ML20082S787
ML20082S787 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point, 05000000 |
Issue date: | 11/15/1983 |
From: | Grant N, Williams J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
References | |
PNS-LI-83-706, NUDOCS 8312150001 | |
Download: ML20082S787 (17) | |
Text
-
.s
- -., AVERAGE DAILY UNIT POWIR LEVEL DOCKET NO. 50-250 UNIT Turkey Point Unit #3 DATE 11-15_83 COMPLETED BY N.W. Grant TELEPilONE (305b52-3675 MONTH October, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net! -(MWe-Net)
I 489 l .~
e 2 ___
gg ___
3 gg 4 --- '
20 ---
-5 ___
3, 6 22 7
8 ---
24 9
" ' " ~~~
10' 26 33 y.,
gy ___ ___
13 -__
29 14 30
"- ~~~
15 33 I6 INSTRUCTIONS
- On this fonnat, hst the average daily unit power lesel in MWe-Net for each day in the reporting month. Compute to the nearen whole megawart.
i . (9/771 8312150001 831115 PDR ADOCK 05000250 R PDR I
y ,
OPERATING DATA REPORT
. DOCKET NO. 50-250 _
DATE .11-1b-63 COMPLETED llY _N.W. E nt TELEPHONE (3051552-3675 OPERATING STATUS
- 1. Unit Name: Turkey Point Unit #3 (i$ 3 was removed from serv-
- 2. Reporting Period: Or tnher- 19R1 ice for scheduled refueling -
- 3. Licensed Thermal Power (MWt): 2200 and maintenance
- 4. Nameplate Rating (Gross MWe): 760 S. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Cross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capcity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to.Date Cumulative 11.- Hours In Reporting Pec.od 745 7296 95601.6-
- 12. Number Of Hours Reactor Was Critical 22.9 6505.9 66306.2
- 13. Reactor Reserve Shutdown Hours n n paa a'
- 14. Hours Generator On-Line ?? 7 6416 R 66471 0
- 13. Unit Reserve Shutdown Hours '
0 0 171_R
- 16. Gross Thern al Energy Ge'nerated (MWil) 40693 14370680 1-35488592- -
- 17. Gross Electrical Energy Generated (MWH) 12485 ,_,
4584575 43210565
- 18. Net Electrical Energy Generated (MWH) 9318 4330934 40918486
- 19. Unit Service Factor 3.0 87.9 69.0
- 20. Unit Availability Factor 10- R7 Q A0 1 j 21. Unit Capacity Factor (Using MDC Net) - 1.9 90_4 6 6.2.___
l 22. Unit Capacity Factor (Using DER Net) 1.8 85.7 61.8 l 23. Unit Forced Outage Rate 0 2.0 5.4 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
i i
- 25. If Shut Down At End OiReport Period. Estimated Date of Startup: December ( 1983
- 26. Units In Test Status (Prior to Commercial Operation): Forecast As hined j INITIA L CRITICALI fY _
! INITIAL tiLECTRICITY _ _ _ _
COMMERCIAL OPERATION __
l PJ/771
s .
O' UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME Turkov Point Unit #3 ,
DATE 11 19 M COMPLETED BY uu crw+
REPORT MONTH October.1983 TELEPHONE fi0$)$ri2 $675 e.
- E c
, .! ? 3j f .5 7;: j Licensee ,E*, E" Cause & Corrective No. Date g gg ,3 g 5 - Event p f",g Action to
$~ E j@g Report # mO g .
Prevent Recurrence O
i .
10 831001 S 722.3 C :1 RC FUELXX Unit removed from Service for refueling and scheduled maintenance 9
1 2 3 4 F Forced Reason: Method: Exhibit G Instructions S Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data n-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3. Automatic Scram. Event Report tLER) File (NUREC-D Regulatory Restrictinn 9-Other (Explain) 016!)
Il Cperator Training & License Examination
. F Administrative 5 G-Operational lirror i F splain i s- /.oao 4 4ouc.,..,1 Exhibit I Same Source 19/77) li Other l Explain)
L
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point 3' DATE Nn v om hp r 18i . 14M COMPLETED BY P.L. Pace TELEPHONE 305/552-3654 REPORT liONTH October,1983 Unit 3 was removed from service for refueling and scheduled maintenance.
