AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 UNIT Turkov Point 3' DATE May 16, 1983 COMPLETED BY -

P. L. Pace TELEPHONE (3nO qq9_qnq4 MONTH April, 1983 DAY AVERAGE I

P WER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net) 3 683 17 697 2

686 701 is 3

694 702' i,

692 700 4

691 5

21 697 6

692 693 22 691 692 7

3 693-693*

8 2g 692 695 9

33 693 695 10 695 11 27 698 694 12 28 697 13 29 692 696 690 14 39 l

15 698 3,

698 16

  • 23 hours - daylight savings INSTRUCTIONS f

On this format. fist the aver. ige daily unit power lesel in MWe Net for each day in the reporting anonth. Compute o the nearest whe!e megawatt.

[

(9/77) i l

l l

8306160638 830516 Th N PDR ADOCK 05000250 R

PDR tf I

I

OPERATING DATA REPORT DOCKET NO 50-250 DATE May 16. 1983 COMPLETED BY P. I_ Pace TELEPHONE (") RR9-3654 OPERATING STATUS

1. Unit Name:

Turkey Point 3 Notes Unit 3 operated at April, 1983 essentially full power for

2. Reporting Period:

n e ond.

3. Licenwd t hermal Power (MWt):

7900

4. Nameplate Rating (Gross MWe):

760 693

5. Desipu I lectrical Rating (Net MWe):

680

6. Manimum Dependable Capacity (Gross MWe):

646

7. Maximuni liependable Capacity (Net MWe):
8. If Ch:mps Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. Power I.evel To Which Restricted,if Any (Net MWe):
10. Reason,llor Restrictions.lf Any:

This Month Yr. to Date Cumulative 719 2.879 91.184.6 i1. Hours in Reporting Period 719 2,845.8 63,646.1

12. Number Of Hours Reactor Was Critical 0

0 844.4

13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 719 2.765.9 --

62.271 0

0 121.8

15. Unit Rewrve Shutdown Hours
16. Gross Thermal Energy Ge'nerated (MWH) 1,586,657 6,073,725 127,491,637
17. Gross Electrical Energy Generated (MWH) 524a.Z25..

2.002.310 40.664.430 11!. Net Electrical Energy Generated (MWH) 501,085 1,909,682 38',497.234 100.0 96.1 68.3

19. Unit Service Factor 100.0 96.1 68.4
20. Unit Availability Factor 107.9 102.7 65.4
21. Unit Capacity Factor (Using MDC Net) 100.6-95.7 60.9
  • '~
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

3.6 5.6

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

Refueling, Oct. 1, 1983, 2 months.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

}

(9/77)

.. ~~

~.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-750 UNIT NAME Turkey Pnint 1 DATE My IS, 1993 Nuo n o em REPORT MONTH Anril. 1983 TELEPHONE (505) s57-1654 5?

3 Y

Licensee

[*,

f4 Cause & Correctise N'.

Date g

3g g

2g5 Event 7

Q Action to

$~

Ji$!=!

Report

  • M Prevent Recurrence e

v 6

Unit 3 had no shutdowns or power reductions greater than 20%.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Ucensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 90ther (Explain) 0161)

E-Operator Training & Ucense Examination Y~ O'**"""*

F-Administratise 5

G-Operational Error (Explain)

4. /.o do 44seuc.v..c>

Exhibit I Same Source

('8/77) ll-01her (E xplain )

SU:G1ARY OF OPERATING EXPERIENCE DOCKET NO.

.50-250 Ut{IT

_ Turkey Point 3 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH Anril. 19R1 Unit 3 operated at assentially full

  • power for the entire month.

Major safety related maintenance activities included:

A boric acid heat tr' acing circuit was adjusted.

An AFW supply valve operator was repaired.

An RPS relay rack was repaired.

A boric acid supply valve was repaired.

