Informs of Withdrawal of Relief Request from Implied Implementation of ASME Section XI Repairs
ML20079B295
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/29/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9501050394
Download: ML20079B295 (1)


Text

_

Station Support Department 10 CFR 50.56a o

E GY ecco e" <a< c -o ">

Nuclear Group Headquarters '

965 Chesterbrook Boulevard Wayne, PA 19087-5691 December 29,1994 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Withdrawal of Request for Relief From implied 30 implementation of ASME Section XI Repairs (Relief Request No. RR-19)

Dear Sir:

In our letter dated June 3,1994, PECO Energy Company supplied for your review and approval Relief Request No. RR-19 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, Second Ten-Year Interval inservice inspection (ISI) Program. In that letter, PECO Energy Company requested relief from the implied implementation schedule for repairs to Class 3 pressure retalning components in the Emergency Service Water System. Additional information regarding this relief request was also supplied in our letter dated July 6,1994.

Repairs have since been completed to the Emergency Service Water System. Therefore, the need for the relief request no longer exists and we are withdrawing this request for relief.

If you have any questions or require addit!onal information, please do not hesitate to contact us.

Very truly yours, 1,

e G. A. Hunger, Jr.

Director - Ucensing Attachment cc: