AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-250 UNIT Turkov Point 3' DATE May 16, 1983 COMPLETED BY -
P. L. Pace TELEPHONE (3nO qq9_qnq4 MONTH April, 1983 DAY AVERAGE I
P WER LEVEL DAY AVER AGE DAILY POWER LEVEL
-(MWe-Net) 3 683 17 697 2
686 701 is 3
694 702' i,
692 700 4
691 5
21 697 6
692 693 22 691 692 7
3 693-693*
8 2g 692 695 9
33 693 695 10 695 11 27 698 694 12 28 697 13 29 692 696 690 14 39 l
15 698 3,
698 16
- 23 hours - daylight savings INSTRUCTIONS f
On this format. fist the aver. ige daily unit power lesel in MWe Net for each day in the reporting anonth. Compute o the nearest whe!e megawatt.
[
(9/77) i l
l l
8306160638 830516 Th N PDR ADOCK 05000250 R
PDR tf I
I
OPERATING DATA REPORT DOCKET NO 50-250 DATE May 16. 1983 COMPLETED BY P. I_ Pace TELEPHONE (") RR9-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 3 Notes Unit 3 operated at April, 1983 essentially full power for
- 2. Reporting Period:
n e ond.
- 3. Licenwd t hermal Power (MWt):
7900
- 4. Nameplate Rating (Gross MWe):
760 693
- 5. Desipu I lectrical Rating (Net MWe):
680
- 6. Manimum Dependable Capacity (Gross MWe):
646
- 7. Maximuni liependable Capacity (Net MWe):
- 8. If Ch:mps Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
- 9. Power I.evel To Which Restricted,if Any (Net MWe):
- 10. Reason,llor Restrictions.lf Any:
This Month Yr. to Date Cumulative 719 2.879 91.184.6 i1. Hours in Reporting Period 719 2,845.8 63,646.1
- 12. Number Of Hours Reactor Was Critical 0
0 844.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 719 2.765.9 --
62.271 0
0 121.8
- 15. Unit Rewrve Shutdown Hours
- 16. Gross Thermal Energy Ge'nerated (MWH) 1,586,657 6,073,725 127,491,637
- 17. Gross Electrical Energy Generated (MWH) 524a.Z25..
2.002.310 40.664.430 11!. Net Electrical Energy Generated (MWH) 501,085 1,909,682 38',497.234 100.0 96.1 68.3
- 19. Unit Service Factor 100.0 96.1 68.4
- 20. Unit Availability Factor 107.9 102.7 65.4
- 21. Unit Capacity Factor (Using MDC Net) 100.6-95.7 60.9
- '~
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
3.6 5.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
Refueling, Oct. 1, 1983, 2 months.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
}
(9/77)
.. ~~
~.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-750 UNIT NAME Turkey Pnint 1 DATE My IS, 1993 Nuo n o em REPORT MONTH Anril. 1983 TELEPHONE (505) s57-1654 5?
3 Y
Licensee
[*,
f4 Cause & Correctise N'.
Date g
3g g
2g5 Event 7
Q Action to
$~
Ji$!=!
Report
- M Prevent Recurrence e
v 6
Unit 3 had no shutdowns or power reductions greater than 20%.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Ucensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 90ther (Explain) 0161)
E-Operator Training & Ucense Examination Y~ O'**"""*
F-Administratise 5
G-Operational Error (Explain)
- 4. /.o do 44seuc.v..c>
Exhibit I Same Source
('8/77) ll-01her (E xplain )
SU:G1ARY OF OPERATING EXPERIENCE DOCKET NO.
.50-250 Ut{IT
_ Turkey Point 3 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Anril. 19R1 Unit 3 operated at assentially full
- power for the entire month.
Major safety related maintenance activities included:
A boric acid heat tr' acing circuit was adjusted.
An AFW supply valve operator was repaired.
An RPS relay rack was repaired.
A boric acid supply valve was repaired.