A reactor excore instrumentation drawer was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

O f

I

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-251 UNIT Turkey Point 4 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE _(305) 552-3654 MONTH April, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

-(MWa-Net) 1 37 y

18 3

19 4

20 g

.g 6

22 7

g 8

9 10

.i 26 3g 3,

32 28 13 29 14 30 IS 31 l

16 i

INSTRUCTIONS l

On this format.hst the aver.rge daily unit power lesel in MWe Net for cach day in the reporting month. Compute to the nearest whole rwgaware.

l (9/77)

I

OPERATING DATA REPORT DOCKET NO.

50-251 DAT E _]ia v 16. 1983 COMPLETED BY P_

I_

Pace TELEPHONE (305) 552-3654 OPERATING STATUS

1. Unit Name:

Turkey Point 4 Notes Steam Generator Repair

2. Reporting Period:

April, 1983 Program in progress 2200

3. Licenml thermalPower(MWt):
4. Nameplate Rating (Gross MWe):

760 693

5. Design i lectrical Rating (Net MWe):

680

6. Maulmum liependable Capacity (Gross MWe):

646

7. Maximum liependable Capacity (Net MWe):
8. If Change Occur in Capacity Ratings (Items Number 3 Through 7) Since Lart Report. Give Reasons:
9. Power I evel To Which Restricted. If Any (Net MWe):
10. Reasons l'or (testrictions. If Any:

This Month Yr.-to-Date Cumulative 719 2.879 84.912

~

11. Hours in Iteporting Period
12. Number Of Hours Reactor Was Critical 0

0 59,855.3 0

0 166.6

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0

0 57.896 0

0 31.2

15. Unit Rewrve Shutdown l{ours l
16. Gross Thermal Energy Generated (MWH) 0 0

121,918.244 O

0 38,775,512

17. Gross Electrical Energy Generated (MWHI

-1,927_,

-5,449 36,725,173

18. Net Electrical Energy Generated (MWH) 0 0

68.2

19. Unit Service Factor 0

0 68.2

20. Unit Availability Factor 0

0 67.0

21. Unit Capacity Factor (Using MDC Net) 0 0

62.4

22. Unit Capacity Factor (Using DER Net)

U U

3.9

23. Unit Forced OutaseRate

[

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:

l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 16, 1983

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed l

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

l-(9/77) l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-251 UNIT NAME Turkev Point 4

^

DATE Ma y 16. 1981 REPORT MONTH April. 1983 COMPLETED BY D I Daca TELEPHONE f't45) RR?_36Ra 5?

3 h Ei Licensee 5%

k%

Cause & Corrective No.

Date g

~g g

255 Event u?

l Action to jU

$5 5

jig Report a rE 0 Prevent Recurrence

.6 18 821009 S

719 H

4 HB HTEXCH Steam Generator Repair Program in accordance with Paragraph III.H. of the Unit 4 Facility Operating License DPR 41.

I 2

3 4

F: Forced Reason :

Method:

Exhibit G-Instructions S, Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event ReporI(LER) File (NUREG-D. Regulatory Restriction gother (Explain) 0161)

E-Operator Training & Ucense Examination F-Administ raine 5

G-Operational Error (E splainI

c. / ao 44evea..cl Exhibit I - Same Source 19/77) llother iExplain)

SU?iMARY OF OPEPATING EXPERIENCE DOCKET HO.

50-251 UNIT Turkey Point 4 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (306) 552-3654 REPORT tiONTH

_ anH1_ 1983 Unit I continued the Steam Generator Repair Program.

Other major safety related maintenance activities included:

Three boric acid heat tracing circuits were repaired or adjusted.

A pressurizer pressure transmitter was replaced.

A steam turbine pressure transmitter was replaced.

A thrust bearing on a High Pressure Safety Injection Pump was repaired.

Reactor core reloaded including 36 new fuel assemblies.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional in formation.

O

_.... ~

.1 AVERAGE DAILY UNIT POhTR LEVEL i

1

(;

Sb-335 DOCKET NO.

St. Lucie 1 UNIT DATE May 16. 1983 COMPLETED BY P. L. Pace

.s,

TELEPHONE (305b 552-3'654

-. j -.