Major-safety related maintenance activities included:
A primary water makeup pump was overhauled A containment spray pump was switched with one for Unit 4 Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. . Refer to correspondence between FPL and NRC for additional infdrmation.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turleay pnint 'Init #4 .
DATE 11 15 R1 COMPLETED BY N.W. Grant TELEPilONE I M I GR2 167R MONTH October, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL
' IMWe Net) . (MWe-Net I
- 684 gj 674 2 AR1 18 679 3 678 39 679 4 681 20 67R 679 S 21 675 6 67R 22 678 7 676 23 654 8 676 24 679 9 639 25 679 10 618 26 6R5
-11 681 27 689 12 237 28 685
~"
13 29 6RQ
~~~
14 30 689 15 ---
31 689 16 66 INSTRUCTIONS On this forsnar.hs the average daily unit power lesel in MWe Net for each day rn the repening inonth. Compute to the nearest whole megawart.
19/77)
g..
OPERATING DATA REPORT DOCKET NO. 50-251 DATE .11-15-83 COMPLETED ilY N_W_ Grant TELEPHONE (305)RR2-3675 OPERATING STATUS Turkey Point Unit'#4 Notes
- 1. Unit Name: Unit #4 operated at power
- 2. Reporting Period: October 1983 except as noted in the unit
- 3. Licensed Thermal Power (MW ): 2200 shutdowns and power reductions
- 4. Nameplate Rating (Gross MWe): _ 760 report.
S. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 700
. 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. . Reasons For Restrictions,If Any:
This Month Yr.-to-Date Cumulative
- 11; Hours in Reporting Period 745 7296 89329
- 12. Number Of Hours Reactor Was Critical 644.7 3601./ 634b/.0
- 13. Reactor Reserve Shutdown Hours 'O O 166.6'
- 14. Hours Generator on-Line 641.0 3404.8 61300.8
- 15. Unit Reserve Shutdown 1(ours 0 0 31.2
- 16. Gross Thermal Energy Generated (MWif) 1397520 7265165 129183409 .
17/ Gross Electrical Energy Generated (MWH) 451655 2312925 41088437
- 18. Net Electrical Energy Generated (MWH) '
a2R11R 91R797a 3R4i7247
- 19. Unit Service Factor A6 0 46.7 68.6
- 20. Unit Availability Factor 86.0 46.7 68.7 l 21. Unit Capacity Factor (Using MDC Net) - 86.3 45.7 67.3 l 22. Unit Capacity Factor (Using DER Net) 82.9 43.3 62.9' I 23. Unit Forced Outage Rate 14.0 7.3 4.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY _
INITIA L ELECTRICITY __
COMMERCIAL OPERATION __
01/77, t
, .,p - - - - , , - , , , , - - , -. . , - - .,-,,i-g- - - , . - . . - , . - - - -w- *
,P UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-751 UNIT NAME "urkav Pnint #4 DATE .1 - 15 ~-8 3 COMPLETED 8Y N W Grant REPORT MONTH nctn hor 1o83 TELEPHONE 305/552-3654 e.
- E c
- , .!E 3 h .h 5 Licensee [% . Cause & Corrective No. Dale i 3g s 2i5 Event g $"?
p0 Action to H
$E 5 jig Report a mV g Prevent Recurrence 6
,18 831012 F 104.0 A 1 251-83-18 CF ELECON Unit removed from service to repair electrical connections to residual heat removal pump. motor. The unit then returned to service. -
1 2 3 4 f Forced Reason: Method: Exhibit G. Instructions S Scheduled A Lyuipment Failure (Explain) l Manual for Preparation of Data Il Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report iLER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)
E-Operator 1 raining & License Examination
, F Administrative p ,
5 G-Operational Error ( F xplain) 4. 4oao atov<a..d Exhibit I Same Source 19/77) Il-Ot her ( Explain)
[.' , ,
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 DATE November 15, 1983 COMPLETED BY p. L. Pace TELEPHONE 305/552-3654 REPORT MONTH October, 1983 Unit 4 operated at power, see the Unit Shutdowns and Power Reductions Report for outage details.
Major safety related main'tenance activities included:
A low pressure safety injection pump was repaired.
