Cover Jan 23 - Jan 22 Project stage: Other ML20094A2771984-07-25025 July 1984 Responds to NRC 840625 Concerns Re Bldg 10 Const.Concept of Bldg 10 Finalized to Relieve Crowding Conditions & to Accommodate Equipment Replacements Being Planned.Bldg 10 Constitutes Mod Not Requiring Amend to OL Project stage: Other ML20262E5931984-09-21021 September 1984 Building 10 Site Plan & Caisson Details Project stage: Other ML20262E6061984-09-27027 September 1984 Building 10 Concrete Sections & Details, as-built.Sheet 1 Project stage: Other ML20101C2841984-11-29029 November 1984 Forwards Hl Brey for Redistribution Due to Error in Ltr Date.Correct Date Should Be 831101 Project stage: Other ML20100C2471985-03-11011 March 1985 Advises That Attachments A,B,C & D Re Diesel Generator Loading,Battery Sizing,Listing of Encl Drawings & Partial one-line Diagram Forwarded to J Miller,Per 850227 Telcon Request Project stage: Other ML20116G0491985-04-12012 April 1985 Informs That Listed Electrical Sys Drawings Sent to J Miller of NRR for Review,Per 840410 & 12 Requests.Copy of Logic Diagrams Being Prepared by I Ahmed Requested Project stage: Other ML20133A4141985-07-23023 July 1985 Forwards Request for Addl Info Re Const of Bldg 10 & Associated Walkover Structure,Including Engineering Drawings,Walkover Structure Layout & Spatial Relationship W/Surrounding Bldgs Project stage: RAI ML20262E5891985-08-0808 August 1985 Ft St Vrain Plot Plan. Sheet 1 of 1.Drawing Consists of Two Aperture Cards Project stage: Other ML20137C4011985-11-21021 November 1985 Requests Addl Info Re Bldg 10,including CN-1255 & CN-1332 for Sys 92 & CN-1294 for Sys 92/45.For Each Cn,Safety Evaluation & Design Criteria & Analysis Required.Info Requested within 30 Days of Ltr Receipt Project stage: Approval ML20138P0791985-12-17017 December 1985 Forwards Legible Copy of Safety Evaluation Design Criteria & Design Analysis for Change Notices CN-1255,CN-1332, CN-1294 & CN-1391,per NRC 851121 Request for Addl Info. Future Changes to CN-1391 Cover nonsafety-related Battery Project stage: Request ML20205B0711985-12-31031 December 1985 Rev 0 to Evaluation of Structure-Soil-Structure Interaction Effect Between Bldg 10/Walkover Structure & Main Plant Project stage: Other ML20153H0731986-02-19019 February 1986 Safety Evaluation Supporting Bldg 10 & Walkover Structure Design,Per FSAR Requirements for Category 1 Bldgs.Lack of Clearance Between Structures Should Be Addressed by Util Project stage: Approval ML20153H0571986-02-19019 February 1986 Forwards Safety Evaluation Re 850828 Submittal Concerning Bldg 10 & Walkover Structure.Designs Acceptable,Per FSAR Requirements for Category 1 Bldgs.Confirmatory Analysis, Addressing Lack of Clearance Between Structures,Requested Project stage: Approval ML20266F4941986-03-15015 March 1986 Bus Duct Layout and Location of Bus Duct Supports Project stage: Other ML20204A2161986-05-0101 May 1986 Forwards Request for Addl Info Re Bldg 10 Electrical Mods, Including Confirmation That All Class 1E Power,Control & Instrumentation Cables in Bldg 10 Qualified for Environ of 120 F Project stage: RAI ML20197F6541986-05-0707 May 1986 Summary of 860423-24 Meetings W/Util,Ga Technologies & S&W at Site Re Fuel Block Cracking,Bldg 10 Const,Seismic Instrumentation,Pcrv Tendons & Integrated Leak Rate Testing. Attendance List & Viewgraphs Encl Project stage: Meeting ML20198A0271986-05-12012 May 1986 Responds to NRC 860219 Questions Re Bldg 10 & Walkover Structure.Walkover Structure & Bldg 10 Designed Such That Structural Elements Will Not Impact on Adjacent Bldgs During Seismic Event Project stage: Other ML20204E7061986-06-19019 June 1986 Forwards Addl Info Re Bldg 10 Electrical Mods & Essential Power Bus Upgrades,Per NRC 860501 Request Project stage: Other ML20199J0261986-06-25025 June 1986 Requests Addl Info Re Structural Evaluation of Bldg 10 & Walkover Structure,Discussed