MONTH Anril. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe-Net)

-(MWe-Neti 37

,1 2

gg 3

39 4

20

~~~

i 5

21 6

22 y

=

8 24 9

25 10 t

26

.Il 27 12 2g 13 29 14~

30 15 33 1

INSTRUCTIONS On this format. list the average daily unit power leyl in MWe-Net for ea:h day in the reporting ::wnsh. Compute to the nearest whole megawatt.

(9/77)

.m--.-

A OPERATING DATA REPORT DOCKET NO.

50-335 DATE May 16,1983 COMPLETED BY P_ I_ Pace TELEP110NE (305) 552-3654 OPERATING STATUS

1. Unit Name:

St. Lucie 1 Notes Unit I remained out of

2. Reporting Period:

April, 1983 service for refueling and scheduled maintenance.

3. Licenwd t hermal Power (MWt):

7700 890

4. Nameplate Rating (Gross MWe):

830

5. Design Ilectrical Rating (Net MWe):

862

6. Maximum Dependable Capacity (Gross MWe):

817

7. Maximiem liependable Capacity (Net MWe):
8. If Chan, Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. Power f.evel To Which Restricted,if Any (Net MWe):

I'

10. Reasons I:or Restrictions.lf Any:

This Month Yr to-Date Cumulative 719' 2.879 55,727

11. Ilours In Reporting Period
12. Number Of Hours Reactor Was Critical 0

1,366.9 44,466.1 0

0 205.3

13. Reactor Reserve Shutdown Hours 0

1,350.9 43,b/b.Z

14. Hours Cenerator On-Line U

U av.a j'

'15. Unit Rewrve Shutdown l{ours 0

3,532,422 108,667,938 i

16. Gross Thermal Energy Generated (MWH) 0 1,160,280 35,373,875
17. Gross Electrical Energy Generated (MWH)

-2,T85_

1,094,349 33;358,540

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0

46.9 78.2 0

46.9 78.3 l

<20. Unit Availability Factor 0

46.5 76.3 l.

21. Unit Capacity Factor (Usin;MDC Net) l

~ ' 22.' Unit'C$pacity Factor (Using DER Net) 0 45.8 74.1 O

1.1

'4.6

23. Unit Fowed Outage Rgte

/

24. Shutdnwns Schedu;-d Over Next 6 Months (Type.Date.and Duration of Each):

1

^

_ 2S. If Shut Down At End,0f Report Period. Estimated Date of Startup:

mid-July, 1983-

26. Units in Teu Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY COMYERCI AL OPERATION

,3 1

l9[77 )

3

/

,z, p ' *%

l

4

50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME 5t. Lucie 1 DATE Ma y 16. 1983 REPORT MONTH Apri1, 1983 COMPLETED BY P-I Pa cp TELEPHONE (105) 557_3654 n

e.

'=5 E

=

c.

53 5

55'd Licensee E*

g *.

Cause & Coirective

-o y" -

gId'C C;

e?

a 2 3 oc Event u?

n. 3 Action to

$3 5

j15j Repori e JE0 O

preeent Recurrence d

3 830226 S

719 C

4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S. Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 9-Other (Explain) 0161) 1 -Operator Training & License Examination F Administrative p

5 G-Operational Error (ExplainI c _ /.e ao sevc.3..et Exhibit I - Same Source (9/77 )

iI-Other (E splain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Unit 1 DATE May 16, 1983 P. L. Pace COMPLETED BY TELEPHONE (305) 552-3654 REPORT MONTH Ancil 1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.

Major safety related maintenance included:

The safe end was removed from the A Feedwater nozzle.

AFW pump ramp generators were repaired.

A pressurizer support was repaired.

Grounded RTD's in a safeguards cabinet were replaced.

A pressurizer level transmitter was adjusted.

A trip status panel relay was repaired.

See correspondence between FPL and NRC for information concerning the thermal shield.

The ILRT was conducted.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Item II.k.3.3, there were no challenges to PORV or safety valves during the report month.

k

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 2 DATE May: 16', _1983 COMPLETED BY P' L. Pace TELEPHONE 1305) 552-3654 MONTH April, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe Net)

~

-(MWe-Net)

I g7 2

18 3

g9