A containment spray pump was repaired Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
. Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
a 6
1 p.. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St. Lucie Unit #1 DATE 11-15-83 COMPLETED 1:Y N.W. Grant TELEPilONE (3051552-3675
- MONTH Octo ber, 1983 -
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net) . (MWe-Net )
1 1- ---
3 gg 3
4 ---
20 ---
5 21 6 ---
22 ---
7 23 8 24 9 ---
25 ---
10 26 gg , ---
7 12 ---
28 ---
13 29 g -- ---
16 INSTRUCTIONS On this format hst the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771
]
4 a OPERATING DATA REPORT 50-335 S DOCKET NO.
DATE . 11 14 R3 COMPLETED BY M A t'.2"t TELEPHONE (305}552-3675 OPERATING STATUS
- 1. Unit Name: St. Lucie Unit #1 $'j't #1 remained out of serv-October,1983
. 2. Reporting Period: ice for refueling and schedul ed 2700 maintenance
- 3. Licensed Thennal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe)h30
- 6. Maximum Dependable Capacity (Gross MWe): 867
- 7. Maximum Dependable Capacity (Net MWe): 822
- 8. If Changes Occur in Capacity Ratings (Items Nun'5tr 3 Through 7) Since Last Report, Give Reasons:
- 9. PowerI.svelTo Which Restricted.If Any(Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr to-Date Cmnulative I!! Hours In Reporting Period 745 7296 60144
- 12. Number Of Hours Reactor Was Critical 0 1366~. 9 44466.1
- 13. Reactor Reserve Shutdown Hours 0 0 '
205.3'
- 14. Hours Generator On-Line 0 1350.9 43576.2 U U 39 3
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWH) 0 3352422 10866793A- -
- 17. Gross Electrical Energy Generated (MWH) 0 , _ . 1160280 35373875
- 18. Net Electrical Energy Generated (MWH)* - 3435 1076016 33340207
- 19. Unit Service Factor 0 1g g 79 g
- 20. Unit .tysilability Factor 0 18'5. 72.5
- 21. Unit Capacity Factor (Using MDC Net) 0 18,0 70.4
- 22. Unit Capacity Factor (Using DER Net) 0 17.8 68.5
- 23. Unit Forced Outage Rate 0 1.1 L(;
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Ma rc h. 1983
- 26. Units in Test Status (Prior t? Commercial Operation): Forecast Athined INITIA L CRITICALITY . _ _
INITIA L ELECTRICITY. _
COMMERCIAL OPERATION ,_
(9/77)
s -
DOCKET NO. 50-335 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME St Lucie #1 ,
DATE 11-15-83 COMPLETED ay N.W. Grant REPORT MONTH October. 1983 TELEPHONE (3051552-3675 e.
E E
, .53 3j _*D Licensee En, {g Cause & Corrective No. Date g ~g 2s$ Event g? g'? Action to
- $ Repor a en U
$5 e~
u dj :g: u e
i Prevent Recurrence C
3 830226 S 744 C 4 RC- FUELXX Unit remained out of service for refueling and scheduled maintenance.
I 2 3 4 f: Forced Reason: Method: Exhibit G . Instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance oiTest 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & License Examination
, F. Administrative p ,
5 G-Operational Error (Fxplain) 6. t o a o a s o w v..cl Exhibit I Same Source t<8/77) II-Ot her (Explain)
j' *
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO._ 50-335 UNIT ST. Lucie Unit'l DATE November, 15,1983 COMPLETED BY P.L. Pace
' TELEPHONE 305/5523654 4
REPORT MONTH October, 1983 ST. Lucie Unit I remained out of service -for a refueling and maintenance outage.
Major. safety related main'tenance included:
Two heat tracing circuits were replaced.
A diesel generator engine was repaired, A containment spray pump motor was adjusted.
Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are co ntinui ng . Refer to carrespondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no
. challenges to PORV or safety valves during the report month.
See correspondence between FPL- and NRC for information concerning the thermal shield.
W n e - , , - ,-
r_ _
- . AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-389 UNIT St. Lucie Unit #2 DATE 11-15-83 COMPLETED BY N u f:rar.t TELEPflONE (305)S52-3675 MONm October, 1983 -
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL
~
IMWe Net) -(MWe-Neti
'788 1
17 798 2 809 808 18 19 808 4 750 20 807 8 I09 21 808 6 724 759 22 806 7 23 806 8 808 800 24 25 774 780 to 26 808 11 805 27 Rn7 12 799 809 28 808 13 29 810 14 808 30 809 IS 806 31 799 806 16 INSTRUCTIONS On this fonnai,hst the average daily unit power leselin MWe Net for each day m the reporting month. Compute to the nearest whole enegawatt.