at 860423 & 24 Meetings.Ltr Inadequately Addressed NRC Concerns Project stage: Meeting ML20204E6941986-07-25025 July 1986 Forwards Resubmittal of Addl Info Re Bldg 10 Electrical Mods & Essential Power Bus Upgrades to Include Attachments Not Received by NRC Project stage: Other ML20205B0561986-07-28028 July 1986 Forwards Addl Info Re Structural Analysis of Bldg 10 & Walkover Structure,Per 860625 Request,Including Seismic Model Used for Bldg & Rev 0 to SAD-481, Evaluation of Structure-Soil-Structure.. Project stage: Other ML20214R8561987-03-0606 March 1987 Forwards EGG-NTA-7607, Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20205R1561987-03-31031 March 1987 Forwards Request for Addl Info Re Seismic Design of Bldg 10, for Nrc/Bnl Review.Site Visit to Review Response to Encl Questions,To Insp Bldg 10 & to Audit Supporting Structural Matl Recommended within 60 Days of Ltr Receipt Project stage: RAI ML20214R8711987-03-31031 March 1987 Technical Evaluation Rept Evaluation of Bldg 10 Electrical Mods Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20215F9631987-05-29029 May 1987 Forwards Response to NRC 870331 Request for Addl Info Re Bldg 10,per 870527 Telcon.Supporting Matl for Bldg 10 Structural Analyses Available in Util Ofc for Review Project stage: Request ML20235Z2621987-07-0808 July 1987 Requests Addl Info from Util Re Bldg 10 Seismic Design, Including Descriptive Matl for PILAY2 Computer Code & Sketches or Drawings Showing Caisson/Slab/Wall Configurations Project stage: Other ML20236H2571987-07-28028 July 1987 Requests Addl Info Re Seismic Design of Bldg 10,based on Util 870529 Submittal.Response Requested within 45 Days of Ltr Date Project stage: Other ML20234D8091987-09-0909 September 1987 Responds to NRC 870728 Request for Addl Info Re Bldg 10, Including Descriptive Matl for PILAY2 Computer Code & Sketches or Drawings of Caisson/Slab/Wall Configurations. Sketch of Configuration & Wall Stiffness Calculation Encl Project stage: Request ML20150C4541988-03-10010 March 1988 Safety Evaluation Concluding That Seismic Analysis Methods for Bldg 10 & Walkover Structure Conservative.Gaps Provided Adequate to Accommodate Relative Motions Which Occur Between Subj Structures & Walkover Structure & Turbine Bldg Project stage: Approval ML20150C4441988-03-10010 March 1988 Forwards Safety Evaluation Re Seismic Analysis of Bldg 10 & Walkover Structure.Seismic Analysis Methods Used Conservative Relative to FSAR & Acceptable Project stage: Approval 1985-07-23
[Table View] |
Safety Evaluation Concluding That Seismic Analysis Methods for Bldg 10 & Walkover Structure Conservative.Gaps Provided Adequate to Accommodate Relative Motions Which Occur Between Subj Structures & Walkover Structure & Turbine Bldg| ML20150C454 |
| Person / Time |
|---|
| Site: |
Fort Saint Vrain  |
|---|
| Issue date: |
03/10/1988 |
|---|
| From: |
Office of Nuclear Reactor Regulation |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML20150C448 |
List: |
|---|
| References |
|---|
| TAC-55287, NUDOCS 8803180258 |
| Download: ML20150C454 (3) |
|
Text
.
\\
/o # ter s
'e UNITED STATES l'
W j
NUCLE AR REGULATORY COMMISSION g
8 WASHINGTON, D. C. 20555
\\...../
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION STRUCTURAL AND GEOSCIENCES BRANCH SEISMIC ANALYSIS OF BUILDING 10 AND WALKOVER STRUCTURE FORT ST. VRAIN NUCLEAR GENERATING STATION DOCKET NO. 50-767
1.0 INTRODUCTION
Public Service Company of Colorado (PSC) added two naw seismic safety-related structures to the Fort St. Vrain Nuclear Generating Station. The Walkover Structure (designed by PSC)gned by Stone and Webster) and the new structures are Building 10 (desi which connects Building 10 and the Turbine Building. Since the methnds used for the seismic analyses perfomed on these structures are different from those contained in the FSAR, a review of the methods used is required.