A reactor excore instrumentation drawer was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
O f
I
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-251 UNIT Turkey Point 4 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE _(305) 552-3654 MONTH April, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
-(MWa-Net) 1 37 y
18 3
19 4
20 g
.g 6
22 7
g 8
9 10
.i 26 3g 3,
32 28 13 29 14 30 IS 31 l
16 i
INSTRUCTIONS l
On this format.hst the aver.rge daily unit power lesel in MWe Net for cach day in the reporting month. Compute to the nearest whole rwgaware.
l (9/77)
I
OPERATING DATA REPORT DOCKET NO.
50-251 DAT E _]ia v 16. 1983 COMPLETED BY P_
I_
Pace TELEPHONE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
Turkey Point 4 Notes Steam Generator Repair
- 2. Reporting Period:
April, 1983 Program in progress 2200
- 3. Licenml thermalPower(MWt):
- 4. Nameplate Rating (Gross MWe):
760 693
- 5. Design i lectrical Rating (Net MWe):
680
- 6. Maulmum liependable Capacity (Gross MWe):
646
- 7. Maximum liependable Capacity (Net MWe):
- 8. If Change Occur in Capacity Ratings (Items Number 3 Through 7) Since Lart Report. Give Reasons:
- 9. Power I evel To Which Restricted. If Any (Net MWe):
- 10. Reasons l'or (testrictions. If Any:
This Month Yr.-to-Date Cumulative 719 2.879 84.912
~
- 11. Hours in Iteporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 59,855.3 0
0 166.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 0
0 57.896 0
0 31.2
- 15. Unit Rewrve Shutdown l{ours l
- 16. Gross Thermal Energy Generated (MWH) 0 0
121,918.244 O
0 38,775,512
- 17. Gross Electrical Energy Generated (MWHI
-1,927_,
-5,449 36,725,173
- 18. Net Electrical Energy Generated (MWH) 0 0
68.2
- 19. Unit Service Factor 0
0 68.2
- 20. Unit Availability Factor 0
0 67.0
- 21. Unit Capacity Factor (Using MDC Net) 0 0
62.4
- 22. Unit Capacity Factor (Using DER Net)
U U
3.9
- 23. Unit Forced OutaseRate
[
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 16, 1983
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
l-(9/77) l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-251 UNIT NAME Turkev Point 4
^
DATE Ma y 16. 1981 REPORT MONTH April. 1983 COMPLETED BY D I Daca TELEPHONE f't45) RR?_36Ra 5?
3 h Ei Licensee 5%
k%
Cause & Corrective No.
Date g
~g g
255 Event u?
l Action to jU
$5 5
jig Report a rE 0 Prevent Recurrence
.6 18 821009 S
719 H
4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.
I 2
3 4
F: Forced Reason :
Method:
Exhibit G-Instructions S, Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event ReporI(LER) File (NUREG-D. Regulatory Restriction gother (Explain) 0161)
E-Operator Training & Ucense Examination F-Administ raine 5
G-Operational Error (E splainI
- c. / ao 44evea..cl Exhibit I - Same Source 19/77) llother iExplain)
SU?iMARY OF OPEPATING EXPERIENCE DOCKET HO.
50-251 UNIT Turkey Point 4 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (306) 552-3654 REPORT tiONTH
_ anH1_ 1983 Unit I continued the Steam Generator Repair Program.
Other major safety related maintenance activities included:
Three boric acid heat tracing circuits were repaired or adjusted.
A pressurizer pressure transmitter was replaced.
A steam turbine pressure transmitter was replaced.
A thrust bearing on a High Pressure Safety Injection Pump was repaired.
Reactor core reloaded including 36 new fuel assemblies.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.
O
_.... ~
.1 AVERAGE DAILY UNIT POhTR LEVEL i
1
(;
Sb-335 DOCKET NO.
St. Lucie 1 UNIT DATE May 16. 1983 COMPLETED BY P. L. Pace
.s,
TELEPHONE (305b 552-3'654
-. j -.