~~~

~

'4 20 S

y, 6

g 7

23 8

24 9

33 10 26 11 yy 12 28

~-

~

13 39

~~

14' 30 15 3,

16

  • Operating license issued April 6,1983 l

INSTRUCTIONS i

l On this forinat list the average daily unit power leselin MWe Net for ea:h day in the reporting inonth. Compute to the nearest whole inegawart.

i (9/77)

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-389 UNIT NAME St. Lucie 2 DATE Ma " 16-1 QR'4 NLETED W D,

t_

Dm REPORT MONT11 April. 1983 TELEPHONE l3051 552-3654 t

% -a =;-

5

=

es e

5S l'."5

' 3, S"*u 2

E 2

Cause & Corrective No.

Date g

3g g

jg5 Event u '2 f'3 Action to

$E j g,i g Report a 50 Prevent Recurrence 6

NA 830406 NA NA B

NA NA NA NA Unit 2 received operating license and began fuel loading and pre-operational testing.

I 2

3 4

F. Forced Reason:

Method:

Exhibit G Instructions S Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data li-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Ad minist rative 5

G-Operational Er ror ( E splain) 4-Aoao 4 4 eve.v..cl Exhibit I - Same Source 19/77)

Il-01her (E splain)

=

OPERATING DATA REPORT DOCKET NO. 50-389 DATE May 16, 1983 COMPLETED BY p I-Pace TELEP110NE (3051 552-3654 OPERATING STATUS St. Lucie Unit 2 Notes Unit 2 received an

f. Unit N4me:

operating license on April 6. 1983 to April 30, 1983

2. Reporting Period:

April 6,1983.

3. Licemed fhermal Power (MWI):

5% of 2560 850

4. Namepl41s Rating (Gross MWe):
5. Deslan llectrical Rating (Net MWe): aDDroximately 805 to be determinec
6. Maximum Dependable Capacity (Gross MWe): to be determinec
7. Maximum llependable Capacity (Net MWe):
8. If Ch mv. Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Gise Reasons:

first report Net MWe approximately 38

9. PowerlevelToWhich Restricted.If Any(License): condition - plant in startup phase.
10. Reasons l~or Restrictions. lf Any:

This Month Yr to-Date Cumulative

i 600

11. Hours in Reporting Period 0
12. Number Of Hours Reactor Was Critical 0
13. Reactor Reserve Shutdown Hours U
14. Hours Generator On.Line
15. Unit Rewrve Shutdown Hours 0
16. Gross Thermal Energy Generated (MWH) 0
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor NA
21. Unit Capacity Factor (Using MDC Net)

NA

22. Unit Capacity Factor (Using DER Net)

- 23. Unit Forced Outage Rate 0

24. Shutdowns Scheduled Over Next 6 MonthsIType.Date,and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial operation):

Forecast Achiesed 5/27/83 INITIAL CRITICALITY INITIAL ELECTRICITY Juno. 1983 COMMERCI AL OPERATION late July, 1983 19/77) w

I

[ *

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit'2 DATE May 16, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH April,1983 St. Lucie Unit 2 received an operating license and commenced fuel loading and pre-operational testing.

In accordance with the requirements of NUREG-0737 Item II.R.3.3,. and Technical Specification 6.9.1.6, there were no challenges to PORV's or safety valves during the report month.

e

m%.

P.O. 80X 529100 MI AMI, F L 33152 FLORIDA POWER & LIGHT COMPANY May 16, 1983 PNS-LI-353 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Attached are the April, 1983, Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. 1 and 2.

Ver tr ly yours, J

W. Williams, Jr.

Vice President Nuclear Energy JWW/PLP/mpc Attachment cc:

J. P. O'Reilly, Region II slI PEOPLE.. SERVING PEOPLE

, - - -