Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155G226 + (05000348)
- ML19340B336 + (05000010)
- ML20209B929 + (05000249)
- ML16356A567 + (05000382)
- ML17309A869 + (05000335)
- ML17255A663 + (05000244)
- ML17251A692 + (05000244)
- ML17334B233 + (05000315)
- ML17334A919 + (05000315)
- ML17321A467 + (05000315)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control + (05000250)
- ML11291A099 + (05000390)
- ML101940236 + (05000391)
- ML20003G443 + (05000369)
- ML18144A044 + (05000280)
- ML20029B295 + (05000382)
- ML20076H561 + (05000000)
- ML20098H085 + (05000266)
- ML20096F727 + (05200002)
- ML20112J923 + (05000285)
- ML20135A486 + (05000443)
- ML20247B910 + (05000213)
- ML20234E328 + (05000266)
- ML20215L446 + (05000285)
- L-86-424, Monthly Operating Repts for Sept 1986 + (05000000)
- LD-85-028, Forwards CESSAR FSAR Clarifications Re Safety Injection Sys Delay Time.Changes Identified as Part of Cleanup Effort to Close Out Amend 10 + (05000470)
- LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking + (05200002)
- LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages + (05200002)
- L-87-581, Forwards 1987 Inservice Insp Summary Rept & Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval + (05000250)
- ML17347A353 + (05000250)
- ML19312E146 + (00751)
- ML20050D590 + (00751)
- ML20082S787 + (00751)
- ML20102A597 + (00751)
- ML20072U982 + (00751)
- IA-84-832, Responds to FOIA Request for 1983 Annual Plant Mod,Tests & Experiments & Safety Relief Valve Challenges Repts.Forwards App B Documents.App a Documents Available in Pdr. Availability of Repts Listed by Facility + (00751)
- ML20153C639 + (00751)
- ML20155D540 + (00751)
- L-87-250, Monthly Operating Rept for May 1987 + (00751)
- ML20203K534 + (00751)
- 05000293/LER-1995-006, :on 950614,RCIC Sys Made Inoperable for Troubleshooting Problem W/Turbine Steam Supply Valve.Caused by Either Loosened wire-connector or Failed Auxiliary seal- in Relay.Relay Replaced & Wires Checked + (00751)
- ML20032B825 + (00751)
- ML20052F239 + (00751)
- L-87-581, Forwards 1987 Inservice Insp Summary Rept & Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval + (00751)
- ML20246F729 + (05000354)
- 05000352/LER-1988-005, :on 880219,determined One of Four Reactpr Coolant Leakage Monitoring Sys Inoperable in Violation of Tech Spec 3.4.3.1.Investigation Continuing.Wiring Restored to as-built Condition & Sys Declared Operable + (05000352)
- L-87-581, Forwards 1987 Inservice Insp Summary Rept & Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval + (05000250)
- ML19350A900 + (05000254)
- ML19275G743 + (05000293)
- ML19350C103 + (05000254)
- ML20079K521 + (05000254)
- ML20147C782 + (05000070)
- ML20067A975 + (05000254)
- ML20154C279 + (05000293)
- ML20033A662 + (07000754)
- ML19320A652 + (05000070)
- ML19220C965 + (05000320)
- ML19344B126 + (05000255)
- NRC Generic Letter 79-68, Audit of Small Break LOCA Guidelines + (00206)
- ML20099C985 + (05000255)
- ML20127E184 + (05000295)
- ML20153C766 + (05000456)