MONTH Anril. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net)
-(MWe-Neti 37
,1 2
gg 3
39 4
20
~~~
i 5
21 6
22 y
=
8 24 9
25 10 t
26
.Il 27 12 2g 13 29 14~
30 15 33 1
INSTRUCTIONS On this format. list the average daily unit power leyl in MWe-Net for ea:h day in the reporting ::wnsh. Compute to the nearest whole megawatt.
(9/77)
.m--.-
A OPERATING DATA REPORT DOCKET NO.
50-335 DATE May 16,1983 COMPLETED BY P_ I_ Pace TELEP110NE (305) 552-3654 OPERATING STATUS
- 1. Unit Name:
St. Lucie 1 Notes Unit I remained out of
- 2. Reporting Period:
April, 1983 service for refueling and scheduled maintenance.
- 3. Licenwd t hermal Power (MWt):
7700 890
- 4. Nameplate Rating (Gross MWe):
830
- 5. Design Ilectrical Rating (Net MWe):
862
- 6. Maximum Dependable Capacity (Gross MWe):
817
- 7. Maximiem liependable Capacity (Net MWe):
- 8. If Chan, Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
- 9. Power f.evel To Which Restricted,if Any (Net MWe):
I'
- 10. Reasons I:or Restrictions.lf Any:
This Month Yr to-Date Cumulative 719' 2.879 55,727
- 11. Ilours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
1,366.9 44,466.1 0
0 205.3
- 13. Reactor Reserve Shutdown Hours 0
1,350.9 43,b/b.Z
- 14. Hours Cenerator On-Line U
U av.a j'
'15. Unit Rewrve Shutdown l{ours 0
3,532,422 108,667,938 i
- 16. Gross Thermal Energy Generated (MWH) 0 1,160,280 35,373,875
- 17. Gross Electrical Energy Generated (MWH)
-2,T85_
1,094,349 33;358,540
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0
46.9 78.2 0
46.9 78.3 l
<20. Unit Availability Factor 0
46.5 76.3 l.
- 21. Unit Capacity Factor (Usin;MDC Net) l
~ ' 22.' Unit'C$pacity Factor (Using DER Net) 0 45.8 74.1 O
1.1
'4.6
- 23. Unit Fowed Outage Rgte
/
- 24. Shutdnwns Schedu;-d Over Next 6 Months (Type.Date.and Duration of Each):
1
^
_ 2S. If Shut Down At End,0f Report Period. Estimated Date of Startup:
mid-July, 1983-
- 26. Units in Teu Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMYERCI AL OPERATION
,3 1
l9[77 )
3
/
,z, p ' *%
l
4
- 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME 5t. Lucie 1 DATE Ma y 16. 1983 REPORT MONTH Apri1, 1983 COMPLETED BY P-I Pa cp TELEPHONE (105) 557_3654 n
e.
'=5 E
=
c.
53 5
55'd Licensee E*
g *.
Cause & Coirective
-o y" -
gId'C C;
e?
a 2 3 oc Event u?
- n. 3 Action to
$3 5
j15j Repori e JE0 O
preeent Recurrence d
3 830226 S
719 C
4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S. Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 9-Other (Explain) 0161) 1 -Operator Training & License Examination F Administrative p
5 G-Operational Error (ExplainI c _ /.e ao sevc.3..et Exhibit I - Same Source (9/77 )
iI-Other (E splain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit 1 DATE May 16, 1983 P. L. Pace COMPLETED BY TELEPHONE (305) 552-3654 REPORT MONTH Ancil 1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.
Major safety related maintenance included:
The safe end was removed from the A Feedwater nozzle.
AFW pump ramp generators were repaired.
A pressurizer support was repaired.
Grounded RTD's in a safeguards cabinet were replaced.
A pressurizer level transmitter was adjusted.
A trip status panel relay was repaired.