2.0 EVALUATION Building 10 is a reinforced concrete frame structure 34 feet by 45 feet in plan and about 60 feet high. The building is founded on 6 caissons, each 4 feet in diameter, and extending about 60 feet to bedrock. The soil con-sists of 4 layers each having different shear wsve velocities. The struc-tural model used to perfom the seismic analysis was a stick model with masses lumped at each of the six floor elevations. Soil-structure interaction effects were modeled with springs attached to the foundaton of the structure.
The spring constants were evaluated based upon the stiffnass charactaristics of the caissons. Tha methods in Ref. I ware used to evaluate the stiffnasses of a unifom soil layer. The PILAY2 computer program (Ref. 2) was used to detemine horizontal interaction spring constants using the actual layered soil configuration. Damping values of 7% for the SSE* and 4% for the OBE ware used for all modes. The input to the model consisted of a Reg. Guide 1.60 spectrum anchored at 0.05g and 0.109 for tha OBE and SSE respectively.
Spectral plots are made to compare the ST (damping) OBE R.G.I 60 spectrum for Building 10 with the ?% OBE FSAR spectrum and the 7% SSE R.G.I.60 spectrum for Butiding 10 with the 5% DBE FSAR spectrum. The Building 10 spectra envelope the FSAR spectra in both cases. A time history analysis is perfomed and the results are used to evaluate stresses in the struc-tural members of Butiding 10 and to detemine the response spectra for each mass point in the Building 10 model.
h!R 7
P
2 The Walkover Structure is a braced steel frame structure providing a l
walkway between the various levels of Building 10 and the Turbine Buildir.g.
It is about 19 feet by 6 feet in plan aer' 54 feet tall.
It is founded I
on a reinforced concrete footing varying between 4 feet and 6 feet in thickness. A lumped mass cantilever model was used to evaluate the seismic response of the Walkover Structure. Since the structura is vary light, teil-structura interaction (SSI) effects are emitted and the same seismic input rntions used for Buildirp 10 are input directl" to tha foundation. Reg. Guide 1.60 spectra were used as input to the structural model. These spectra are conservative ralativa to the FSAR desigr spectra and therefore considered to be acceptable.
The affect of structure-structure interaction were specifically considerad.
Since the masses of the new buildings are ima11 and their fundamantal fre-quencias are high as compared with those of the Turbine Puilding, the motion of the Turbine Building would not be affected by the new buildings. However, on the other hand, the Turbine Building response may affect the horizontal motion of Building 10 and the WalkcVer Structure.
Inputting the Turbine Building basement motion directly to the mat of Building 10 and the Walk-over Structure would provida bounds of this effect.
In viaw nf the relative masses of tha structures this approach is acceptable.
The isolated paak E-W DBE displacements cf the three buildings are:
Turbine Puilding 0.096 inches Puilding 10 0.210 inchas Walkover Structure 0.858 inches The maxirum relative displacements between the Turbire Buildtrg/ Walkover Structure and the Building 10/Valkover Structure are 0.954 inches and 1.068 inches respectively. Both of these are less than the available 2 inch gap. Thare is a i inch gap betwean the checker plates and the Turbine Building, and it is shown that the bolts holding the checker plates will fail at ar app 1ted load of 334 pourds per foot which will rot have a significant effect on tha impact on the Turbine Building. This is because of the fact that the load is small, and that tha nature of the bolt shear failure is <uch that once impact occurs the bolts will fail and the checker plates cannot be involved in further impacts.
There is a 1-inch gap betwaen Building 10 and the step en the Walkover Structure. This clearanca exceeds the calculated relative motion of 0.414 inches and is therefore adequate.
3.0 CONCLUSION
Tha seismic analysis methods used for Building 10 and the Walkover Struc-ture have been found to ba conservative relative to the FSAR. The gaps
J i
o "
j provided are found to adaquately accomodate relative motions which occur between these two structures and between the Walkover Structure and the
{
Turbine Building.
References
J. P. Singh, N.C. Donovan, and A.C. Jobsis, "Dasign of Machine Foundation on Piles" ASCE Journals of the Geotechnical 1
Engine **ing Division, August 1977.
2.
Systems Analysis Control and Design Activity (SACDA), itser Manual, PILAY2, A Cortuter Program for Calculation of Stiffness and Damping of Piles in Layered Media. The University of Wettern Ontario, London, Ontario, Canada, January 1981.
Dated: March 10,1988 Principal Contributor:
S. P. Chan 1
i i
i i
l l
i l
i