(9/771
.= \
OPERATING DATA REPORT DOCKET NO.
50-389 -
DATE .11-15-83 COMPLETED BY fLW_ Grant TELEPliONE (.qndRR7 1675 OPERATING STATUS
- 1. Unit Name: O Lucie tinit #2 M'{s 2 operated at essential-
- 2. Reporting Period: October, 1983 ly full power except as noted 2560 in the unit shutdowns and, powe r
- 3. Licensed Thermal Power (MWt): .
- 4. Nameplate Rating (Gross MWe): 850 reductions report.
804 S. Design Electrical Rating (Net MWe): ,
- 6. Maximum Dependable Capacity (Gross MWe): Al?
- 7. Maximum Dependable Capacity (Net MWe): 7R6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if ny (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to Date
- Cumulative 11.' Hours in Reporting Period 745 2041 2041
- 12. Number Of Hours Reactor Was Critical .738.3 1763 1763
- 13. Reactor Reserve Shutdown Hours n 0 'O _
- 14. Hours Generator On-Line 715.5 1666.4 1666.4 0 0 0
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generat-d (MWif) 1828385 3947918 3947918 .
- 17. Gross Electrical Energy Generated (MWH) 607530 , _ ,
1302310 1302310
- 18. Net Electrical Energy Generated (MWH) 574439 1222452 _1222452
~
- 19. Unit Service Factor QR 7 R1 6 R1. 6
- 20. Unit Availability Factor 98.7 81.6 81.6
- 21. Unit Capacity Factor (Using MDC Net) 98.1 76.2- 76.2
- 22. Unit Capacity Factor (Using DER Net) 95.9 74.5. 74.5
- 23. Unit Forced Outage Rate 1.3 18.4 18.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiacd INITIA L CRITICALITY __
INITIA L ELECTRICITY _
COMMERCIAL OPERATION _ _ .
- These ' column's contain data from the date of commercial operation only. )
es/771
s .
]
UNITSifUTDOWNS AND POWER REDUCTIONS DOCKliT NO. 50?389 UNIT NAME ST. Lucie Unit #2 DATE 11-15-83 REPORT MONTH nehhar - 1983 COMPl.ETED W HE neant TELEPHONE 7ns/947 1675 e.
- E E L.
c.
.! ? 3g y .5 E Licensee ,E, vo
$"'. Cause & Corrective Date 3g jg5 Event g o. E Actio to P
$5 $ j5g Report a to O
}0 Prevent Recurrence d
9 831003 S 0.0 H 5 XX XXXXXX Power reduced for turbine valve testing, and condensate pump strainer EleadirJg .
10 831004 F 9.5 A 3 IA INSTRU Turbine tripped and reactor tripped as a result of excess feed due to fuse failure in steam generator level transmitter. Unit returned at reduced power for chemistry and axial shape index reasons. Unit at full power 10/6/83. ,
I 2 3 4 f Forced Reason: Method:
S. Scheduled Exhibit G Instructions A Lyuipment Fa:!ure(Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scra.n. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161) 1:-Operator Training & Ucense Examination
, F-Administrative p ,
G Operational lirror ( F xplain) c Aoao asove.v. .,/ Exhibit I Same Source 49/77) Il-Ot her ( E xplain)
L(. ., *
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT ST. Lucie Unit'2 DATE November 15',1983 COMPLETED BY' P. L. Pace TELEPHONE 305/552-3654 REPORT.HONTH' October, 1983 See the Unit Shutdowns -and Power Reductions report for details on unit outages.
. Major safety related maintenance included:
Charging pumps leaks were repaired.
HPSI pump leaks were repaired Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
. Florida Power & Light Company Commitments for MUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional .
information.
In accordance with requirements of Technical Specification 6.9.1.6, there were 'no challenges to PORV or safety valves during the report month.
I L
l i
w-
P, FLORIDA POWER & LIGHT COMPANY November 15, 1983 PNS-LI-83-706 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Attached are the October 1983 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. 1 and 2.
Very truly yours, s
J. W. Williams, Jr.
Vice President Nuclear Energy Department JWW/PLP/js Attachment cc: J. P. O'Reilly, Region II 50.,
t t l PEOPLE. . SERVING PEOPLE
- - - - -- ._- -