See correspondence between FPL and NRC for information concerning the thermal shield.
The ILRT was conducted.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.
k
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 2 DATE May: 16', _1983 COMPLETED BY P' L. Pace TELEPHONE 1305) 552-3654 MONTH April, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe Net)
~
-(MWe-Net)
I g7 2
18 3
g9
~~~
~
'4 20 S
y, 6
g 7
23 8
24 9
33 10 26 11 yy 12 28
~-
~
13 39
~~
14' 30 15 3,
16
- Operating license issued April 6,1983 l
INSTRUCTIONS i
l On this forinat list the average daily unit power leselin MWe Net for ea:h day in the reporting inonth. Compute to the nearest whole inegawart.
i (9/77)
I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-389 UNIT NAME St. Lucie 2 DATE Ma " 16-1 QR'4 NLETED W D,
t_
Dm REPORT MONT11 April. 1983 TELEPHONE l3051 552-3654 t
% -a =;-
5
=
es e
5S l'."5
' 3, S"*u 2
E 2
Cause & Corrective No.
Date g
3g g
jg5 Event u '2 f'3 Action to
$E j g,i g Report a 50 Prevent Recurrence 6
NA 830406 NA NA B
NA NA NA NA Unit 2 received operating license and began fuel loading and pre-operational testing.
I 2
3 4
F. Forced Reason:
Method:
Exhibit G Instructions S Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data li-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Ad minist rative 5
G-Operational Er ror ( E splain) 4-Aoao 4 4 eve.v..cl Exhibit I - Same Source 19/77)
Il-01her (E splain)
=
OPERATING DATA REPORT DOCKET NO. 50-389 DATE May 16, 1983 COMPLETED BY p I-Pace TELEP110NE (3051 552-3654 OPERATING STATUS St. Lucie Unit 2 Notes Unit 2 received an
- f. Unit N4me:
operating license on April 6. 1983 to April 30, 1983
- 2. Reporting Period:
April 6,1983.
- 3. Licemed fhermal Power (MWI):
5% of 2560 850
- 4. Namepl41s Rating (Gross MWe):
- 5. Deslan llectrical Rating (Net MWe): aDDroximately 805 to be determinec
- 6. Maximum Dependable Capacity (Gross MWe): to be determinec
- 7. Maximum llependable Capacity (Net MWe):
- 8. If Ch mv. Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:
first report Net MWe approximately 38
- 9. PowerlevelToWhich Restricted.If Any(License): condition - plant in startup phase.
- 10. Reasons l~or Restrictions. lf Any:
This Month Yr to-Date Cumulative
i 600
- 11. Hours in Reporting Period 0
- 12. Number Of Hours Reactor Was Critical 0
- 13. Reactor Reserve Shutdown Hours U
- 14. Hours Generator On.Line
- 15. Unit Rewrve Shutdown Hours 0
- 16. Gross Thermal Energy Generated (MWH) 0
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor NA
- 21. Unit Capacity Factor (Using MDC Net)
NA
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
- 24. Shutdowns Scheduled Over Next 6 MonthsIType.Date,and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial operation):
Forecast Achiesed 5/27/83 INITIAL CRITICALITY INITIAL ELECTRICITY Juno. 1983 COMMERCI AL OPERATION late July, 1983 19/77) w
I
[ *
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit'2 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH April,1983 St. Lucie Unit 2 received an operating license and commenced fuel loading and pre-operational testing.
In accordance with the requirements of NUREG-0737 Item II.R.3.3,. and Technical Specification 6.9.1.6, there were no challenges to PORV's or safety valves during the report month.
e
m%.
P.O. 80X 529100 MI AMI, F L 33152 FLORIDA POWER & LIGHT COMPANY May 16, 1983 PNS-LI-353 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Attached are the April, 1983, Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. 1 and 2.
Ver tr ly yours, J
W. Williams, Jr.
Vice President Nuclear Energy JWW/PLP/mpc Attachment cc: